2005-09-03 Raytheon Aircraft Company: Amendment 39-14071. Docket No. FAA-2005-20251; Directorate Identifier 2004-NM-164-AD.
Effective Date
(a) This AD becomes effective June 1, 2005.
Affected ADs
(b) None.
Applicability
(c) This AD applies to Raytheon Model Hawker 800XP airplanes, certificated in any category, serial numbers 258541, 258556, and 258567 through 258608 inclusive.
Unsafe Condition
(d) This AD was prompted by reports of miswiring in the power distribution system. We are issuing this AD to ensure that the flightcrew is aware of the source of battery power for certain equipment, and to prevent damage to wiring and surrounding equipment that could result in smoke or fire on the airplane.
Compliance
(e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Service Information Reference
(f) The term "service bulletin," as used in this AD, means Raytheon Service Bulletin SB 24-3555, Revision 1, dated June 2004.
(1) Where the service bulletin specifies contacting the manufacturer for information, this proposed AD requires, before further flight, contacting the Manager, Wichita Aircraft Certification Office (ACO), FAA. Then, before further flight, any applicable action specified by the Manager, Wichita ACO, must be accomplished in accordance with a method approved by the Manager, Wichita ACO.
(2) The service bulletin also refers to Raytheon Hawker 800XP Temporary Change P/N 140-590032-0005TC7, dated June 3, 2003, which is intended to be inserted into the Emergency Procedures section of the airplane flight manual to inform the flightcrew which standby batteries provide power to what equipment once the actions in the service bulletin have been done.
(3) Where the service bulletin specifies to report compliance information to the manufacturer, this AD does not include that requirement.
Inspection
(g) Within 50 flight hours or 30 days after the effective date of this AD, whichever is first: Perform a detailed inspection for damage (primarily but not limited to evidence of heat damage) of wiring in the flight compartment, and all applicable corrective actions, by doing all actions in Part 1 of the Accomplishment Instructions of the service bulletin, except as provided by paragraphs (f)(1) and (f)(3) of this AD. Any applicable corrective action must be done before further flight.
Note 1: For the purposes of this AD, a detailed inspection is: "An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required."
Modification
(h) At the applicable time specified inparagraph (h)(1) or (h)(2) of this AD, modify wiring in the flight compartment by doing all actions in accordance with Part 2 of the Accomplishment Instructions of the service bulletin. Following accomplishment of the actions in Part 2 of the service bulletin, before further flight, do all actions associated with the functional test, including revising the Emergency Procedures section of the Raytheon Hawker 800XP Airplane Flight Manual to include the information in Temporary Change P/N 140-590032-0005TC7, in accordance with the Accomplishment Instructions of the service bulletin.
(1) If no damage was found during the inspection required by paragraph (g) of this AD: Do paragraph (h) within 300 flight hours or 180 days after the effective date of this AD, whichever is first.
(2) If any damage is found during the inspection required by paragraph (g) of this AD: Do paragraph (h) before further flight after the damage is found.
Alternative Methods of Compliance (AMOCs)
(i) The Manager, Wichita ACO, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19.
Material Incorporated by Reference
(j) You must use Raytheon Service Bulletin SB 24-3555, Revision 1, dated June 2004, to perform the actions that are required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approves the incorporation by reference of this document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. For copies of the service information, contact Raytheon Aircraft Company, Department 62, P.O. Box 85, Wichita, Kansas 67201-0085. To view the AD docket, contact the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street SW., room PL-401, Nassif Building, Washington, DC. To review copies of the service information, contact the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/ code_of_federal_regulations/ ibr_locations.html.