2006-02-08R1 Turbomeca: Amendment 39-14721. Docket No. FAA-2005- 21242; Directorate Identifier 2005-NE-09-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective September 13, 2006.
Affected ADs
(b) This AD revises AD 2006-02-08, Amendment 39-14460.
Applicability
(c) This AD revision applies to Turbomeca Arriel 1B engines fitted with 2nd stage turbine modification TU 148, and Arriel 1D, 1D1, and 1S1 engines. Arriel 1B engines are installed on, but not limited to, Eurocopter France AS-350B and AS-350A "Ecureuil" helicopters. Arriel 1D engines are installed on, but not limited to, Eurocopter France AS-350B1 "Ecureuil" helicopters. Arriel 1D1 engines are installed on, but not limited to, Eurocopter France AS- 350B2 "Ecureuil" helicopters. Arriel 1S1 engines are installed on, but not limited to, Sikorsky Aircraft S-76A and S-76C helicopters.
Unsafe Condition
(d) This AD revision results from a request by Turbomeca to clarify the compliance times for 2nd stage turbine initial replacement on Arriel 1B, 1D, and 1D1 turboshaft engines. We are issuing this AD revision to clarify and relax the AD compliance times for 2nd stage turbine initial replacement on Arriel 1B, 1D, and 1D1 turboshaft engines. We are also issuing this AD revision to prevent in-flight engine shutdown and subsequent forced autorotation landing or accident.
Compliance
(e) You are responsible for having the actions required by this AD revision performed within the compliance times specified unless the actions have already been done.
Initial Relative Position Check of 2nd Stage Turbine Blades
(f) Do an initial relative position check of the 2nd stage turbine blades using the Turbomeca mandatory alert service bulletins (ASBs) specified in the following Table 1. Do the check before reaching any of the intervals specified in Table 1 or within 50 hours time-in-service after the effective date of this AD, whichever occurs later.
Table 1.--Initial and Repetitive Relative Position Check Intervals of 2nd Stage Turbine Blade
Turbomeca Engine Model
Initial Relative Position Check Interval
Repetitive Interval
Mandatory Alert Service Bulletin
Arriel 1B
(modified per TU 148)
Within 1,200 hours time-since-new (TSN) or time-since-overhaul (TSO) or 3,500 cycles-since-new (CSN) or cycles-since-overhaul (CSO), whichever occurs earlier.
Within 200 hours time-in-service-since-last-relative-position-check (TSLRPC).
A292 72 0807, dated March 24, 2004.
Arriel 1D1 and Arriel 1D
Within 1,200 hours TSN or TSO or 3,500 hours CSN or CSO, whichever occurs earlier.
Within 150 hours TSLRPC.
A292 72 0809, Update No. 1, dated October 4, 2005.
Arriel 1S1
Within 1,200 hours TSN or TSO or 3,500 hours CSN or CSO, whichever occurs earlier.
Within 150 hours TSLRPC.
A292 72 0810, dated March 24, 2004.
Repetitive Relative Position Check of 2nd Stage Turbine Blades
(g) Recheck the relative position of 2nd stage turbine blades at the TSLRPC intervals specified in Table 1 of this AD, using the mandatory ASBs indicated.
Credit for Previous Relative Position Checks
(h) Relative position checks of 2nd stage turbine blades done using Turbomeca Service Bulletin A292 72 0263, Update 1, 2, 3, or 4, may be used to show compliance with the initial requirements of paragraph (f) of this AD.
Initial Replacement of 2nd Stage Turbines on Arriel 1B, 1D, and 1D1 Engines
(i) Initially replace the 2nd stage turbine with a new or overhauled 2nd stage turbine as follows:
(1) On or before August 31, 2006, replace the 2nd stage turbine with a new or overhauled 2nd stage turbine:
(i) As soon as practicable after accumulating 1,500 hours TSN or TSO for Arriel 1D and 1D1 engines.
(ii) As soon as practicable after accumulating 2,200 hours TSN or TSO for Arriel 1B engines.
(2) After August 31, 2006, replace the 2nd stage turbine with a new or overhauled 2nd stage turbine:
(i) Before accumulating 1,500 hours TSN or TSO for Arriel 1D and 1D1 engines.
(ii) Before accumulating 2,200 hours TSN or TSO for Arriel 1B engines.
Repetitive Replacements of 2nd Stage Turbines on Arriel 1B, 1D, and 1D1 Engines
(j) Thereafter, replace the 2nd stage turbine with a new or overhauled 2nd stage turbine within every 1,500 hours TSN or TSO for Arriel 1D and 1D1 engines, and within every 2,200 hours TSN or TSO for Arriel 1B engines.
Criteria for Overhauled 2nd Stage Turbines
(k) Do the following to overhauled 2nd stage turbines, referenced in paragraphs (i) and (j) of this AD:
(1) You must install new blades in the 2nd stage turbines of overhauled Arriel 1D and 1D1 engines.
(2) You may install either overhauled or new blades in the 2nd stage turbines of overhauled Arriel 1B engines.
Relative Position Check Continuing Compliance Requirements
(l) All 2nd stage turbines, including those that are new or overhauled, must continue to comply with relative position check requirements of paragraphs (f) and (j) of this AD.
Alternative Methods of Compliance
(m) The Manager, Engine Certification Office, has the authority to approve alternative methods of compliance for this AD if requested using the procedures found in 14 CFR 39.19.
Related Information
(n) DGAC airworthiness directive F-2004-047 R1, dated October 26, 2005, also addresses the subject of this AD.
Material Incorporated by Reference
(o) You must use the service information specified in Table 2 of this AD to perform the actions required by this AD. The Director of the Federal Register previously approved the incorporation by reference of the documents listed in Table 2 of this AD in accordance with 5 U.S.C. 552(a) and 1 CFR part 51, as of February 28, 2006 (71 FR 3754, January 24, 2006). Contact Turbomeca, 40220 Tarnos, France; telephone +33 05 59 74 40 00, fax +33 05 59 74 45 15, for a copy of this service information. You may review copies at the DocketManagement Facility; U.S. Department of Transportation, 400 Seventh Street, SW., Nassif Building, Room PL-401, Washington, DC 20590-0001, on the Internet at http://dms.dot.gov, or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html .
Table 2.--Incorporation by Reference
Turbomeca Mandatory Alert Service Bulletin No.
Page
Update No.
Date
A292 72 0807
Total Pages: 17
ALL
Original
March 24, 2004
A292 72 0809
Total Pages: 18
ALL
1
October 4, 2005
A292 72 0810
Total Pages: 14
ALL
Original
March 24, 2004