2005-06-08 Airbus: Amendment 39-14016. Docket No. FAA-2005-20025; Directorate Identifier 2004-NM-208-AD.
Effective Date
(a) This AD becomes effective April 25, 2005.
Affected ADs
(b) None.
Applicability
(c) This AD applies to all Airbus Model A330, A340-200, and A340-300 series airplanes; certificated in any category.
Unsafe Condition
(d) This AD was prompted by reports of cracking of a certain bracket that attaches the flight deck instrument panel to the airplane structure. We are issuing this AD to detect and correct a cracked bracket. Failure of this bracket, combined with failure of the horizontal beam, could result in collapse of the left part of the flight deck instrument panel, and consequent reduced controllability of the airplane.
Compliance
(e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done.
Service Bulletin Reference(f) The term "service bulletin," as used in this AD, means the Accomplishment Instructions of Airbus Service Bulletins A330-25-3227 (for Model A330 series airplanes); and A340-25-4230 (for Model A340- 200 and -300 series airplanes); both including Appendix 01; and both dated June 17, 2004; as applicable.
Initial Inspection
(g) At the applicable time specified in paragraph (g)(1) or (g)(2) of this AD, perform a detailed inspection of the bracket having part number (P/N) F2511012920000, which attaches the flight deck instrument panel to airplane structure, in accordance with the service bulletin.
(1) For Model A330 series airplanes: Prior to the accumulation of 16,500 total flight cycles, or within 60 days after the effective date of this AD, whichever is later.
(2) For Model A340-200 and -300 series airplanes: Prior to the accumulation of 9,700 total flight cycles, or within 2,700 flight cycles after the effective date of this AD, whichever is later.
Note 1: For the purposes of this AD, a detailed inspection is: "An intensive examination of a specific item, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required."
No Cracking/Repetitive Inspections
(h) If no cracking is found during the initial inspection required by paragraph (g) of this AD: Repeat the inspection thereafter at the applicable interval specified in paragraph (h)(1) or (h)(2) of this AD.
(1) For Model A330 series airplanes: Intervals not to exceed 13,800 flight cycles.
(2) For Model A340-200 and -300 series airplanes: Intervals not to exceed 7,000 flight cycles.
Crack Found/Replacement, Reporting, and Repetitive Inspections
(i) If any cracking is found during any inspection required by paragraph (g) or (h) of this AD: Do the actions in paragraphs (i)(1), (i)(2), and (i)(3) of this AD, except as provided by paragraph (j) of this AD.
(1) Before further flight: Replace the cracked bracket with a new, improved bracket having P/N F2511012920095, in accordance with the service bulletin.
(2) Within 30 days after performing the inspection, or within 30 days after the effective date of this AD, whichever is later: Report the cracked fitting to Airbus, Department AI/SE-A21, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France. The report must include the airplane serial number, the number of flight cycles and flight hours on the airplane, the date of the inspection, and whether both flanges of a bracket are broken. Submitting Appendix 01 of the applicable service bulletin is acceptable for compliance with this paragraph. Under the provisions of the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.), the Office of Management and Budget (OMB) has approved theinformation collection requirements contained in this AD and has assigned OMB Control Number 2120-0056.
(3) Inspect the replaced bracket at the time specified in paragraph (i)(3)(i) or (i)(3)(ii) of this AD. Then, do repetitive inspections or replace the bracket as specified in paragraph (h) or (i) of this AD, as applicable.
(i) For Model A330 series airplanes: Within 16,500 flight cycles after replacing the bracket.
(ii) For Model A340-200 and -300 series airplanes: Within 9,700 flight cycles after replacing the bracket.
(j) If both flanges of a bracket are broken: Before further flight, replace the bracket as specified in paragraph (i)(1) and perform any applicable related investigative and corrective actions (which may include inspections for damage to surrounding structure caused by the broken bracket, and corrective actions for any damage that is found), in accordance with a method approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA; or the Direction Generale de l'Aviation Civile (DGAC) (or its delegated agent).
Alternative Methods of Compliance (AMOCs)
(k) The Manager, International Branch, ANM-116, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19.
Related Information
(l) French airworthiness directives F-2004-140 and F-2004-141, both dated August 18, 2004, also address the subject of this AD.
Material Incorporated by Reference
(m) You must use Airbus Service Bulletin A330-25-3227, including Appendix 01, dated June 17, 2004; or Airbus Service Bulletin A340- 25-4230, including Appendix 01, dated June 17, 2004; as applicable; to perform the actions that are required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approves the incorporation by reference of these documents in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. For copies of the service information, contact Airbus, 1 Rond Point Maurice Bellonte, 31707 Blagnac Cedex, France. For information on the availability of this material at the National Archives and Records Administration (NARA), call (202) 741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html .
You may view the AD docket at the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street SW, room PL- 401, Nassif Building, Washington, DC.