2004-03-09 Boeing: Amendment 39-13453. Docket 2001-NM-238-AD. \n\n\tApplicability: All Model 747-100, 747-100B, 747-100B SUD, 747-200B, 747-200F, 747-200C, 747-300, 747SR, and 747SP series airplanes; certificated in any category. \n\n\tNote 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (k) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo find and fix fatigue cracking of structure near and common to the upper chord and splice fittings of the rear spar of the wing, which could result in loss of structural integrity of the airplane, accomplish the following: \n\nInitial Inspections \n\n\t(a) Perform inspections for discrepancies of the structure near and common to the upper chord and splice fittings of the rear spar of the wing, per Part 2 of the Accomplishment Instructions of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003. The inspection procedures include removing existing bolts; performing an ultrasonic or magnetic particle inspection for cracking of removed H-11 bolts; performing a detailed inspection of all other removed bolts for cracking, corrosion, or damage; replacing cracked, corroded, or damaged bolts with new improved bolts; removing any installed repair bushings; performing an open-hole high frequency eddy current (HFEC) inspection for cracking of the bolt holes; installing new bushings, if necessary; reinstalling bolts that are not cracked, corroded, or damaged; torquing the nuts; performing a detailed inspection of the shim between the kick fitting and bulkhead strap for cracking or migration; and replacing the shim with a new shim if necessary, except as provided by paragraph (h) of this AD. Do the initial inspection at the time specified in paragraph (a)(1) or (a)(2) of this AD, whichever is later. \n\n\t(1) Inspect at the earlier of the applicable times specified in the "Flights" and "Hours" columns under the heading "Initial Inspection Threshold" in Table 1 of Figure 1 of the service bulletin. Where the "Initial Inspection Threshold" column of Table 1 of Figure 1 of the service bulletin specifies "flights" and "hours," for the purposes of this paragraph the numbers in that column are considered to be the airplane's total flight cycles and total flight hours. \n\n\t(2) Inspect within 18 months after the effective dateof this AD. \n\n\tNote 2: For the purposes of this AD, a detailed inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required." \n\nRepetitive Inspections \n\n\t(b) Repeat the inspection required by paragraph (a) of this AD at intervals not to exceed the earlier of the times specified in the "Flights" and "Hours" columns under the heading "Repeat Inspection Intervals" in Table 1 of Figure 1 of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003, until paragraph (d) of this AD is accomplished. Where the "Repeat Inspection Intervals" column of Table 1 of Figure 1 of the service bulletin specifies "flights" and "hours," for the purposes of this paragraph, the figures in that column are considered to be the number of flight cycles and flight hours from the time of the most recent inspection per paragraph (a) or (b) of this AD, except as provided by paragraph (g) of this AD. \n\nRepair \n\n\t(c) If any cracking, corrosion, or damage is found during any inspection required by paragraph (a), (b) or (d) of this AD, before further flight, repair per Part 3 or 4 (as applicable) of the Accomplishment Instructions of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003, except as provided by paragraph (h) of this AD. \n\nOptional Modification \n\n\t(d) Accomplishment of the modification specified in Part 4 of the Accomplishment Instructions of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003, constitutes terminating action for the initial inspections required by paragraph (a) of this AD and the repetitive inspections required by paragraph (b) of this AD,provided that the repetitive post-modification inspections required by paragraph (e) of this AD are initiated at the applicable time. The modification procedures include removing installed repair bushings, performing an open-hole HFEC inspection for cracking of the bolt holes, repairing any cracking that is found, oversizing bolt holes, and installing new bushings as required, and new improved bolts. \n\nPost-Modification Inspections \n\n\t(e) For airplanes on which the optional modification specified in paragraph (d) of this AD is accomplished: At the earlier of the times specified in the "Flights" and "Hours" columns under the heading "Post Modification Threshold" in Table 2 of Figure 1 of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003, perform a post-modification inspection per Part 5 of the Accomplishment Instructions of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003. The inspection procedures include removing existing bolts; performing a detailed inspection of removed bolts for cracking, corrosion, or damage; replacing cracked, corroded, or damaged bolts with new bolts; removing any installed repair bushings; performing an open-hole HFEC inspection for cracking of the bolt holes; installing new bushings if necessary; reinstalling bolts that are not cracked, corroded, or damaged; torquing the nuts; performing a detailed inspection of the shim between the kick fitting and bulkhead strap for cracking or migration; and replacing the shim with a new shim if necessary; except as provided by paragraph (h) of this AD. Where the "Post Modification Inspection Threshold" column of Table 2 of Figure 1 of the service bulletin specifies "flights" and "hours," for the purposes of this paragraph, the numbers in that column are considered to be the flight cycles and flight hours after accomplishment of the modification specified in paragraph (d) of this AD. \n\n\t(1) Repeat the inspection at intervals not to exceed the earlier of the times specified in the "Flights" and "Hours" columns under the heading "Post Modification Repeat Inspection Intervals" in Table 2 of Figure 1 of the service bulletin. Where the "Post Modification Repeat Inspection Intervals" column of Table 2 of Figure 1 of the service bulletin specifies "flights" and "hours," for the purposes of this paragraph, the numbers in that column are considered to be the flight cycles and flight hours since the most recent inspection per paragraph (e) or (e)(1) of this AD. \n\n\t(2) If any cracking is found during any inspection required by paragraph (e) or (e)(1) of this AD, before further flight, repair per Part 5 of the Accomplishment Instructions of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003, except as provided by paragraph (h) of this AD. \n\nActions Accomplished per Previous Issue of Service Bulletin \n\n\t(f) Inspections, repairs, or modifications accomplished before the effective date of this AD per Boeing Alert Service Bulletin 747-57A2314, including Appendix A and B, dated June 28, 2001, are considered acceptable for compliance with the corresponding action specified in this AD, except as provided by paragraph (h) of this AD. \n\n\t(g) As specified in Flag Note 1 of the logic diagram in Figure 1 of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003: An inspection accomplished before the effective date of this AD per Figure 4, Step 14, of Boeing Service Bulletin 747-57-2110, Revision 6, dated November 21, 1991; or Revision 7, dated April 23, 1998; is considered acceptable, as applicable, for compliance with the initial inspection required by paragraph (a) of this AD. An inspection accomplished before the effective date of this AD per Figure 4, Step 9, of Boeing Service Bulletin 747-57-2110, Revision 3, dated February 19, 1987; Revision 4, dated May 26, 1988; and Revision 5, dated October 26, 1989; is also considered acceptable, as applicable, for compliance with the initial inspectionrequired by paragraph (a) of this AD. The first repeat inspection per paragraph (b) of this AD must be accomplished at the applicable interval established in paragraph (b) of this AD after the most recent inspection per Figure 4, Step 14, of Boeing Service Bulletin 747-57-2110, Revision 6 or 7; or Figure 4, Step 9, of Boeing Service Bulletin 747-57-2110, Revision 3, 4, or 5. \n\nException to Instructions in Service Bulletin \n\n\t(h) Where Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003, specifies to contact Boeing for appropriate action, before further flight, repair per a method approved by the Manager, Seattle Aircraft Certification Office (ACO), or per data meeting the type certification basis of the airplane approved by a Boeing Company Designated Engineering Representative (DER) who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved, the approval must specifically reference this AD. \n\n\t(i) Although Appendix B of Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003, refers to a reporting requirement, such reporting is not required by this AD. \n\nParts Installation \n\n\t(j) Except as provided by paragraphs (a) and (b) of this AD, as of the effective date of this AD, no person may install any alloy steel (H-11) bolt in any location specified in this AD on any airplane listed in the applicability of this AD. \n\nAlternative Methods of Compliance \n\n\t(k) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle ACO. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\tNote 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits(l) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\n\t(m) Unless otherwise specified in this AD, the actions shall be done in accordance with Boeing Service Bulletin 747-57A2314, Revision 1, dated January 9, 2003. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(n) This amendment becomes effective on March 17, 2004.