2003-11-06 BAE Systems (Operations) Limited (Formerly British Aerospace Regional Aircraft): Amendment 39-13165. Docket 2001-NM-285-AD.
Applicability: All Model ATP airplanes, certificated in any category.
Note 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (d) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Required as indicated, unless accomplished previously.
To prevent fuel vapors from collecting in the dry bay of the wing torsion box and consequent risk of an explosion due to fuel leakage, accomplish the following:
Inspection and Records Check
(a) Within 90 days after the effective date of this AD, do the actions specified in paragraphs (a)(1) and (a)(2) of this AD.
(1) Do a general visual inspection of the fuel pipes within the fuel "float switch" test pipelines in the left and right inner wings for evidence of damage, cracks, misalignment, or fuel leakage; per BAE Systems (Operations) Limited Service Bulletin ATP-28-019, dated March 16, 2001.
Note 2: For the purposes of this AD, a general visual inspection is defined as: "A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to enhance visual access toall exposed surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked."
(2) Perform a check of the airplane records to determine the actual time on the fuel pipes within the "float switch" test pipelines, per BAE Systems (Operations) Limited Service Bulletin ATP-28-020, dated January 25, 2002. This records check may be performed either by the cockpit flight crew or by certificated maintenance personnel.
Repetitive Replacement
(b) If no damage, crack, misalignment, or fuel leakage is found during the inspection required by paragraph (a)(1) of this AD, prior to further flight, reinstall the fuel pipes within the "float switch" test pipelines per BAE Systems (Operations) Limited Service Bulletin ATP-28-020, datedJanuary 25, 2002. Thereafter, replace those pipes with new pipes at the applicable times specified in paragraph (b)(1) or (b)(2) of this AD per the service bulletin.
(1) For fuel pipes that, as of the effective date of this AD, have accumulated less than 10,000 total flight hours or 12,000 total landings since the date of installation on the airplane: Do the replacement prior to the accumulation of 10,000 total flight hours or 12,000 total landings on the pipes since the date of installation, or within 10 months after the effective date of this AD, whichever occurs latest. Thereafter, replace the fuel pipes with new pipes at intervals not to exceed 10,000 total flight hours or 12,000 total landings on the pipes, whichever occurs first. Replacement of the fuel pipes with serviceable pipes instead of new pipes is acceptable for compliance with the requirements of this paragraph, provided that: The total number of flight hours or total number of landings on those pipes can be verified, they have not accumulated 10,000 or more total flight hours or 12,000 or more total landings at the time of installation, and they are replaced prior to the accumulation of 10,000 total flight hours or 12,000 total landings (on the pipes).
(2) For fuel pipes that, as of the effective date of this AD, have accumulated 10,000 or more total flight hours or 12,000 or more total landings since the date of installation on the airplane: Do the replacement within 10 months after the effective date of this AD. Thereafter, replace the fuel pipes at intervals not to exceed 10,000 total flight hours or 12,000 total landings on the pipes, whichever occurs first. Replacement of the fuel pipes with serviceable pipes instead of new pipes is acceptable for compliance with the requirements of this paragraph, provided that: The total number of flight hours or total number of landings on those pipes can be verified, they have not accumulated 10,000 or more total flight hours or 12,000 or more total landings at the time of installation, and they are replaced prior to the accumulation of 10,000 total flight hours or 12,000 total landings (on the pipes).
(c) If any damage, crack, misalignment, or fuel leakage is found during the inspection required by paragraph (a)(1) of this AD, prior to further flight, replace the fuel pipes with new pipes, per BAE Systems (Operations) Limited Service Bulletin ATP-28-020, dated January 25, 2002. Before or upon the accumulation of 10,000 total flight hours or 12,000 total landings on the pipes, whichever occurs first, after the replacement required by this paragraph, replace the fuel pipes with new pipes. Thereafter, replace the fuel pipes at intervals not to exceed the accumulation of 10,000 total flight hours or 12,000 total landings on the pipes, whichever occurs first. Replacement of the fuel pipes with serviceable pipes instead of new pipes is acceptable for compliance with the requirements of this paragraph, provided that: The total number of flight hours or total number of landings on those pipes can be verified, they have not accumulated 10,000 or more total flight hours or 12,000 or more total landings at the time of installation, and they are replaced prior to the accumulation of 10,000 total flight hours or 12,000 total landings (on the pipes).
Alternative Methods of Compliance
(d) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, International Branch, ANM-116, Transport Airplane Directorate, FAA. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, International Branch, ANM-116.
Note 3: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the International Branch, ANM-116.
Special Flight Permits
(e) Special flightpermits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.
Incorporation by Reference
(f) The actions must be done in accordance with BAE Systems (Operations) Limited Service Bulletin ATP-28-019, dated March 16, 2001; and BAE Systems (Operations) Limited Service Bulletin ATP-28-020, dated January 25, 2002. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from British Aerospace Regional Aircraft American Support, 13850 Mclearen Road, Herndon, Virginia 20171. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC.
Note 4: The subject of this AD isaddressed in British airworthiness directives 003-03-2001 and 008-01-2002.
Effective Date
(g) This amendment becomes effective on July 3, 2003.