2008-10-08 Empresa Brasileira de Aeronautica S.A. (EMBRAER): Docket No. FAA-2008-0516; Directorate Identifier 2008-NM-026-AD; Amendment 39-15514.
Effective Date
(a) This AD becomes effective May 23, 2008.
Affected ADs
(b) This AD supersedes AD 2005-26-15.
Applicability
(c) This AD applies to EMBRAER Model EMB-135BJ, -135ER, -135KE, -135KL, and -135LR airplanes; and Model EMB-145, -145ER, -145MR, - 145LR, -145XR, -145MP, and -145EP airplanes, certificated in any category; serial numbers 145001 through 145189 inclusive, 145191 through 145362 inclusive, 145364 through 145373 inclusive, 145375, 145377 through 145411 inclusive, 145413 through 145424 inclusive, 145426 through 145430 inclusive, 145434 through 145436 inclusive, 145440 through 145445 inclusive, 145448, 145450, and 145801; equipped with a mechanical gust lock system.
Unsafe Condition
(d) This AD results from additional reports of failure of the mechanical gust lock system to protect the elevator control surfaces and components from high wind gusts. We are issuing this AD to prevent discrepancies in the elevator control system, which could result in reduced control of the elevator and consequent reduced controllability of the airplane.
Compliance
(e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Restatement of the Requirements of AD 2005-26-15 With Certain Revised Compliance Times/Requirements
Repetitive Inspections
(f) Within 800 flight hours after February 3, 2006 (the effective date of AD 2005-26-15), do a detailed inspection of the elevator control system for any crack, rupture, or bend in any component, in accordance with the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0087, Change 03, dated September 27, 2002. Where this service bulletin specifies to return discrepant parts and report inspection results to the manufacturer, this AD does not require these actions. Repeat the inspection thereafter at intervals not to exceed 2,500 flight hours or 15 months, whichever is first.
Note 1: For the purposes of this AD, a detailed inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required."
Replacement of Discrepant Parts
(g) If any discrepant part is found during any inspection required by paragraph (f) of this AD, before further flight, replace the discrepant part with a new part, in accordance with the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0087, Change 03, dated September 27, 2002.
Modification(h) At the applicable time specified in paragraph (j) of this AD: Modify the elevator gust lock by accomplishing paragraph (h)(1) or (h)(2) of this AD, as applicable. Accomplishment of the modification terminates the repetitive inspections required by paragraph (f) of this AD. Doing the actions required by paragraph (h)(1) or (h)(2) of this AD, as applicable, also terminates the requirements of AD 2008-03-03, amendment 39-15352. This AD does not mandate installing new electrical grounding for the gust lock system actuator at the horizontal stabilizer structure in accordance with EMBRAER Service Bulletin 145-27-0075, Revision 09, dated November 8, 2006; or EMBRAER Service Bulletin 145-27-0086, Revision 05, dated November 8, 2006.
(1) For airplanes listed in EMBRAER Service Bulletin 145-27- 0075, Revision 08, dated March 3, 2005: Do paragraph (h)(1)(i) or (h)(1)(ii) of this AD, as applicable, and install a new spring cartridge and implement new logic for the electromechanical gust lock system by doing all actions in section 3.D. (Part IV) of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0075, Revision 08, dated March 3, 2005; or Revision 09, dated November 8, 2006. After the effective date of this AD, Revision 09 of the service bulletin must be used. After accomplishing the actions in EMBRAER Service Bulletin 145-27-0101, as specified in the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0075, Revision 08 or Revision 09; the airplane flight manual (AFM) revision required by AD 2002-26-51, amendment 39-13008, may be removed from the Limitations section of the EMBRAER EMB-145 AFM. Accomplishing the actions specified in the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0102, as specified by EMBRAER Service Bulletin 145-27-0075, Revision 08 or Revision 09, terminates the repetitive inspections required by AD 2005-24-11, amendment 39-14391.
(i) Replace the mechanical gust lock system with an electromechanical gust lock system, and replace the control stand with a reworked control stand, by doing all the actions (including a detailed inspection to ensure that certain parts have been removed previously per EMBRAER Service Bulletin 145-27-0076) in and per section 3.A. (Part I) or 3.B. (Part II), as applicable, of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0075, Revision 08 or Revision 09. If the inspection reveals that certain subject parts have not been removed previously, before further flight, remove the subject parts in accordance with EMBRAER Service Bulletin 145-27-0075, Revision 08 or Revision 09. Where Parts I and II of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0075, Revision 08 or Revision 09, specify to remove and "send the control stand to be reworked in a workshop," replace the control stand with a control stand reworked as specified in EMBRAER Service Bulletin 145-27-0075, Revision 08 or Revision 09. After the effective date ofthis AD, Revision 09 of the service bulletin must be used for the actions required by this paragraph.
(ii) Replace the return spring and spring terminal of the gust lock control lever with improved parts by doing all the actions in and per section 3.C. (Part III) of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0075, Revision 08 or Revision 09. After the effective date of this AD, Revision 09 of the service bulletin must be used.
Note 2: Part IV of the Accomplishment Instructions of EMBRAER Service Bulletins 145-27-0075, Revision 08 and Revision 09, refers to EMBRAER Service Bulletin 145-27-0101, Revision 02, dated December 27, 2004; and EMBRAER Service Bulletin 145-27-0102, Revision 02, dated January 20, 2005; as additional sources of instructions for accomplishing the installation of a new spring cartridge and implementation of the new logic for the electromechanical gust lock system.
(2) For airplanes listed in EMBRAER Service Bulletin 145-27- 0086, Change 04, dated March 21, 2005: Do paragraphs (h)(2)(i), (h)(2)(ii), (h)(2)(iii), and (h)(2)(iv) of this AD, as applicable.
(i) Rework the tail carbon box and the horizontal stabilizer by doing all the actions (including the inspection for delamination) in and per section 3.A. (Part I) of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04; or Revision 05, dated November 8, 2006. After the effective date of this AD, Revision 05 of the service bulletin must be used. If any delamination is found that is outside the limits specified in EMBRAER Service Bulletin 145-27-0086, Change 04 or Revision 05, before further flight, repair per a method approved by either the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; the Departmento de Aviacao Civil (or its delegated agent); or the Ag ncia Nacional de Avia o Civil (or its delegated agent).
(ii) Install wiring and electrical components by doing all the actions in and per section 3.B. (Part II) of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04 or Revision 05. After the effective date of this AD, Revision 05 of the service bulletin must be used.
(iii) Install and activate the electromechanical gust lock system by doing all the actions in section 3.D. (Part IV) of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04 or Revision 05. Where Part IV of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04 or Revision 05, specifies to remove and "send the control stand to be reworked in a workshop," replace the control stand with a control stand reworked as specified in Part III of the service bulletin. After the effective date of this AD, Revision 05 of the service bulletin must be used.
(iv) Install a new spring cartridge and implement new logic for the electromechanical gust lock system by doing all applicable actions in section 3.E. (Part V) of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04 or Revision 05. After the effective date of this AD, Revision 05 of the service bulletin must be used. After accomplishing the actions in EMBRAER Service Bulletin 145-27-0101; as specified in the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04 or Revision 05; the AFM revision required by AD 2002-26-51, amendment 39-13008, may be removed from the Limitations section of the EMBRAER EMB-145 AFM. Accomplishing the actions in EMBRAER Service Bulletin
145-27-0102; as specified in the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04 or Revision 05; terminates the repetitive inspections required by AD 2005-24-11, amendment 39-14391.
Note 3: Part V of the Accomplishment Instructions of EMBRAER Service Bulletin 145-27-0086, Change 04 and Revision 05, refers to EMBRAER Service Bulletin 145-27-0101, Revision 02, dated December 27, 2004; and EMBRAER Service Bulletin 145-27-0102, Revision 02, dated January 20, 2005; as additional sources of instructions for accomplishing the installation of a new spring cartridge and implementation of the new logic for the electromechanical gust lock system.
Actions Accomplished Previously
(i) Actions accomplished before February 3, 2006, are acceptable for compliance with the corresponding requirements of this AD, as specified in paragraphs (i)(1), (i)(2), and (i)(3) of this AD.
(1) Modification of the elevator gust lock system before February 3, 2006, in accordance with EMBRAER Service Bulletin 145- 27-0075, Change 06, dated July 16, 2002, is acceptable for compliance with paragraph (h)(1) of this AD, provided that, within the compliance time specified in paragraph (h) of this AD, a new spring cartridge is installed and new logic for the electromechanical gust lock system is implemented in accordance with Part IV of EMBRAER Service Bulletin 145-27-0075, Revision 07, dated March 2, 2004, or Revision 08, dated March 3, 2005.
(2) Modification of the elevator gust lock system before February 3, 2006, in accordance with EMBRAER Service Bulletin 145- 27-0075, Revision 07, dated March 2, 2004, is acceptable for compliance with paragraph (h)(1) of this AD.
(3) Modification of the elevator gust lock system before February 3, 2006, in accordance with EMBRAER Service Bulletin 145- 27-0086, Change 02, dated December 23, 2003; or EMBRAER Service Bulletin 145-27-0086, Change 03, dated April 14, 2004; is acceptable for compliance with paragraph (h)(2) of this AD.
Reduced Compliance Time for Required Modification
(j) For airplanes on which the modification of the elevator gust lock system specified in paragraph (h) of this AD has not been done as of the effective date of this AD: At the earlier of the times specified in paragraphs (j)(1) and (j)(2) of this AD, accomplish the actions required by paragraph (h)(1) or (h)(2) of this AD, as applicable.
(1) Within 10,000 flight hours after February 3, 2006, or within 60 months after February 3, 2006, whichever occurs first.
(2) Within 90 days after the effective date of this AD, or 500 flight hours after the effective date of this AD, whichever occurs later.
Alternative Methods of Compliance (AMOCs)
(k)(1) The Manager, International Branch, ANM-116, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19.
(2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO.
Related Information
(l) None.
Material Incorporated by Reference
(m) You must use the service information identified in Table 1 of this AD to perform the actions that are required by this AD, as applicable, unless the AD specifies otherwise.
Table 1.--All Material Incorporated by Reference
EMBRAER Service Bulletin
Revision/Change Level
Date
145-27-0075
Revision 08
March 3, 2005
145-27-0075
Revision 09
November 8, 2006
145-27-0086
Change 04
March 21, 2005
145-27-0086
Revision 05
November 8, 2006
145-27-0087
Change 03
September 27, 2002
(1) The Director of the Federal Register approved the incorporation by reference of the service information identified in Table 2 of this AD in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.
Table 2.--New Material Incorporated by Reference
EMBRAER Service Bulletin
Revision/Change Level
Date
145-27-0075
Revision 09
November 8, 2006
145-27-0086
Revision 05
November 8, 2006
(2) On February 3, 2006 (70 FR 77303, December 30, 2005), the Director of the Federal Register approved the incorporation by reference of the service information identified in Table 3 of this AD.
Table 3.--Material Previously Incorporated by Reference
EMBRAER Service Bulletin
Revision/Change Level
Date
145-27-0075
Revision 08
March 3, 2005
145-27-0086
Change 04
March 21, 2005
145-27-0087
Change 03
September 27, 2002
(3) Contact Empresa Brasileira de Aeronautica S.A. (EMBRAER), P.O. Box 343, CEP 12.225, Sao Jose dos Campos, SP, Brazil, for a copy of this service information. You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/ federal- register/cfr/ibr-locations.html.