AD 2006-05-08

Active

Sump drain valve assembly

Key Information
2006-05-08
Active
April 13, 2006
February 27, 2006
FAA-2005-23357
39-14505
Applicability
["Aircraft"]
["Large Airplane"]
The Boeing Company
777-200 Series
Summary

The FAA is adopting a new airworthiness directive (AD) for certain Boeing Model 777-200 series airplanes. This AD requires installing a new washer between the lower wing surface and the jam nut of the sump drain valve assembly. This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent energy from a lightning strike on the bushing for the sump drain valve from arcing to the inside of the center fuel tank wall, which could create an ignition source in the fuel tank and result in a fuel tank explosion.

Action Required

Final rule.

Regulatory Text

2006-05-08 Boeing: Amendment 39-14505. Docket No. FAA-2005-23357; Directorate Identifier 2005-NM-207-AD. \n\nEffective Date \n\n\t(a) This AD becomes effective April 13, 2006. \n\nAffected ADs \n\n\t(b) None. \n\nApplicability \n\n\t(c) This AD applies to Boeing Model 777-200 series airplanes, certificated in any category; as identified in Boeing Special Attention Service Bulletin 777-28-0045, dated September 1, 2005. \n\nUnsafe Condition \n\n\t(d) This AD results from fuel system reviews conducted by the manufacturer. We are issuing this AD to prevent energy from a lightning strike on the bushing for the sump drain valve from arcing to the inside of the center fuel tank wall, which could create an ignition source in the fuel tank and result in a fuel tank explosion. \n\nCompliance \n\n\t(e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. \n\nInstallation \n\n\t(f) Within 60 months after the effective date of this AD, install a new washer between the lower wing surface and the jam nut of the sump drain valve assembly in both wings, in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 777-28-0045, dated September 1, 2005. \n\nAlternative Methods of Compliance (AMOCs) \n\n\t(g)(1) The Manager, Seattle Aircraft Certification Office, FAA, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. \n\n\t(2) Before using any AMOC approved in accordance with Sec. 39.19 on any airplane to which the AMOC applies, notify the appropriate principal inspector in the FAA Flight Standards Certificate Holding District Office. \n\nMaterial Incorporated by Reference \n\n\t(h) You must use Boeing Special Attention Service Bulletin 777- 28-0045, dated September 1, 2005, to perform the actions that are required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approved the incorporation by reference of this document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207, for a copy of this service information. You may review copies at the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street SW., room PL-401, Nassif Building, Washington, DC; on the Internet at http://dms.dot.gov; or at the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html .

Supplementary Information

Examining the Docket \n\n\tYou may examine the airworthiness directive (AD) docket on the Internet at http://dms.dot.gov or in person at the Docket Management Facility office between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. The Docket Management Facility office (telephone (800) 647-5227) is located on the plaza level of the Nassif Building at the street address stated in the ADDRESSES section. \n\nDiscussion \n\n\tThe FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to include an AD that would apply to certain Boeing Model 777-200 series airplanes. That NPRM was published in the Federal Register on December 20, 2005 (70 FR 75428). That NPRM proposed to require installing a new washer between the lower wing \nsurface and the jam nut of the sump drain valve assembly. \n\nComments \n\n\tWe provided the public the opportunity to participate in the development of this AD. We have considered the comment received.The commenter, Boeing, supports the NPRM. \n\nConclusion \n\n\tWe have carefully reviewed the available data, including the comment received, and determined that air safety and the public interest require adopting the AD as proposed. \n\nCosts of Compliance \n\n\tThere are about 88 airplanes of the affected design in the worldwide fleet. This AD affects about 22 airplanes of U.S. registry. The required actions will take about 4 work hours per airplane, at an average labor rate of $65 per work hour. Required parts will cost about $360 per airplane. Based on these figures, the estimated cost of the AD for U.S. operators is $13,640, or $620 per airplane. \n\nAuthority for This Rulemaking \n\n\tTitle 49 of the United States Code specifies the FAA's authority to issue rules on aviation safety. Subtitle I, section 106, describes the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the Agency's authority. \n\n\tWe are issuing this rulemaking under the authority described in subtitle VII, part A, subpart III, section 44701, "General requirements." Under that section, Congress charges the FAA with promoting safe flight of civil aircraft in air commerce by prescribing regulations for practices, methods, and procedures the Administrator finds necessary for safety in air commerce. This regulation is within the scope of that authority because it addresses an unsafe condition that is likely to exist or develop on products identified in this rulemaking action. \n\nRegulatory Findings \n\n\tWe have determined that this AD will not have federalism implications under Executive Order 13132. This AD will not have a substantial direct effect on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government. \n\n\tFor the reasons discussed above, I certify that this AD: \n\n\t(1) Is not a "significant regulatory action" under Executive Order 12866; \n\n\t(2) Is not a "significant rule" under DOT Regulatory Policies and Procedures (44 FR 11034, February 26, 1979); and \n\n\t(3) Will not have a significant economic impact, positive or negative, on a substantial number of small entities under the criteria of the Regulatory Flexibility Act. \n\n\tWe prepared a regulatory evaluation of the estimated costs to comply with this AD and placed it in the AD docket. See the ADDRESSES section for a location to examine the regulatory evaluation. \n\nList of Subjects in 14 CFR Part 39 \n\n\tAir transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. \n\nAdoption of the Amendment \n\nAccordingly, under the authority delegated to me by the Administrator, the FAA amends 14 CFR part 39 as follows: \n\nPART 39--AIRWORTHINESS DIRECTIVES \n\n1. The authority citation for part 39 continues to read as follows: \n\n\tAuthority: 49 U.S.C. 106(g), 40113, 44701. \n\nSec. 39.13 (Amended) \n\n2. The Federal Aviation Administration (FAA) amends Sec. 39.13 by adding the following new airworthiness directive (AD):

AD Assistant

Get AI-powered answers about this AD, check applicability, and find compliance steps.

Sign Up to Unlock
Contact Information

Margaret Langsted, Aerospace Engineer, Propulsion Branch, ANM-140S, Seattle Aircraft Certification Office, FAA, 1601 Lind Avenue, SW., Renton, Washington 98055-4056; telephone (425) 917-6500; fax (425) 917-6590.

References
(Federal Register: March 9, 2006 (Volume 71, Number 46))
--- - Part 39
(Page 12124-12125)
FAA Documents