2007-23-12 Boeing: Amendment 39-15258. Docket No. FAA-2007-28828; Directorate Identifier 2007-NM-010-AD. \n\nEffective Date \n\n\t(a) This AD becomes effective December 18, 2007. \n\nAffected ADs \n\n\t(b) None. \n\nApplicability \n\n\t(c) This AD applies to all Boeing Model 707-100 long body, -200, -100B long body, and -100B short body series airplanes; and Model 707-300, -300B, -300C, and -400 series airplanes; and Model 720 and 720B series airplanes; certificated in any category. \n\nUnsafe Condition \n\n\t(d) This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent certain failures of the fuel pumps or fuel quantity indication system (FQIS), which could result in a potential ignition source inside the fuel tank, which, in combination with flammable fuel vapors, could result in fuel tank explosion and consequent loss of the airplane. \n\nCompliance \n\n\t(e) You are responsible for having the actions required by this AD performed withinthe compliance times specified, unless the actions have already been done. \n\nAirplane Survey \n\n\t(f) Within 12 months after the effective date of this AD: Conduct an airplane survey that defines the configuration of system installations for the wing leading edges, wing-to-body area, electrical equipment bay, flight deck, and FQIS using a method approved in accordance with the procedures specified in paragraph (h)(1) of this AD. If any discrepancy is detected, repair before further flight using a method approved in accordance with the procedures specified in paragraph (h)(1) of this AD. Submit the survey results to the Manager, Seattle Aircraft Certification Office (ACO), FAA, 1601 Lind Avenue SW., Renton, Washington 98057-3356, at the applicable time specified in paragraph (f)(1) or (f)(2) of this AD. The report must include the survey results (e.g., photographs and sketches, part numbers of FQIS components and fuel pumps, and the actual configuration of FQIS and the fuel pump control systems), a description of any discrepancy found, the airplane serial number, and the number of landings and flight hours on the airplane. Under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has approved the information collection requirements contained in this AD and has assigned OMB Control Number 2120-0056. \n\n\t(1) If the survey was done after the effective date of this AD: Submit the report within 30 days after the survey. \n\t(2) If the survey was done before the effective date of this AD: Submit the report within 30 days after the effective date of this AD. \n\n\tNote 1: For the purposes of this AD, ''discrepancy'' is defined as any wear or deterioration (e.g., damage, fluid leaks, corrosion, cracking, or system failures) that might prevent the airplane from being in an airworthy condition. \n\nModification of Fuel System \n\n\t(g) Within 72 months after the effective date of this AD: Modify the fuel system as specified in paragraphs (g)(1), (g)(2), and (g)(3) of this AD, using a method approved in accordance with the procedures specified in paragraph (h)(1) of this AD. \n\n\t(1) Replace the FQIS wire bundle along the leading edge of the left and right wings with a new wire bundle that has a lightning shield that is separated from other wiring. \n\n\t(2) Replace each fuel pump relay with a ground fault interrupter relay\n\n\t(3) Install redundant power relays for the center tank fuel pumps and uncommanded on-indication lights at the flight engineer's panel. \n\nAlternative Methods of Compliance (AMOCs) \n\n\t(h)(1) The Manager, Seattle ACO has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. \n\n\t(2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. \n\nMaterial Incorporated by Reference \n\n\t(i) None. \n\nAppendix 1. Model 707 SFAR 88 Survey Areas\n\nModel 707 SFAR-88 Survey\n\n To support the development of the modifications required by this AD, a survey of the airplane is required to identify the current systems configuration, potential locations for new components, and potential wiring routes. The survey should examine the following areas of the airplane: flight deck, electrical equipment (E/E) bay, mix bay, left and right wing-to-body areas, left and right wing leading edges, and inside the fuel tanks. The report should consist \nof part numbers of the fuel quantity indication system (FQIS) components and fuel pumps, schematics for the FQIS and fuel pump control systems, and photos with dimensions and body and/or wing stations identified depicting the information below. Video, sketches or marked up drawings may also be acceptable.\n\n(1) Flight Deck\n\n Places for new circuit breakers that may be installed on the P1, P2, P3, P4 and/or P5 panels.\n\n Places for new indication lights that may be installed in the lower P11 panel.\n\n Photos of the flight deck area above and below the engineer's panel and on the opposite side showing the existing wire bundle routing with the ceiling and side panels removed. This could be used to route additional wire bundles to the E/E bay.\n\n Part number(s) of the FQIS indicators installed in the P11 panel.\n\n Verify if a remote trimmer is installed for this \nindicator.\n\n(2) E/E Bay\n\n Photos of any location within the E/E bay where there is enough space to install an electrical junction box, up to a 22 x 12 x 4.0 inch area. Possible locations are along the body structure and beneath the cabin floor.\n\n(3) Mix Bay\n\n Photos showing the tubing and duct routing from the wing section.\n\n Photos of the current wire bundles in the mix bay.Photos for the installation of an electrical junction box, up to a 9 x 6 x 6 inch area.\n\n Photos from both inside the aircraft fuselage showing the wire routing and pressure vessel penetration.\n\n(4) Leading Edge\n\n Photos of the FQIS connectors on the front spar for all fuel tanks.\n\n Photos of the front spar from the reserve tank to the center tank. Photos should show tubing installations, existing wire harnesses, pneumatic ducts, etc.\n\n Photos of areas between the engine struts, outboard of engine 1 and 4, and between the inboard strut and side of body with a free 9 x 3 x 5 inch accessible area. New FQIS wire routing should have a minimum of 2 inch separation from existing wires, a new location for FQIS spar penetration connectors may be necessary.\n\n Photos of the front spar and seal ribs with in the strut area with the access panels removed.\n\n(5) Wing to Body (Un-Pressurized Wire Penetrations)\n\n Photos of the existing wire bundle penetrations through the pressure vessel and a 3 foot radius area around the existing wire bundle penetrations in the wing to body fairing (view from the front spar looking inboard).\n\n(6) Fuel Tanks (Non-Explosion Proof Equipment Is Generally Not Allowed Inside Fuel Tanks)\n\n Photos of the FQIS probes and the wiring for the probes.\n\n Photos along the wiring to the spar penetration.\n\n Photos of the internal tank structure and plumbing.\n\n If, while accomplishing the survey, any discrepancy with the structure, fuel system, or other systems is found, repairs must be accomplished prior to further flight in accordance with this AD.