2007-01-02 McDonnell Douglas: Amendment 39-14873. Docket No. FAA 2006-25089; Directorate Identifier 2006-NM-091-AD. \n\nEffective Date \n\n\t(a) This AD becomes effective February 14, 2007. \n\nAffected ADs \n\n\t(b) This AD supersedes AD 2004-01-17. \n\nApplicability \n\n\t(c) This AD applies to McDonnell Douglas Model MD-11 and -11F airplanes, as identified in Boeing Alert Service Bulletin MD11- 54A011, Revision 3, dated November 9, 2005; certificated in any category. \n\nUnsafe Condition \n\n\t(d) This AD results from reports of integrated drive generator (IDG) power feeder cables riding against structure and fuel lines in the No. 1 and No. 3 pylons. We are issuing this AD to prevent potential chafing of the power feeder cables of the IDG in engine pylons No. 1 and No. 3 on the wings, and consequent arcing on the fuel lines in the engine pylons and possible fuel fire. \n\nCompliance \n\n\t(e) You are responsible for having the actions required by this AD performed within the compliancetimes specified, unless the actions have already been done. \n\nRestatement of Requirements of AD 2004-01-17 \n\n\tNote 1: Boeing has issued Information Notice MD11-54A011 R02 IN 02, dated July 11, 2002. The information notice informs operators of a typographical error for the string tie part number (P/N) specified in Boeing Alert Service Bulletin MD11-54A011, Revision 02, dated May 31, 2002. The service bulletin specifies string tie P/N 190L0F21G/A; the correct P/N is 109 LOF 21G/A. \n\nInitial Inspection \n\n\t(f) Within 30 days after February 24, 2004 (the effective date of AD 2004-01-17), do a general visual inspection of the power feeder cables of the IDG and the fuel feed lines of engine pylons No. 1 and No. 3 on the wings for proper clearance and damage, per Boeing Alert Service Bulletin MD11-54A011, Revision 02, dated May 31, 2002; or Boeing Alert Service Bulletin MD11-54A011, Revision 3, dated November 9, 2005. \n\n\tNote 2: For the purposes of this AD, a general visual inspection is defined as: "A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to enhance visual access to all exposed surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked." \n\nCondition 1: Proper Clearance and No Damage \n\n\t(g) If proper clearance exists and no damage is detected during any inspection required by paragraph (f) of this AD, do the action(s) specified in paragraphs (g)(1), (g)(2), and (g)(3) of this AD, as applicable, per Boeing Alert Service Bulletin MD11-54A011, Revision 02, dated May 31, 2002; or Boeing Alert Service Bulletin MD11-54A011, Revision 3, dated November 9, 2005. \n\n\t(1) For Group 1 and Group 2 airplanes identified in the service bulletin: Repeat the inspection required by paragraph (f) of this AD every 6 months until the modification required by paragraph (g)(2) or (g)(3) of this AD, as applicable, has been done. \n\n\t(2) For Group 1 airplanes identified in the service bulletin: Within 18 months after February 24, 2004, install the brackets to support the IDG harness, and install new clamps on the power feeder cables of the IDG of the No. 1 and No. 3 pylons. \n\n\t(3) For Group 2 airplanes identified in the service bulletin: Within 18 months after February 24, 2004, replace the existing fairlead with a new clamp, and install new tape. \n\nCondition 2: Improper Clearance and No Damage \n\n\t(h) If improper clearance exists and no damage is detected during any inspection required by paragraph (f) of this AD, do the action(s) specified in paragraphs (h)(1), (h)(2), and (h)(3) of this AD,as applicable, per Boeing Alert Service Bulletin MD11-54A011, Revision 02, dated May 31, 2002; or Boeing Alert Service Bulletin MD11-54A011, Revision 3, dated November 9, 2005. \n\n\t(1) For Group 1 and Group 2 airplanes identified in the service bulletin: Before further flight, reposition cables, and repeat the inspection required by paragraph (f) of this AD every 6 months until the modification required by paragraph (h)(2) or (h)(3) of this AD, as applicable, has been done. \n\n\t(2) For Group 1 airplanes identified in the service bulletin: Within 18 months after February 24, 2004, install the brackets to support the IDG harness, and install new clamps on the power feeder cables of the IDG of engine pylons No. 1 and No. 3. \n\n\t(3) For Group 2 airplanes identified in the service bulletin: Within 18 months after February 24, 2004, replace the existing fairlead with a new clamp, and install new tape. \n\nCondition 3: Improper Clearance and Damage Detected \n\n\t(i) If improper clearance exists and any damage is detected during any inspection required by paragraph (f) of this AD, do the action(s) specified in paragraphs (i)(1), (i)(2), and (i)(3) of this AD, as applicable, per Boeing Alert Service Bulletin MD11-54A011, Revision 02, dated May 31, 2002; or Boeing Alert Service Bulletin MD11-54A011, Revision 3, dated November 9, 2005. \n\n\t(1) For Group 1 and Group 2 airplanes identified in the service bulletin: Before further flight, reposition cables; repair damage or replace damaged cables or fuel feed lines with new or serviceable cables or fuel feed lines; and repeat the inspection required by paragraph (f) of this AD every 6 months until the modification required by paragraph (i)(2) or (i)(3) of this AD, as applicable, has been done. \n\n\t(2) For Group 1 airplanes identified in the service bulletin: Within 18 months after February 24, 2004, install the brackets to support the IDG harness, and install new clamps on the power feeder cables of the IDG of engine pylons No. 1 and No. 3. \n\n\t(3) For Group 2 airplanes identified in the service bulletin: Within 18 months after February 24, 2004, replace the existing fairlead with a new clamp, and install new tape. \n\nNew Requirements of This AD \n\nGeneral Visual Inspection \n\n\t(j) For airplanes identified as Group 1, configurations 3 and 4, and Group 2, configuration 2, in Boeing Alert Service Bulletin (ASB) MD11-54A011, Revision 3, dated November 9, 2005: Within 30 days after the effective date of this AD, do a general visual inspection for proper clearance and damage of the power feeder cables of the IDG and the fuel feed lines of engine pylons No. 1 and No. 3 on the wings, in accordance with the Accomplishment Instructions of Boeing ASB MD11-54A011, Revision 3, dated November 9, 2005. \n\nCondition 1: Proper Clearance and No Damage \n\n\t(k) For airplanes identified as Group 1, configurations 3 and 4, and Group 2, configuration 2, in Boeing ASB MD11-54A011, Revision 3, dated November 9, 2005: If proper clearance exists and no damage is detected during any inspection required by paragraph (j) of this AD, do the actions specified in paragraphs (k)(1), (k)(2), and (k)(3) of this AD, as applicable, in accordance with the Accomplishment Instructions of Boeing ASB MD11-54A011, Revision 3, dated November 9, 2005. Accomplishment of the actions specified in paragraph (k)(2) or (k)(3) of this AD, as applicable, terminates the inspection requirements of paragraph (k)(1) of this AD. \n\n\t(1) For Group 1 airplanes, configurations 3 and 4, and Group 2, configuration 2: Repeat the inspection required by paragraph (j) of this AD thereafter at intervals not to exceed 6 months, until the actions specified in paragraph (k)(2) or (k)(3) of this AD, as applicable, are accomplished. \n\n\t(2) For Group 1 airplanes, configuration 3: Within 18 months after the effective date of this AD, install IDG harness support brackets and modify the IDG power feeder cable installations. \n\n\t(3) For Group 1 airplanes, configuration 4, and Group 2, configuration 2: Within 18 months after the effective date of this AD, modify the IDG power feeder cable installations. \n\nCondition 2: Improper Clearance and No Damage \n\n\t(l) For airplanes identified as Group 1, configurations 3 and 4, and Group 2, configuration 2, in Boeing ASB MD11-54A011, Revision 3, dated November 9, 2005: If improper clearance exists and no damage is detected during any inspection required by paragraph (j) of this AD, do the actions specified in paragraphs (l)(1), (l)(2), and (l)(3) of this AD, as applicable, in accordance with the Accomplishment Instructions of Boeing ASB MD11-54A011, Revision 3, dated November 9, 2005. Accomplishment of the actions specified in paragraph (l)(2) or (l)(3) of this AD, as applicable, terminates the repetitive inspections required in paragraph (l)(1) of this AD. \n\n\t(1) Before further flight, reposition the cables. Repeat the inspection required by paragraph (j) of this AD thereafter at intervals not to exceed 6 months, until the actions specified by paragraph (l)(2) or (l)(3) of this AD, as applicable, are accomplished. \n\n\t(2) For Group 1 airplanes, configuration 3: Within 18 months after the effective date of this AD, install IDG harness support brackets and modify the IDG power feeder cable installations. \n\n\t(3) For Group 1 airplanes, configuration 4, and Group 2 airplanes, configuration 2: Within 18 months after the effective date of this AD, modify the IDG power feeder cable installations. \n\nCondition 3: Improper Clearance and Damage Detected \n\n\t(m) For airplanes identified as Group 1, configurations 3 and 4, and Group 2, configuration 2, in Boeing ASB MD11-54A011, Revision 3, dated November 9, 2005: If improper clearance exists and there is any damage to the cables, structure, or fuel feed line, do the actions specified in paragraphs (m)(1), (m)(2), and (m)(3) of this AD, as applicable, in accordance with the Accomplishment Instructions of Boeing ASB MD11-54A011, Revision 3, dated November 9, 2005. Accomplishment of the actions specified in paragraph (m)(2) or (m)(3) of this AD, as applicable, terminates the repetitive inspection requirements of paragraph (m)(1) of this AD. \n\n\t(1) Before further flight, reposition cables and repair damage or replace damaged cables or fuel feed lines with new or serviceable cables or fuel feed lines. Repeat the inspection required by paragraph (j) of this AD thereafter at intervals not to exceed 6 months, until the actions specified by paragraph (m)(2) or (m)(3) of this AD, as applicable, are accomplished. \n\n\t(2) For Group 1 airplanes, configuration 3: Within 18 months after the effective date of this AD, install IDG harness support brackets, and modify the IDG power feeder cable installations. \n\n\t(3) For Group 1 airplanes, configuration 4, and Group 2 airplanes, configuration 2: Within 18 months after the effective date of this AD: Modify the IDG power feeder cable installations. \n\nAlternative Methodsof Compliance (AMOCs) \n\n\t(n)(1) The Manager, Los Angeles Aircraft Certification Office, Transport Airplane Directorate, FAA, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. \n\n\t(2) Before using any AMOC approved in accordance with Sec. 39.19 on any airplane to which the AMOC applies, notify the appropriate principal inspector in the FAA Flight Standards Certificate Holding District Office. \n\n\t(3) AMOCs approved previously in accordance with AD 2004-01-17, are not approved as AMOCs with this AD. \n\n\t(4) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD, if it is approved by an Authorized Representative for the Boeing Commercial Airplanes Delegation Option Authorization Organization who has been authorized by the Manager, Los Angeles ACO, to make those findings. For a repair method to be approved, and the approval must specifically refer to this AD. \n\nMaterial Incorporated by Reference \n\n\t(o) You must use Boeing Alert Service Bulletin MD11-54A011, Revision 02, dated May 31, 2002, or Boeing Alert Service Bulletin MD11-54A011, Revision 3, dated November 9, 2005, to perform the actions that are required by this AD, unless the AD specifies otherwise. \n\n\t(1) The Director of the Federal Register approved the incorporation by reference of Boeing Alert Service Bulletin MD11- 54A011, Revision 3, dated November 9, 2005, in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. \n\n\t(2) On February 24, 2004 (69 FR 2657, January 20, 2004), the Director of the Federal Register approved the incorporation by reference of Boeing Alert Service Bulletin MD11-54A011, Revision 02, dated May 31, 2002. \n\n\t(3) Contact Boeing Commercial Airplanes, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Data and Service Management, Dept. C1-L5A (D800-0024), for a copy of this service information. You may review copies at the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street, SW., Room PL-401, Nassif Building, Washington, DC; on the Internet at http://dms.dot.gov; or at the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.