2003-19-11 Learjet: Amendment 39-13314. Docket 2000-NM-408-AD. Supersedes AD 95-14-09, Amendment 39-9303.
Applicability: Model 60 airplanes, serial numbers 60-001 through 60-145 inclusive, certificated in any category.
Compliance: Required as indicated, unless accomplished previously.
To prevent chafing and consequent failure of the fuel crossflow tube due to inadequate clearance between the tube and the flight control cables, which could result in loss of fuel from one fuel tank during normal operating conditions or loss of fuel from both main fuel tanks during fuel cross-feeding operations, accomplish the following:
Part Identification
(a) Within 25 flight hours after the effective date of this AD, inspect the fuel crossflow tube to determine whether part number (P/ N) 6026020-005 is installed. Instead of inspecting the tube, a review of airplane maintenance records is acceptable if the P/N of the tube can be positively determined from that review.
Clearance Measurement and Corrective Action
(b) For all airplanes: If P/N 6026020-005 is found installed during the review or inspection required by paragraph (a) of this AD, before further flight, measure the clearance between the fuel crossflow tube and the flight control cables to determine if it is at least 0.35 inch, per paragraph 2.B.(8) of the Accomplishment Instructions of Bombardier Alert Service Bulletin A60-28-3, Revision 2, dated October 26, 1998.
(1) If the clearance is 0.35 inch or more, no further action is required by this paragraph.
(2) If the clearance is less than 0.35 inch, before further flight, repair per a method approved by the Manager, Wichita Aircraft Certification Office (ACO), FAA.
Part Replacement, Measurement, and Repair
(c) For airplanes having serial numbers 60-001 through 60-055: If P/N 6026020-005 is not found installed during the review or inspection required by paragraph (a) of this AD, within 90 days after accomplishing the review or inspection, replace the existing fuel crossflow tube with a new fuel crossflow tube having P/N 6026020-005, and measure the clearance between the newly installed fuel crossflow tube and the flight control cables, per paragraph 2.A. of the Accomplishment Instructions of Bombardier Service Bulletin 60-28-4, Revision 2, dated August 22, 2001.
(1) If the clearance is 0.35 inch or more, no further action is required by this paragraph.
(2) If the clearance is less than 0.35 inch, before further flight, repair per a method approved by the Manager, Wichita ACO, FAA.
(d) For airplanes having serial numbers 60-056 through 60-145: If P/N 6026020-005 is not found installed during the review or inspection required by paragraph (a) of this AD, within 90 days after accomplishing the review or inspection, replace the existing fuel crossflow tube with a new fuel crossflow tube having P/N 6026020-005, and measure the clearance between the newly installed fuel crossflow tube and the flight control cables to determine if the clearance is at least 0.35 inch, per paragraph 2.B. of the Accomplishment Instructions of Bombardier Alert Service Bulletin A60-28-3, Revision 2, dated October 26, 1998.
(1) If the clearance is 0.35 inch or more, no further action is required by this paragraph.
(2) If the clearance is less than 0.35 inch, before further flight, repair per a method approved by the Manager, Wichita ACO, FAA.
Note 1: Bombardier Alert Service Bulletin A60-28-3, Revision 2, Figure 1, Detail D, incorrectly identifies the fuel crossflow tube to be installed as P/N 6026020-001. The manufacturer is aware of this error and plans to correct the part number in the next revision of the alert service bulletin.
Part Installation
(e) As of the effective date of this AD, only fuel crossflow tubes having P/N 6026020-005 shall be installed on any airplane.
Alternative Methods of Compliance
(f) In accordance with 14 CFR 39.19, the Manager, Wichita ACO,FAA, is authorized to approve alternative methods of compliance (AMOCs) for this AD.
Incorporation by Reference
(g) Unless otherwise specified by this AD, the actions shall be done in accordance with Bombardier Alert Service Bulletin A60-28-3, Revision 2, dated October 26, 1998; and Bombardier Service Bulletin 60-28-4, Revision 2, dated August 22, 2001; as applicable. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Learjet, Inc., One Learjet Way, Wichita, Kansas 67209-2942. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the FAA, Wichita Aircraft Certification Office, 1801 Airport Road, Room 100, Mid-Continent Airport, Wichita, Kansas; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Effective Date
(h) This amendment becomes effective on November 3, 2003.