2005-14-10 McDonnell Douglas: Amendment 39-14187. Docket No. FAA- 2004-18670; Directorate Identifier 2002-NM-83-AD. \n\nEffective Date \n\n\t(a) This AD becomes effective August 18, 2005. \n\nAffected ADs \n\n\t(b) This AD supersedes AD 95-23-09, amendment 39-9429. \n\nApplicability \n\n\t(c) This AD applies to all McDonnell Douglas Model DC-10-10 and DC-10-10F airplanes; Model DC-10-15 airplanes; Model DC-10-30 and DC-10-30F (KC-10A and KDC-10) airplanes; and Model DC-10-40 and DC- 10-40F airplanes; certificated in any category. \n\nUnsafe Condition \n\n\t(d) This AD was prompted by a significant number of these airplanes approaching or exceeding the design service goal on which the initial type certification approval was predicated. We are issuing this AD to detect and correct fatigue cracking that could compromise the structural integrity of these airplanes. \n\nCompliance \n\n\t(e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. \n\nRestatement of Certain Requirements of AD 95-23-09 \n\n\t(f) Within 6 months after November 24, 1993 (the effective date of AD 93-17-09, amendment 39-8680), incorporate a revision into the FAA-approved maintenance inspection program which provides for inspection(s) of the Principal Structural Elements (PSEs) defined in Section 2 of Volume I of McDonnell Douglas Report No. L26-012, "DC- 10 Supplemental Inspection Document (SID)," Revision 3, dated December 1992, in accordance with Section 2 of Volume III-92, dated October 1992, of the SID. The non-destructive inspection (NDI) techniques set forth in Section 2 and Section 4 of Volume II, Revision 3, dated December 1992, of the SID provide acceptable methods for accomplishing the inspections required by this paragraph. All inspection results (negative or positive) must be reported to McDonnell Douglas, in accordance with the instructions contained in Section 2 of Volume III-92, dated October 1992, of the SID. Information collection requirements contained in this regulation have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\n\t(1) For those Fleet Leader Operator Sampling (FLOS) PSEs that do not have a Normal Maintenance Visual Inspection specified in Section 4 of Volume II, Revision 3, dated December 1992, of the SID, the procedure for general visual inspection is as follows: Perform an inspection of the general PSE area for cleanliness, presence of foreign objects, security of parts, cracks, corrosion, and damage. \n\n\t(2) For PSEs 53.10.031E/.032E, 53.10.047E/.048E, and 57.10.029E/.030E: The ENDDATE for these PSEs is October 1993. (For these PSEs, disregard the June 1993 ENDDATE specified in Section 2 of Volume III-92, dated October 1992, of the SID.) \n\n\t(g) Within 6 months after January 2, 1996 (the effective date of AD 95-23-09, amendment 39-9429), replace the revision of the FAA- approved maintenance inspection program required by paragraph (f) of this AD with a revision that provides for inspection(s) of the PSEs defined in Section 2 of Volume I of McDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," Revision 5, dated October 1994, in accordance with Section 2 of Volume III- 94, dated November 1994, of the SID. The NDI techniques set forth in Section 2 of Volume II, Revision 5, dated October 1994, of the SID provide acceptable methods for accomplishing the inspections required by this paragraph. \n\n\t(1) Prior to reaching the threshold (Nth), but no earlier than one-half of the threshold (Nth/2), specified for all PSEs listed in Volume III-94, dated November 1994, of the SID, inspect each PSE sample in accordance with the NDI procedures set forth in Section 2 of Volume II, Revision 5, dated October 1994. Thereafter, repeat the inspection for that PSE at intervals not to exceed DNDI/2 of the NDI procedure that is specified in Volume III- 94, dated November 1994, of the SID. \n\n\t(2) This AD does not require visual inspections of FLOS PSEs on airplanes listed in Volume III-94, dated November 1994, of the SID planning data at least once during the specified inspection interval, in accordance with Section 2 of Volume III-94, dated November 1994, of the SID. \n\n\t(3) For PSEs 53.10.055/.056E, 55.10.013/.014B, 53.10.005/.006E, 53.10.031/.032E, 53.10.047/.048E, 57.10.029/.030E: The EDATE for these PSEs is June 1998. (For these PSEs, disregard the June 1996 EDATE specified in Section 2, of Volume III-94, dated November 1994, of the SID.) \n\n\t(4) All inspection results (negative or positive) must be reported to McDonnell Douglas in accordance with the instructions contained in Section 2 of Volume III-94, dated November 1994, of the SID. Information collection requirements contained in this regulation have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\n\t(h) Any cracked structure detected during the inspections required by paragraph (f) or (g) of this AD must be repaired before further flight, in accordance with a method approved by the Manager, Los Angeles Aircraft Certification Office (ACO), FAA. \n\n\tNote 1: Requests for approval of any PSE repair that would affect the FAA-approved maintenance inspection program required by this AD should include a damage tolerance assessment for that PSE repair. \n\nNew Requirements of This AD \n\nRevision of the Maintenance Inspection Program \n\n\t(i) Within 12 months after the effective date of this AD, incorporate a revision into the FAA-approved maintenance inspection program that provides for inspection(s) of the PSEs, in accordance with Boeing Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," Volume I, Revision 6, dated February 2002." Unless otherwise specified, all further references in this AD to the "SID" are to Revision 6, dated February 2002. \n\nNon-Destructive Inspections (NDIs) \n\n\t(j) For all PSEs listed in Section 2 of Volume I of the SID, perform an NDI for fatigue cracking of each PSE in accordance with the NDI procedures specified in Section 2 of Volume II, Revision 8, dated November 2003, of the SID, at the times specified in paragraph (j)(1), (j)(2), or (j)(3) of this AD, as applicable. \n\n\t(1) For airplanes that have less than three quarters of the fatigue life threshold (¾Nth) as of the effective date of the AD: Perform the NDI for fatigue cracking at the times specified in paragraphs (j)(1)(i) and (j)(1)(ii) of this AD. After reaching the threshold (Nth), repeat the inspection for that PSE at intervals not to exceed NDI/2. \n\n\t(i) Perform an initial NDI no earlier than one-half of the threshold (½Nth), but before reaching three-quarters of the threshold (¾Nth), or within 60months after the effective date of this AD, whichever occurs later. \n\n\t(ii) Repeat the NDI no earlier than (¾Nth), but before reaching the threshold (Nth), or within 18 months after the inspection required by paragraph (j)(1)(i) of this AD, whichever occurs later. \n\n\tNote 2: The SID and this AD refer to the repetitive inspection interval as NDI/2. However, the headings of the tables in Section 4 of Volume I of the SID refer to the repetitive inspection interval of NDI/2. The values listed under NDI/2 in the tables in Section 4 of Volume I of the SID are the repetitive inspection intervals, NDI/2. \n\n\t(2) For airplanes that have reached or exceeded three-quarters of the fatigue life threshold (¾Nth), but less than the threshold (Nth), as of the effective date of the AD: Perform an NDI prior to reaching the threshold (Nth), or within 18 months after the effective date of this AD, whichever occurs later. Thereafter, after passing the threshold (Nth), repeat the inspection for thatPSE at intervals not to exceed NDI/2. \n\n\t(3) For airplanes that have reached or exceeded the fatigue life threshold (Nth) as of the effective date of the AD: Perform an NDI within 18 months after the effective date of this AD. Thereafter, repeat the inspection for that PSE at intervals not to exceed NDI/2. \n\nDiscrepant Findings \n\n\t(k) If any discrepancy (e.g., differences on the airplane from the NDI reference standard, such as PSEs that cannot be inspected as specified in Volume II of the SID or do not match rework, repair, or modification descriptions in Volume I of the SID) is detected during any inspection required by paragraph (j) of this AD, accomplish the action specified in paragraph (k)(1) or (k)(2) of this AD, as applicable. \n\n\t(1) If a discrepancy is detected during any inspection performed prior to ¾Nth or Nth: The area of the PSE affected by the discrepancy must be inspected prior to Nth or within 18 months after the discovery of the discrepancy, whichever occurs later, in accordance with a method approved by the Manager, Los Angeles ACO. \n\n\t(2) If a discrepancy is detected during any inspection performed after Nth: The area of the PSE affected by the discrepancy must be inspected prior to the accumulation of an additional NDI/2 or within 18 months after the discovery of the discrepancy, whichever occurs later, in accordance with a method approved by the Manager, Los Angeles ACO. \n\nReporting Requirements \n\n\t(l) All negative, positive, or discrepant findings (examples of discrepant findings are described in paragraph (k) of this AD) of the inspections accomplished under paragraphs (j) or (o) of this AD must be reported to Boeing, at the times specified in, and in accordance with the instructions contained in, Section 4 of Volume I of the SID. Information collection requirements contained in this regulation have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\nCorrective Actions \n\n\t(m) Any cracked structure of a PSE detected during any inspection required by paragraph (j) of this AD must be repaired before further flight in accordance with a method approved by the Manager, Los Angles ACO or in accordance with data meeting the certification basis of the airplane approved by an Authorized Representative for the Boeing Delegation Option Authorization Organization who has been authorized by the Manager, Los Angeles Aircraft Certification Office (ACO), to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. Accomplish the follow-on actions described in paragraphs (m)(1), (m)(2), and (m)(3) of this AD, at the times specified. \n\n\t(1) Within 18 months after repair, perform a damage tolerance assessment (DTA) that defines the threshold for inspection of therepair and submit the assessment for approval. \n\n\t(2) Before reaching 75% of the repair threshold as determined in paragraph (m)(1) of this AD, submit the inspection methods and repetitive inspection intervals for the repair for approval. \n\n\t(3) Before the repair threshold, as determined in paragraph (m)(1) of this AD, incorporate the inspection method and repetitive inspection intervals into the FAA-approved structural maintenance or inspection program for the airplane. \n\n\tNote 3: For the purposes of this AD, we anticipate that submissions of the DTA of the repair, if acceptable, should be approved within six months after submission. \n\n\tNote 4: Advisory Circular (AC) 25.1529-1, "Instructions for Continued Airworthiness of Structural Repairs on Transport Airplanes," dated August 1, 1991, is considered to be additional guidance concerning the approval of repairs to PSEs. \n\nInspection for Transferred Airplanes \n\n\t(n) Before any airplane that has exceeded the fatigue life threshold (Nth) can be added to an air carrier's operations specifications, a program for the accomplishment of the inspections required by this AD must be established as specified in paragraph (n)(1) or (n)(2) of this AD, as applicable. \n\n\t(1) For airplanes that have been inspected in accordance with this AD, the inspection of each PSE must be accomplished by the new operator in accordance with the previous operator's schedule and inspection method, or the new operator's schedule and inspection method, at whichever time would result in the earlier accomplishment date for that PSE inspection. The compliance time for accomplishment of this inspection must be measured from the last inspection accomplished by the previous operator. After each inspection has been performed once, each subsequent inspection must be performed in accordance with the new operator's schedule and inspection method. \n\n\t(2) For airplanes that have not been inspected in accordance with this AD, the inspection of each PSE required by this AD must be accomplished either prior to adding the airplane to the air carrier's operations specification, or in accordance with a schedule and an inspection method approved by the Manager, Los Angeles ACO. After each inspection has been performed once, each subsequent inspection must be performed in accordance with the new operator's schedule. \n\nInspections Accomplished Before the Effective Date of This AD \n\n\t(o) Inspections accomplished before the effective date of this AD in accordance with McDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," Volume I, Revision 4, dated June \n1993, or Revision 5, dated October 1994; Volume II, Revision 6, dated October 1997, or Boeing Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," Revision 7, dated August 2002; and McDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," Volume III-94, dated November 1994; are acceptable for compliance with the requirements of paragraph (j) of this AD. \n\nAcceptable for Compliance \n\n\t(p) McDonnell Douglas Report No. MDC 91K0264, "DC-10/KC-10 Aging Aircraft Repair Assessment Program Document," Revision 1, dated October 2000, provides inspection/replacement programs for certain repairs to the fuselage pressure shell. These repairs and inspection/replacement programs are considered acceptable for compliance with the requirements of paragraphs (h) and (m) of this AD for repairs subject to that document. \n\nAlternative Methods of Compliance (AMOCs) \n\n\t(q) The Manager, Los Angles ACO, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. \n\n\t(r)(1) Inspection procedures accomplished and approved previously as AMOCs prior to the effective date of this AD as alternative inspection procedures in accordance with AD 95-23-09, amendment 39-9429; AD 93-17-09, amendment 39-8680; AD 92-02-08, amendment 39-8144; or AD 89-22-10, amendment 39-6330; are approved as AMOCs with the actions required by paragraph (j) of this AD. \n\n\t(2) Repairs accomplished and approved previously as AMOCs in accordance with AD 95-23-09, amendment 39-9429; AD 93-17-09, amendment 39-8680; AD 92-02-08, amendment 39-8144; or AD 89-22-10, amendment 39-6330; are approved as AMOCs with the actions required by paragraph (h) or (m) of this AD. \n\nMaterial Incorporated by Reference \n\n\t(s) You must use the service information that is specified in Table 1 of this AD to perform the actions that are required by this AD, unless the AD specifies otherwise. \n\n\tTable 1.--Material Incorporated by Reference \n\n\n\nService information \nVolume \nRevision \nDate \n\n\n\n\nBoeing Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," including Appendices A and B. \nVolume I ....................... \nRevision 6 .................... \nFebruary 2002. \n\n\n\n\nMcDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)". \nVolume II ...................... \nRevision 8 .................... \nNovember 2003. \n\n\n\n\nMcDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)". \nVolume II ...................... \nRevision 5 .................... \nOctober 1994. \n\n\n\n\nMcDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)". \nVolume III-92 ............... \nOriginal ......................... \nOctober 1992. \n\n\n\n\nMcDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)". \nVolume III-94 ............... \nOriginal ......................... \nNovember 1994. \n\n\n\t(1) The incorporation by reference of Boeing Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," Volume I, including Appendices A and B, Revision 6, dated February 2002; and McDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)" Volume II, Revision 8, dated November 2003; is approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. (Only the title, Record of Revision, and List of Effective pages identify Boeing Report No. L26-012, Volume I, as Revision 6. Only page 3.1 of Section 3 and pages B-1 through B-4 of Appendix B of Volume I, Revision 6, contain the Boeing Report No., L26-012. Only the title, Record of Revision, and Table of Contents pages identify McDonnell Douglas Report No. L26-012, Volume II, as Revision 8. Only the title page of Volume II, Revision 8, contains the McDonnell Douglas Report No., L26-012.) \n\n\t(2) The incorporation by reference of McDonnell Douglas Report No. L26-012, "DC-10 Supplemental Inspection Document (SID)," Volume II, Revision 5, dated October 1994; and McDonnell Douglas Report No. L26-012, Volume III-94, dated November 1994; was approved previously by the Director of the Federal Register as of January 2, 1996 (60 FR 61649, December 1, 1995). \n\n\t(3) The incorporation by reference of McDonnell Douglas Report No.L26-012, "DC-10 Supplemental Inspection Document (SID)," Volume III-92, dated October 1992, was approved previously by the Director of the Federal Register as of November 24, 1993 (58 FR 54949, October 25, 1993). \n\n\t(4) To get copies of the service information, contact Boeing Commercial Airplanes, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Data and Service Management, Dept. C1-L5A (D800-0024). To view the AD docket, go to the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street SW., room PL-401, Nassif Building, Washington, DC. To review copies of this service information, go to the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html .