2003-16-06 Boeing: Amendment 39-13259. Docket 2001-NM-232-AD. \n\n\tApplicability: Model 747 series airplanes equipped with General Electric CF6-45 or CF6-50 series engines, certificated in any category. \n\n\tNote 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (i) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplishedpreviously. \n\n\tTo prevent leaking fuel line couplings, chafed fuel lines, restricted or clogged strut drain lines, fluids or vapors migrating to ignition sources, and flashback of external flame into the strut, which could result in uncontained engine strut fire, accomplish the following: \n\nInspection for Chafing and Clearance \n\n\tNote 2: Paragraph (a) of this AD refers to certain portions of Boeing Service Bulletin 747-36-2111, dated February 20, 1992, for information regarding inspection and measurement actions. Further, paragraph (a) of this AD requires replacement of the fuel tube as corrective action for certain repair conditions; that action is not included in the service bulletin. Where this AD and Service Bulletin 747-36-2111 differ, the AD prevails. \n\n\t(a) Within 1,000 flight hours after the effective date of this AD, perform a detailed inspection to detect chafing of the fuel line and measure the clearance between the fuel line and the insulation blanket on the pneumatic duct, in accordance with the Accomplishment Instructions of Boeing Service Bulletin 747-36-2111, dated February 20, 1992. Before further flight, accomplish all applicable corrective actions (including reworking the fuel line, remeasuring the clearance between the fuel line and the insulation blanket, adjusting the pneumatic duct and fuel line positions, adjusting the insulation blanket installation, and inspecting and cleaning the strut and strut drain ports/screens); and, if applicable, repeat the fuel line inspection at the applicable time in the Accomplishment Instructions of the service bulletin. Do the corrective and follow-on actions in accordance with Service Bulletin 747-36-2111. If, after corrective actions have been performed, a clearance of at least 0.40 inch on the number 4 strut cannot be achieved: Before further flight, replace the fuel tube with a new part in accordance with Boeing Service Bulletin 747-28-2162, dated July 30, 1992. \n\n\tNote 3: For the purposes of this AD, a detailed inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required." \n\nFuel Leak Check and Outboard Strut Drain Inspection \n\n\t(b) Within 12 months after the effective date of this AD, perform a fuel pressure leak check of the fuel line in the outboard strut area, and perform an outboard strut drain test for the aft strut drain tubes to detect blockage; in accordance with the Accomplishment Instructions of Boeing Special Attention Service Bulletin 747-28-2230, dated September 30, 1999. If any discrepancy is found, before further flight, perform applicable corrective actions (including performing the fuelpressure check procedure, clearing the strut drain tubes, and repairing seal leaks) in accordance with the service bulletin. \n\nReplacement of O-Rings and Retaining Rings \n\n\t(c) At the earliest of the times specified by paragraphs (c)(1), (c)(2), and (c)(3) of this AD, replace the fuel line coupling O-rings and retaining rings in the outboard strut positions with new Nitrile O-rings, part number MS29513-330, in accordance with Boeing Service Letter 747-SL-28-052-B, dated August 30, 1998. Replace the rings thereafter at the time specified by paragraph (d) of this AD. \n\n\t(1) Within 21,000 flight hours after the effective date of this AD. \n\n\t(2) Within 5 years after the effective date of this AD. \n\n\t(3) Before further flight after a coupling has been disassembled for any reason. \n\nRepetitive Ring Replacement \n\n\t(d) Replace the rings as required by paragraph (c) of this AD at intervals not to exceed the earliest of the times specified by paragraphs (d)(1), (d)(2), and (d)(3)of this AD. \n\n\t(1) Every 21,000 flight hours. \n\n\t(2) Every 5 years. \n\n\t(3) Before further flight after a coupling has been disassembled for any reason. \n\nReplacement of Pneumatic Duct Boot \n\n\t(e) At the earlier of the times specified in paragraphs (e)(1) and (e)(2) of this AD: Replace the fiberglass fabric pneumatic duct boot with a new NOMEX fabric part, in accordance with Boeing Service Bulletin 747-36-2118, dated January 28, 1993. \n\n\t(1) Within 12 months after the effective date of this AD; or \n\n\t(2) Before further flight following detection of any torn boot; or within 5 days following detection of any torn boot, provided there are no leaks, liquid fuel, or vapors in the affected strut compartment. \n\nInstallation of Flame Arrestor \n\n\t(f) For airplanes identified in Boeing Service Bulletin 747-54-2137, dated February 6, 1992: Within 24 months after the effective date of this AD, install a flame arrestor in each aft condensate drain hole of the outboard engine struts, in accordance with the Accomplishment Instructions of the service bulletin. \n\nInstallation of Drain Screen \n\n\t(g) For Group 2 and Group 4 airplanes listed in Boeing Service Bulletin 747-54-2122, Revision 4, dated August 29, 1991, as revised by Notice of Status Change 747-54-2122 NSC 2, dated May 14, 1992; and Information Notice 747-54-2122 IN 03, dated August 19, 1999: Within 24 months after the effective date of this AD, install a drain line entry screen at each drain tube entry at the outboard strut positions, in accordance with the Accomplishment Instructions of the service bulletin. Where the service bulletin specifies that certain actions may be accomplished in accordance with an operator's "equivalent procedure': Those actions must be accomplished in accordance with the applicable Boeing 747 Airplane Maintenance Manual subject specified in the service bulletin. \n\n\t(h) Installation of drain screens before the effective date of this AD is also acceptable for compliance withthe requirements of paragraph (g) of this AD if accomplished in accordance with Boeing Service Bulletin 747-54-2122, Revision 1, dated December 14, 1989; Revision 2, dated May 3, 1990; or Revision 3, dated October 4, 1990. \n\nAlternative Methods of Compliance \n\n\t(i) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\tNote 4: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits \n\n\t(j) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished. \n\nIncorporation by Reference \n\n\t(k) Unless otherwise specified in this AD, the actions shall be done in accordance with Boeing Service Bulletin 747-36-2111, dated February 20, 1992; Boeing Service Bulletin 747-28-2162, dated July 30, 1992; Boeing Special Attention Service Bulletin 2 747-28-2230, dated September 30, 1999; Boeing Service Letter 747-SL-28-052-B, dated August 30, 1998; Boeing Service Bulletin 747-36-2118, dated January 28, 1993; Boeing Service Bulletin 747-54-2137, dated February 6, 1992; and Boeing Service Bulletin 747-54-2122, Revision 4, dated August 29, 1991, as revised by Notice of Status Change 747-54-2122 NSC 2, dated May 14, 1992, and Information Notice 747-54-2122 IN 03, dated August 19, 1999; as applicable. \n\n\tThis incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(l) This amendment becomes effective on September 12, 2003.