2009-14-10 EADS-PZL Warszawa-Okecie S.A.: Amendment 39-15960; Docket No. FAA-2009-0446; Directorate Identifier 2009-CE-024-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective August 12, 2009.
Affected ADs
(b) This AD supersedes AD 2009-09-04, Amendment 39-15890.
Applicability
(c) This AD applies to Model PZL-104 WILGA 80 airplanes, all serial numbers, certificated in any category.
Subject
(d) Air Transport Association of America (ATA) Code 53: Fuselage.
Reason
(e) The mandatory continuing airworthiness information (MCAI) states:
An inspection of a PZL-104 aeroplane that had a relatively long operational background revealed a severe corrosion of the steel front fuselage structural elements.
It is likely that such corrosion can also be present on other aeroplanes of similar design and operational history.
If left uncorrected, this condition could lead to loss of strength of the structural front posts elements and consequent reduction of the structural strength of the aeroplane.
For the reason stated above, this Airworthiness Directive (AD) mandates inspecting the fuselage front posts, repairing any corrosion found and replacing pads made of foam rubber by pads made of Neoprene to prevent water ingression.
Actions and Compliance
(f) Unless already done, do the following actions:
(1) Within 12 years from date of manufacture or within the next 2 months after May 18, 2009 (the effective date of AD 2009-09-04), whichever occurs later, inspect the fuselage front posts for signs of corrosion following paragraph 6.A. of EADS PZL "Warszawa- Okecie'' S.A. Mandatory Bulletin No. 10409036, dated March 18, 2009.
(2) If corrosion or any corrosion damage is found during the inspection required in paragraph (f)(1) of this AD, before further flight, repair or replace any parts where corrosion or corrosion damage was found in accordance with an FAA-approved repair solution obtained from EADS-PZL "Warszawa-Okecie'' S.A, Aleja Krakowska 110/114, 00-971 Warszawa, Poland; telephone: +48 22 577 22 11; fax: +48 22 577 22 03; e-mail: eadsplz@plz.eads.net.
(3) Within 12 years from date of manufacture or within the next 2 months after May 18, 2009 (the effective date of AD 2009-09-04), whichever occurs later, replace the rear glass padding following paragraph 6.C. of EADS PZL "Warszawa-Okecie'' S.A. Mandatory Bulletin No. 10409036, dated March 18, 2009.
(4) Within 2 months after August 12, 2009 (the effective date of this AD), amend the approved operator's airplane maintenance program to incorporate the applicable tasks as described in PZL-104 Wilga 80 Maintenance Manual, pages 5-4 and 25-10, dated April 7, 2009.
FAA AD Differences
Note: This AD differs from the MCAI and/or service information as follows: No differences.
Other FAA AD Provisions
(g) The following provisions also apply to this AD:
(1) Alternative Methods of Compliance (AMOCs): The Manager, Standards Office, FAA, has the authority to approve AMOCs for this AD, if requested using the procedures found in 14 CFR 39.19. Send information to Attn: Doug Rudolph, Aerospace Engineer, FAA, Small Airplane Directorate, 901 Locust, Room 301, Kansas City, Missouri 64106; telephone: (816) 329-4059; fax: (816) 329-4090. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO.
(2) Airworthy Product: For any requirement in this AD to obtain corrective actions from a manufacturer or other source, use these actions if they are FAA-approved. Corrective actions are considered FAA-approved if they are approved by the State of Design Authority (or their delegated agent). You are required to assure the product is airworthy before it is returned to service.
(3) Reporting Requirements: For any reporting requirement in this AD, under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has approved the information collection requirements and has assigned OMB Control Number 2120-0056.
Related Information
(h) MCAI European Aviation Safety Agency (EASA) AD No.: 2009- 0072, dated March 31, 2009, EADS PZL "Warszawa-Okecie'' S.A. Mandatory Bulletin No. 10409036, dated March 18, 2009; and PZL-104 Wilga 80 Maintenance Manual, pages 5-4 and 25-10, dated April 7, 2009, for related information.
Material Incorporated by Reference
(h) You must use EADS PZL "Warszawa-Okecie'' S.A. Mandatory Bulletin No. 10409036, dated March 18, 2009; and PZL-104 Wilga 80 Maintenance Manual, pages 5-4 and 25-10, dated April 7, 2009, to do the actions required by this AD, unless the AD specifies otherwise.
(1) The Director of the Federal Register approved the incorporation by reference of PZL-104 Wilga 80 Maintenance Manual, pages 5-4 and 25-10, dated April 7, 2009, under 5 U.S.C. 552(a) and 1 CFR part 51.
(2) On May 18, 2009 (74 FR 18979; April 27, 2009), the Director of the Federal Register previously approved the incorporation by reference of EADS PZL "Warszawa-Okecie'' S.A. Mandatory Bulletin No. 10409036, dated March 18, 2009.
(3) For service information identified in this AD, contact EADS- PZL "Warszawa-Okecie'' S.A., Aleja Krakowska 110/114, 00-971 Warszawa, Poland; telephone: +48 22 577 22 11; fax: +48 22 577 22 03; e-mail: eadsplz@plz.eads.net; Internet: http://www.eads.net/ 1024/en/businet/airbus/airbus_military/pzl/pzl.html.
(4) You may review copies of the service information incorporated by reference for this AD at the FAA, Central Region, Office of the Regional Counsel, 901 Locust, Kansas City, Missouri 64106. For information on the availability of this material at the Central Region, call (816) 329-3768.
(5) You may also review copies of the service information incorporated by reference for this AD at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http:// www.archives.gov/federal_register/code_of_federal_regulations/ ibr_locations.html.