2005-13-30 Boeing: Amendment 39-14167. Docket 2002-NM-289-AD. \n\n\tApplicability: All Model 737-100, -200, and -200C series airplanes; certificated in any category. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo detect and correct fatigue cracking of the skin panels, which could cause rapid decompression of the airplane, accomplish the following: \n\nRepetitive Inspections: Unmodified Skin Areas \n\n\t(a) For fuselage skin panel areas that have not been modified with stiffening angles: Before the airplane accumulates 16,000 total flight cycles, or within 4,500 flight cycles after the effective date of this AD, whichever occurs later, inspect the unmodified fuselage side skins just aft of the main wheelwell, and perform all follow-on actions, in accordance with Part I of the Accomplishment Instructions of Boeing Service Bulletin 737-53-1065, Revision 2, dated April 19, 2001; except as provided by paragraph (g) of this AD. If no cracking, loose fasteners, disbonding, or damage is found: Repeat the inspection at the time specified in paragraph 1.E., Compliance, of the service bulletin, as applicable, except as provided by paragraph (d) of this AD. \n\nRepetitive Inspections: Modified Skin Areas \n\n\t(b) For fuselage skin panel areas that have been modified with stiffening angles in accordance with Boeing Service Bulletin 737-53- 1065, dated January 4, 1985; Revision 1, dated October 12, 1989; or Revision 2, dated April 19, 2001: Before the airplane accumulates 16,000 total flight cycles, or within 4,500 flight cycles after the effective date of this AD, whichever occurs later, inspect the modified areas as specified in accordance with Part I of Boeing Service Bulletin 737-53-1065, Revision 2, dated April 19, 2001. Repeat the inspection at the time specified in paragraph 1.E., of the service bulletin, as applicable, except as provided by paragraph (d) of this AD. If any cracks, loose fasteners, disbonding, or damage is found: Repair before further flight in accordance with the requirements of paragraph (d) of this AD. \n\nTerminating Action for Inspections of Modified Skin Areas \n\n\t(c) For fuselage skin panel areas that have been modified with stiffening angles in accordance with Boeing Service Bulletin 737-53- 1065, dated January 4, 1985; Revision 1, dated October 12, 1989; or Revision 2, dated April 19, 2001: At the later of the times specified by paragraphs (c)(1) and (c)(2) of this AD, perform a subsurface eddy current or magneto optical imaging inspection to detect subsurface skin cracks along the edge of the bonded doubler, in accordance with Figure 10 of Boeing Service Bulletin 737-53-1065, Revision 2, dated April 19, 2001; except as provided by paragraph (g) of this AD. If any cracks are found, repair before further flight in accordance with paragraph (d) of this AD. Accomplishment of this inspection and all applicable corrective actions terminates the repetitive inspections required by paragraph (b) of this AD for the modified areas. \n\n\t(1) Inspect within 24,500, but not fewer than 20,000, flight cycles after the modification of the skin. \n\n\t(2) Inspect within 4,500 flight cycles after the effective date of this AD. \n\nRepair: Modified and Unmodified Skin Areas \n\n\t(d) If any cracking is detected during any inspection required by this AD: Do the actions specified by paragraph (d)(1) or (d)(2) of this AD before further flight. Do the actions in accordance with Boeing Service Bulletin 737-53-1065, Revision 2, dated April 19, 2001, except as required by paragraph (e) of this AD. \n\n\t(1) Do a time-limited repair (including a detailed inspection of the skin in the area of the repair to detect corrosion and doubler disbonding) in accordance with Part III of the Accomplishment Instructions of the service bulletin. \n\n\t(i) After the time-limited repair has been accomplished: At intervals not to exceed 3,000 flight cycles, perform an external general visual inspection of the repair to detect loose or missing fasteners, in accordance with Part III of the Accomplishment Instructions of the service bulletin, until the actions specified in paragraph (d)(1)(v) of this AD have been accomplished. \n\n\t(ii) Within 4,500 flight cycles after the time-limited repair has been accomplished: Perform an internal inspection of the repair to detect cracking or doubler disbonding using general visual and high-frequency eddy current methods, in accordance with Figure 11 of the service bulletin, unless the actions specified in paragraph (d)(1)(v) of this AD have been accomplished. \n\n\t(iii) If any cracking is found during any inspection required by paragraph (d)(1) of this AD: Repair before further flight in accordance with paragraph (e) of this AD. Another approved repair method is in Section 53-30-3, Figure 48, of the Boeing 737 Structural Repair Manual (SRM). \n\n\t(iv) If any disbonding is found during any inspection required by paragraph (d)(1) of this AD: Repair before further flight in accordance with Part II of the service bulletin. \n\n\t(v) Within 10,000 flight cycles after accomplishment of the time-limited repair: Make the repair permanent in accordance with Part III of the Accomplishment Instructions of the service bulletin. Permanent repair of an area terminates the repetitive inspections specified in this AD for that repaired area only. \n\n\t(2) Do a permanent repair (including an inspection using external subsurface eddy current or magneto optical imaging methods to detect cracks at the chem-milled step in each adjacent bay of the fuselage skin, a detailed inspection of the skin in the area of the repair for corrosion and doubler disbonding, and applicable corrective action) of the cracked area, in accordance with Part II of the Accomplishment Instructions of the service bulletin. Another approved repair method is in Section 53-30-3, Figure 48, of the Boeing 737 SRM. Permanent repair of an area terminates the repetitive inspections specified in this ADfor that repaired area only. \n\nExceptions to Service Bulletin Procedures \n\n\t(e) During any inspection required by this AD, if any discrepancy (including cracking) is detected for which the service bulletin specifies to contact Boeing for appropriation action: Before further flight, repair according to a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA; or according to data meeting the certification basis of the airplane approved by an Authorized Representative for the Boeing Delegation Option Authorization Organization who has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. \n\n\t(f) Although Boeing Service Bulletin 737-53-1065, Revision 2, dated April 19, 2001, recommends that cracks found in Zone 2 be reported to Boeing, this AD does not require such a report. \n\n\t(g) For airplanes subject to the requirements of paragraphs (a) and (c) of this AD: Inspections are not required in areas that are spanned by an FAA-approved repair that has a minimum of 3 rows of fasteners above and below the chemical-milled step. If an external doubler covers the chemical-milled step, but does not span it by a minimum of 3 rows of fasteners above and below, one method of compliance with the inspection requirement of paragraphs (a) and (c) of this AD is to inspect all chemical-milled steps covered by the repair using internal nondestructive test (NDT) methods in accordance with Part 6, Subject 53-30-20, of the Boeing 737 NDT Manual. Follow-on and corrective actions must be done as specified in this AD. \n\nAlternative Methods of Compliance (AMOCs) \n\n\t(h)(1) In accordance with 14 CFR 39.19, the Manager, Seattle ACO, FAA, is authorized to approve AMOCs for this AD. \n\t(2) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD, if it is approved by an Authorized Representative for the Boeing Delegation Option Authorization Organization who has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane, and the approval must specifically refer to this AD. \n\nIncorporation by Reference \n\n\t(i) Unless otherwise specified in this AD, the actions must be done in accordance with Boeing Service Bulletin 737-53-1065, Revision 2, dated April 19, 2001. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. To get copies of this service information, contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207. To inspect copies of this service information, go to the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or to the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/ federal_register/code_of_federal_regulations/ ibr_locations.html. \n\nEffective Date \n\n\t(j) This amendment becomes effective on August 1, 2005.