2004-07-14 McDonnell Douglas: Amendment 39-13558. Docket 2003-NM-60-AD. \n\n\tApplicability: Model DC-9-15, DC-9-31, and DC-9-32 airplanes, manufacturer's fuselage numbers 0030, 0094, 0220, 0221, 0863, 0900, 0901, 0913, 0914, 0918, 0923, 0926, and 0930; certificated in any category; equipped with a floor level hinged (ventral) door of the aft pressure bulkhead; as listed in McDonnell Douglas Service Bulletin DC9-53-137, Revision 09, dated January 30, 2003; except for those airplanes on which the modification required by paragraph (d) or (e) of AD 96-10-11, amendment 39-9618, or paragraph K. of AD 85-01-02 R1, amendment 39-5241, has been done. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo detect and correct fatigue cracks in the corners and upper center of the door cutout of the aft pressure bulkhead, which could result in rapid decompression of the fuselage and consequent reduced structural integrity of the airplane, accomplish the following: \n\nVisual and X-Ray Inspection \n\n\t(a) For airplanes on which the modification has not been accomplished per paragraph (i) of this AD: Except as provided by paragraph (j) of this AD, prior to the accumulation of 15,000 total landings, or within 4,000 landings after the effective date of this AD, whichever occurs later, do a visual inspection and an x-ray inspection to detect cracks of the upper and lower corners and upper center of the door cutout of the aft pressure bulkhead, per the Accomplishment Instructions of McDonnell Douglas Service Bulletin DC9-53-137, Revision 09, dated January 30, 2003. \n\nNo Crack Detected: Repetitive Inspections \n\n\t(b) If no crack is detected during any inspection required by paragraph (a) of this AD, do the action specified in either paragraph (b)(1) or (b)(2) of this AD per the Accomplishment Instructions of McDonnell Douglas Service Bulletin DC9-53-137, Revision 09, dated January 30, 2003, as applicable. \n\n\t(1) If interim preventive repairs have been performed per the service bulletin; AD 85-01-02 R1, or AD 96-10-11: Do a visual inspection and an eddy current inspection at the times specified in the service bulletin. Repeat the applicable repetitive inspections thereafter at intervals not to exceed the times specified in the service bulletin, until accomplishment of the action required by paragraph (d) or (i) of this AD. \n\n\t(2) If interim preventive repairs have not been performed per the service bulletin, do either paragraph (b)(2)(i) or (b)(2)(ii) of this AD: \n\n\t(i) Before further flight, install an interim preventive repair identified in Conditions I through XLIII inclusive, excluding Conditions XXI, XXXVII, and XXXVIII (not used at this time), per the service bulletin. At the times specified in the service bulletin, do a visual inspection and an eddy current inspection. At intervals not to exceed the times specified in the service bulletin, repeat the visual and eddy current inspections until accomplishment of the action specified in paragraph (d) or (i) of this AD; or \n\n\t(ii) At intervals not to exceed the times specified in the service bulletin, repeat the visual inspection and x-ray inspection required by paragraph (a) of this AD, until accomplishment of the action specified in paragraph (d) or (i) of this AD. \n\nAny Crack Detected: Corrective Actions and Repetitive Inspections \n\n\t(c) If any crack is detected during any inspection required by paragraph (a) or (b) of this AD, do the actions specified in paragraphs (c)(1) and (c)(2) of this AD per the Accomplishment Instructions of McDonnell Douglas Service Bulletin DC9-53-137, Revision 09, dated January 30, 2003. \n\n\t(1) Before further flight, do the applicable corrective actions (i.e., modification of the bulkhead; trim forward facing flange; stop drill ends of cracks; install repair kit; replacement of cracked part with new parts; and install additional doublers) identified in Conditions I through XLIII inclusive, excluding Conditions XXI, XXXVII,and XXXVIII (not used at this time), of the Accomplishment Instructions of the service bulletin; and \n\n\t(2) At the times specified in the Accomplishment Instructions of the service bulletin, do the applicable repetitive inspections, until accomplishment of the action specified in paragraph (d) or (i) of this AD. \n\nConcurrent Requirements \n\n\t(d) Except as provided by paragraph (j) of this AD, modify the ventral aft pressure bulkhead structure by accomplishing all actions specified in the Accomplishment Instructions of McDonnell Douglas DC-9 Service Bulletin 53-165, Revision 3, dated May 3, 1989, per the service bulletin; at the applicable time specified in paragraph (d)(1), (d)(2), or (d)(3) of this AD. \n\n\t(1) For airplanes on which the bulkhead modification specified in McDonnell Douglas DC-9 Service Bulletin 53-139, dated September 26, 1980; or Revision 1, dated April 30, 1981; has been done, except as provided by paragraph (d)(3) of this AD: Modify within 15,000 landings after accomplishment of the bulkhead modification, or within 4,000 landings after the effective date of this AD, whichever occurs later. Accomplishment of this modification constitutes terminating action for the repetitive inspection requirements of paragraphs (b) and (c)(2) of this AD. \n\n\t(2) For airplanes on which the production equivalent of the modification specified in paragraph (d)(1) of this AD has been done before delivery, except as provided by paragraph (d)(3) of this AD: Modify before the accumulation of 15,000 total landings, or within 4,000 landings after the effective date of this AD, whichever occurs later. Accomplishment of this modification constitutes terminating action for the repetitive inspection requirements of paragraphs (b) and (c)(2) of this AD. \n\n\t(3) For airplanes listed in McDonnell Douglas DC-9 Service Bulletin 53-165, Revision 3, dated May 3, 1989, that are specified in paragraph (f) of this AD: Modify in conjunction with the requirements of paragraph (f)of this AD, or within 18 months after accomplishment of the requirements of paragraph (f) of this AD. \n\n\t(e) Modification before the effective date of this AD per McDonnell Douglas DC-9 Service Bulletin 53-165, dated January 31, 1983; Revision 1, dated February 20, 1984; or Revision 2, dated August 29, 1986; is considered acceptable for compliance with the requirements of paragraph (d) of this AD. \n\nModification: Ventral Aft Pressure Bulkhead \n\n\t(f) For Model DC-9-30 and "50 series airplanes, and C-9 airplanes, as listed in McDonnell Douglas DC-9 Service Bulletin 53-157, Revision 1, dated January 7, 1985: Except as provided by paragraph (j) of this AD, within 18 months after the effective date of this AD, modify the ventral aft pressure bulkhead per the service bulletin. \n\n\t(g) Modification before the effective date of this AD per McDonnell Douglas DC-9 Service Bulletin 53-157, dated August 11, 1981, is considered acceptable for compliance with the requirements of paragraph (f) of this AD. \n\nCompliance With AD 85-01-02 R1 \n\n\t(h) Accomplishment of the visual and x-ray inspections required by paragraph (a) of this AD constitutes terminating action for the repetitive inspection requirements of AD 85-01-02 R1. \n\nTerminating Modification \n\n\t(i) Accomplishment of the modification (reference McDonnell Douglas DC-9 Service Bulletin 53-166) required by paragraph (d) or (e) of AD 96-10-11 (which references "DC-9/MD-80 Aging Aircraft Service Action Requirements Document" (SARD), McDonnell Douglas Report No. MDC K1572, Revision A, dated June 1, 1990; or Revision B, dated January 15, 1993; as the appropriate source of service information for accomplishing the modification) terminates the repetitive inspection requirements of paragraphs (b) and (c) of this AD. \n\nException to Inspections and Modifications \n\n\t(j) As of the effective date of this AD, the inspections and modifications required by this AD do not need to be done during any period that the airplaneis operated without cabin pressurization and a placard is installed in the cockpit in full view of the pilot that states the following: \n\n\t"OPERATION WITH CABIN PRESSURIZATION IS PROHIBITED." \n\nActions Accomplished Per Previous Issue of Service Bulletin \n\n\t(k) Inspections, corrective actions, and follow-on actions accomplished before the effective date of this AD per McDonnell Douglas Service Bulletin DC9-53-137, Revision 07, dated February 6, 2001; or McDonnell Douglas Service Bulletin DC9-53-137, Revision 08, dated November 22, 2002; are considered acceptable for compliance with the corresponding action specified in this AD. \n\nCredit for AD 2002-07-06, Amendment 39-12700 \n\n\t(l) Accomplishment of the actions specified in AD 2002-07-06 is acceptable for compliance with the requirements of this AD. \n\nSubmission of Information to Manufacturer Not Required \n\n\t(m) Although McDonnell Douglas Service Bulletin DC9-53-137, Revision 09, dated January 30, 2003, specifies to submitcertain information to the manufacturer, this AD does not include such a requirement. \n\nAlternative Methods of Compliance \n\n\t(n)(1) In accordance with 14 CFR 39.19, the Manager, Los Angeles Aircraft Certification Office (ACO), FAA, is authorized to approve alternative methods of compliance for this AD. \n\n\t(2) AMOCs approved previously in accordance with AD 85-01-02 R1, amendment 39-4978; or AD 96-10-11, amendment 39-9618; are approved as AMOCs for paragraph (a) or (c) of this AD, as appropriate. \n\n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD, if it is approved by a Boeing Company Engineering Representative (DER) who has been authorized by the Manager, Los Angeles ACO, to make such findings. \n\nIncorporation by Reference \n\n\t(o) Unless otherwise specified in this AD, the actions shall be done in accordance with McDonnell Douglas Service Bulletin DC9-53-137, Revision 09, dated January 30, 2003; McDonnell Douglas DC-9 Service Bulletin 53-165, Revision 3, dated May 3, 1989; and McDonnell Douglas DC-9 Service Bulletin 53-157, Revision 1, dated January 7, 1985; as applicable. \n\n\t(1) The incorporation by reference of McDonnell Douglas Service Bulletin DC9-53-137, Revision 09, dated January 30, 2003, is approved by the Director of the Federal Register, in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. \n\n\t(2) The incorporation by reference of McDonnell Douglas DC-9 Service Bulletin 53-165, Revision 3, dated May 3, 1989; and McDonnell Douglas DC-9 Service Bulletin 53-157, Revision 1, dated January 7, 1985; was approved previously by the Director of the Federal Register as of May 14, 2002 (67 FR 16987, April 9, 2002). \n\n\t(3) Copies may be obtained from Boeing Commercial Airplanes, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Data and Service Management, Dept. C1-L5A (D800-0024). Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(p) This amendment becomes effective on May 11, 2004.