2004-05-22 Rolls-Royce Deutschland Ltd & Co KG (RRD) (Formerly Rolls-Royce, plc): Amendment 39-13517. Docket No. 2004-NE-11-AD.
Effective Date
(a) This airworthiness directive (AD) becomes effective March 25, 2004.
Affected ADs
(b) None.
Applicability
(c) This AD applies to RRD TAY 611-8, TAY 620-15, TAY 650-15, and TAY 651-54 series turbofan engines with ice-impact panels installed in the low pressure (LP) compressor case that conform to Rolls-Royce, plc (RR) Service Bulletin (SB) No. TAY-72-1326 or were repaired using repair procedures TV5415R or HRS3491. These engines are installed on, but not limited to, Fokker F.28 Mk.0070 and Mk.0100 series airplanes, Gulfstream Aerospace G-IV series airplanes, and Boeing Company 727-100 series airplanes modified in accordance with Supplemental Type Certificate (STC) SA8472SW (727- QF).
Unsafe Condition
(d) This AD results from two reports of ice-impact panels that released during flight, one of which resulted in reduction of power in both engines. We are issuing this AD to prevent release of ice- impact panels due to improper bonding that can result in loss of thrust in both engines.
Compliance
(e) You are responsible for having the actions required by this AD performed within the compliance times specified unless the actions have already been done.
Inspecting the Ice-impact Panels for Movement and Moisture on the Panel and Damage to the Blue Filler on Airplanes That Have Two or Three Engines With the Affected Ice-impact Panels
(f) For airplanes that have two TAY 620-15 or TAY 650-15 engines with ice-impact panels, and the ice-impact panels on any of those engines incorporate RR SB No. TAY-72-1326 or were repaired using repair procedures TV5415R or HRS3491, do the following.
(1) Within 500 cycles-in-service (CIS) after the effective date of this AD, but no later than August 15, 2004, inspect for the condition of the ice-impact panels and blue fillers on one or two engines so that no more than one engine with ice-impact panels and fillers that need to be inspected remains on the airplane. Use 3.B.(1) through 3.D.(2) of the Accomplishment Instructions of RRD SB No. TAY-72-1627, Revision 2, dated February 5, 2004.
(2) Within 1,500 CIS after the effective date of this AD, inspect for the condition of the ice-impact panels and blue fillers on the remaining engine. Use 3.B.(1) through 3.D.(2) of the Accomplishment Instructions of RRD SB No. TAY-72-1627, Revision 2, dated February 5, 2004.
(g) For airplanes that have two or three TAY 651-54 engines with ice-impact panels incorporated with RR SB No. TAY-72-1326 standard or were repaired using repair procedures TV5415R or HRS3491, do the following.
(1) Within 500 cycles-in-service (CIS) after the effective date of this AD, but no later than October 1, 2004, inspect for the condition of the ice-impact panels and blue fillers on one or two engines so that no more than one engine with ice-impact panels and fillers that need to be inspected remains on the airplane. Use 3.B.(1) through 3.D.(2) of the Accomplishment Instructions of RRD SB No. TAY-72-1627, Revision 2, dated February 5, 2004.
(2) Within 1,500 CIS after the effective date of this AD, inspect for the condition of the ice-impact panels and blue fillers on the remaining engine. Use 3.B.(1) through 3.D.(2) of the Accomplishment Instructions of RRD SB No. TAY-72-1627, Revision 2, dated February 5, 2004.
(h) For airplanes that have two TAY 611-8 engines with ice- impact panels, incorporated with RR SB No. TAY-72-1326 standard or were repaired using repair procedures TV5415R or HRS3491, do the following.
(1) Within 372 flight hours (FH) after the effective date of this AD inspect the ice-impact panels on one engine. Use 3.B.(1) through 3.D.(1)(a) of the Accomplishment Instructions of RRD SB No. TAY-72-1631, dated February 6, 2004.
(2) Within 900 FH after the effective date of this AD, inspect the ice-impact panels on the remaining engine. Use 3.B.(1) through 3.D.(1)(a) of the Accomplishment Instructions of RRD SB No. TAY-72- 1631, dated February 6, 2004.
Inspecting the Ice-impact Panels for Movement and Moisture on the Panel and Damage to the Blue Filler on Airplanes That Have One Engine With the Affected Ice-impact Panels
(i) For airplanes that have one TAY 620-15, TAY 650-15, or TAY 651-54 engine with ice-impact panels incorporated with RR SB No. TAY-72-1326 standard or were repaired using repair procedures TV5415R or HRS3491, within 1,500 CIS after the effective date of this AD, inspect for the condition of the ice-impact panels and blue fillers on the engine. Use 3.B.(1) through 3.D.(2) of the Accomplishment Instructions of RRD SB No. TAY-72-1627, Revision 2, dated February 5, 2004.
(j) For airplanes that have one TAY 611-8 engine with ice-impact panels incorporated with RR SB No. TAY-72-1326 standard or were repaired using repair procedures TV5415R or HRS3491, within 900 FH after the effective date of this AD, inspect for the condition of the ice-impact panels and blue fillers on the engine. Use 3.B.(1) through 3.D.(1)(a) of the Accomplishment Instructions of RRD SB No. TAY-72-1631, dated February 6, 2004.
Installing Engines That Are Not Inspected
(k) After the effective date of this AD, do not install any TAY 620-15, TAY 650-15, or TAY 651-54 engine with ice-impact panels, if those ice-impact panels incorporate RR SB No. TAY-72-1326 or were repaired using repair procedures TV5415R or HRS3491, unless the panels and blue fillers are inspected for condition using 3.B.(1) through 3.D.(2) (in-service) or 3.H.(1) through 3.K.(1)(b) (at overhaul or shop visit) of the Accomplishment Instructions of RRD SB No. TAY-72-1627, Revision 2, dated February 5, 2004.
(l) After the effective date of this AD, do not install any TAY 611-8 engine with ice-impact panels, if those ice-impact panels incorporate RR SB No. TAY-72-1326 or were repaired using repair procedures TV5415R or HRS3491, unless the panels are inspected for condition using 3.B.(1) through 3.D.(1)(a) (in-service) or 3.H.(1) through 3.K.(1) (at overhaul or shop visit) of the Accomplishment Instructions of RRD SB No. TAY-72-1631, dated February 6, 2004.
Alternative Methods of Compliance
(m) The Manager, Engine Certification Office, has the authority to approve alternative methods of compliance for this AD if requested using the procedures found in 14 CFR 39.19.
Material Incorporated by Reference
(n) You must use the service information specified in Table 1 to perform the inspections required by this AD. The Director of the Federal Register approved the incorporation by reference of the documents listed in Table 1 of this AD in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. You can get a copy from Rolls-Royce Deutschland Ltd & Co KG, Eschenweg 11, D-15827 Dahlewitz, Germany; telephone 49 (0) 33-7086-1768; fax 49 (0) 33-7086-3356. You may reviewcopies at the FAA, New England Region, Office of the Regional Counsel, 12 New England Executive Park, Burlington MA; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. Table 1 follows:
Table 1.--Incorporation by Reference
Service bulletin No.
Page
Revision
Date
TAY-72-1627, Total Pages--22
TAY-72-1631, Total Pages--19
All
All
2
Original
February 5, 2004
February 6, 2004.
Related Information
(o) Luftfahrt-Bundesamt airworthiness directive (AD) D-2004- 055R1, dated January 24, 2004; and AD D-2004-090, dated February 12, 2004; also address the subject of this AD.