2008-04-18 R1 Empresa Brasileira de Aeronautica S.A. (EMBRAER): Amendment 39-16071. Docket No. FAA-2009-1001; Directorate Identifier 2009-NM-166-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective November 16, 2009.
Affected ADs
(b) This AD revises AD 2008-04-18, Amendment 39-15390.
Applicability
(c) This AD applies to all EMBRAER Model EMB-120, -120ER, - 120FC, -120QC, and -120RT airplanes; certificated in any category.
Note 1: This AD requires revisions to certain operator maintenance documents to include new inspections. Compliance with these inspections is required by 14 CFR 91.403(c). For airplanes that have been previously modified, altered, or repaired in the areas addressed by these inspections, the operator may not be able to accomplish the inspections described in the revisions. In this situation, to comply with 14 CFR 91.403(c), the operator must request approval for an alternative method of compliance according to paragraph (g)(1) of this AD. The request should include a description of changes to the required inspections that will ensure the continued operational safety of the airplane.
Subject
(d) Air Transport Association (ATA) of America Code 28: Fuel.
Reason
(e) The mandatory continuing airworthiness information (MCAI) states:
It has been found that former revisions of the Maintenance Review Board Report (MRBR) of the EMB-120() aircraft do not fully comply with some Critical Design Configuration Control Limitations (CDCCL) and Fuel System Limitations (FSL). These limitations are necessary to preclude ignition sources in the fuel system, as required by RBHA-E88/SFAR-88 (Special Federal Aviation Regulation No. 88).
Since this condition affects flight safety, a corrective action is required. Thus, sufficient reason exists to request compliance with this AD in the indicated time limit.
The potential of ignition sources, in combination with flammable fuel vapors, could result in fuel tank explosions and consequent loss of the airplane. The corrective action is revising the Airworthiness Limitations Section (ALS) of the Instructions for Continued Airworthiness to incorporate new limitations for fuel tank systems.
Restatement of AD 2008-04-18 With Changes to Compliance Method
Actions and Compliance
(f) Unless already done, do the following actions.
(1) Within 1 month after April 3, 2008 (the effective date of AD 2008-04-18), revise the ALS of the Instructions for Continued Airworthiness to incorporate Tasks 15 to 18 of Section 6--"Part E-- Fuel System Limitations,'' EMBRAER Temporary Revision No. 22-1, dated November 18, 2005, of the EMBRAER EMB-120 Brasilia Maintenance Review Board Report (MRBR), MRB-HI-200. For all tasks identified in the MRBR, the initial compliance times start from the later of the times specified in paragraphs (f)(1)(i) and (f)(1)(ii) of this AD, and the repetitive inspections must be accomplished thereafter at the interval specified in the MRBR, except as provided by paragraphs (f)(3) and (g)(1) of this AD.
(i) April 3, 2008.
(ii) The date of issuance of the original Brazilian standard airworthiness certificate or the date of issuance of the original Brazilian export certificate of airworthiness.
(2) Within 1 month after April 3, 2008, revise the ALS of the Instructions for Continued Airworthiness to incorporate the CDCCLs to include items (1) and (2), dated March 22, 2005, of Section 6-- "Part D--Critical Design Configuration Control Limitation,'' of the EMBRAER EMB-120 Brasilia MRBR, MRB-HI-200.
(3) For the functional checks and detailed visual inspections, Tasks 15 to 18 of Section 6--"Part E--Fuel System Limitations,'' EMBRAER Temporary Revision No. 22-1, dated November 18, 2005, of the EMBRAER EMB-120 Brasilia MRBR, MRB-HI-200: The initial compliance time is within 4,000 flight hours or 48 months after April 3, 2008, whichever occurs first. Thereafter those tasks must be accomplished at the repetitive interval specified in Section 6--"Part E--Fuel System Limitations,'' EMBRAER Temporary Revision No. 22-1, dated November 18, 2005, of the EMBRAER EMB-120 Brasilia MRBR, MRB-HI-200.
(4) After accomplishing the actions specified in paragraphs (f)(1) and (f)(2) of this AD, no alternative inspections, inspection intervals, or CDCCLs may be used unless the inspections, intervals, or CDCCLs are approved as an alternative method of compliance in accordance with the procedures specified in paragraph (g)(1) of this AD.
New Information
Explanation of CDCCL Requirements
Note 2: Notwithstanding any other maintenance or operational requirements, components that have been identified as airworthy or installed on the affected airplanes before the revision of the ALS, as required by paragraph (f) of this AD, do not need to be reworked in accordance with the CDCCLs. However, once the ALS has been revised, future maintenance actions on these components must be done in accordance with the CDCCLs.
FAA AD Differences
Note 3: This AD differs from the MCAI and/or service information as follows: No differences.
Other FAA AD Provisions
(g) The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to ATTN: Todd Thompson, Aerospace Engineer, International Branch, ANM-116, Transport Airplane Directorate, FAA, 1601 Lind Avenue, SW., Renton, Washington 98057-3356; telephone (425) 227-1175; fax (425) 227-1149. Before using any approved AMOC on any airplane to which the AMOC applies, notify your principal maintenance inspector (PMI) or principal avionics inspector (PAI), as appropriate, or lacking a principal inspector, your local Flight Standards District Office. The AMOC approval letter must specifically reference this AD.
(2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service.
(3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act, (44 U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056.
Related Information
(h) Refer to MCAI Brazilian Airworthiness Directive 2007-05-02, effective June 6, 2007; EMBRAER Temporary Revision No. 22-1, dated November 18, 2005, of the EMBRAER EMB-120 Brasilia MRBR, MRB-HI-200; and Section 6--"Part D--Critical Design Configuration Control Limitation,'' of the EMBRAER EMB-120 Brasilia MRBR, MRB-HI-200; for related information.
Material Incorporated by Reference
(i) You must use EMBRAER Temporary Revision No. 22-1, dated November 18, 2005, of the EMBRAER EMB-120 Brasilia Maintenance Review Board Report, MRB-HI-200; and pages 6.III.1 and 6.III.2, dated March 22, 2005, of Section 6--"Part D--Critical Design Configuration Control Limitation,'' of the EMBRAER EMB-120 Brasilia Maintenance Review Board Report, MRB-HI-200; as applicable; to do the actions required by this AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register previously approved the incorporation by reference of this service information on April 3, 2008 (73 FR 10655, February 28, 2008).
(2) For service information identified in this AD, contact Empresa Brasileira de Aeronautica S.A. (EMBRAER), Technical Publications Section (PC 060), Av. Brigadeiro Faria Lima, 2170-- Putim--12227-901 S[atilde]o Jose dos Campos--SP--Brasil; telephone: +55 12 3927-5852 or +55 12 3309-0732; fax: +55 12 3927-7546; e-mail: distrib@embraer.com.br; Internet: http://www.flyembraer.com.
(3) You may review copies of the service information at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington. For information on the availability of this material at the FAA, call 425-227-1221 or 425-227-1152.
(4) You may also review copies of the service information that is incorporated by reference at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ ibr_locations.html.