2002-25-08 General Electric Company (GE): Docket No. 2001-NE-26-AD. Supersedes AD 95-18-14, Amendment 39-9361; AD 99-24-15, Amendment 39-11440; and AD 2000-16-12, Amendment 39-11868.
Applicability:This airworthiness directive (AD) is applicable to GE CF6-45, -50, -80A, -80C2, and -80E1 turbofan engines with high pressure compressor rotor (HPCR) stage 3-9 spools with part numbers (P/N's) listed in the following Table 1 installed:
Table 1
Engine model
HPCR stage 3-9 spool P/N
CF6-45/50 Series Engines
9136M89G02, 9136M89G03, 9136M89G06, 9136M89G07, 9136M89G08, 9136M89G09, 9136M89G17, 9136M89G18,
9136M89G19, 9136M89G21, 9136M89G22, 9136M89G27,
9136M89G29, 9253M85G01, 9253M85G02, 9273M14G01,
9331M29G01.
CF6-80A Series Engines
9136M89G10, 9136M89G11, 9136M89G20, 9136M89G21,
9136M89G22, 9136M89G27, 9136M89G28
CF6-80C2 Series Engines
1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09,
1333M66G10, 1781M52P01, 1781M52P02, 1781M53G01,
1781M53G02 1781M53G03, 1781M53G04, 1781M53G05,
1781M53G06, 1781M53G07, 1781M53G08, 1781M53G09,
1781M53G10, 1854M95P01, 1854M95P02, 1854M95P03,
1854M95P04, 1854M95P05, 1854M95P06, 1854M95P07,
1854M95P08, 9380M28P05.
CF6-80E1 Series Engines
1669M22G01, 1669M22G03, 1782M22G01, 1782M22G02,
1782M22G04.
These engines are installed on, but not limited to, Airbus A300, A310, and A330 series, Boeing 747 and 767 series, and McDonnell Douglas DC-10 and MD-11 series airplanes.
Note 1: This AD applies to each engine identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For engines that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (p) of this AD. The request should include an assessment of the effect of the modification,alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it.
Compliance: Compliance with this AD is required as indicated, unless already done.
To detect cracks, which can cause separation of the HPCR stage 3-9 spool and possible uncontained engine failure, do the following:
CF6-45 and -50 16-Inch Billet Spools
(a) For CF6 HPCR stage 3-9 spool, part numbers (P/N's) 9136M89G02 and 9136M89G06; and for P/N's 9136M89G08, 9253M85G02, 9273M14G01, 9331M29G01 with serial numbers (SN's) listed in the following Table 2, do the following:
TABLE 2
MPOE3486 MPOG3832 MPOG3839 MPOG3846 MPOG5231 MPOG6731 MPOG6740 MPOG7713 MPOG7720 MPOG7727 MPOG7734 MPOG7741 MPOG7822 MPOG7829 MPOG7836 MPOG8825 MPOG8832 MPOG9186 MPOH0295 MPOH0302 MPOH2042 MPOH2049 MPOH2056 MPOH2829 MPOH2836 MPOH2843 MPOH2850 MPOH2857 MPOH4312 MPOH5282 MPOH5534 MPOH5541 MPOH5548 MPOH7020 MPOH7027 MPOH7968 MPOH7975 MPOH8644 MPOH8651 MPOH8658 MPOH8683
MPOE3487 MPOG3833 MPOG3840 MPOG3847 MPOG5232 MPOG6732 MPOG6741 MPOG7714 MPOG7721 MPOG7728 MPOG7735 MPOG7742 MPOG7823 MPOG7830 MPOG7837 MPOG8826 MPOG8833 MPOH0289 MPOH0296 MPOH0303 MPOH2043 MPOH2050 MPOH2057 MPOH2830 MPOH2837 MPOH2844 MPOH2851 MPOH2858 MPOH4313 MPOH5283 MPOH5535 MPOH5542 MPOH5549 MPOH7021 MPOH7028 MPOH7969 MPOH8638 MPOH8645 MPOH8652 MPOH8659 MPOH8684
MPOE3488 MPOG3834 MPOG3841 MPOG3848 MPOG6216 MPOG6733 MPOG6742 MPOG7715 MPOG7722 MPOG7729 MPOG7736 MPOG7743 MPOG7824 MPOG7831 MPOG7838 MPOG8827 MPOG8834 MPOH0290 MPOH0297 MPOH0304 MPOH2044 MPOH2051 MPOH2058 MPOH2831 MPOH2838 MPOH2845 MPOH2852 MPOH4307 MPOH5277 MPOH5520 MPOH5536 MPOH5543 MPOH5550 MPOH7022 MPOH7030 MPOH7970 MPOH8639 MPOH8646 MPOH8653 MPOH8677 MPOJ1796
MPOE3489 MPOG3835 MPOG3842 MPOG3850 MPOG6727 MPOG6735 MPOG6743 MPOG7716 MPOG7723 MPOG7730 MPOG7737 MPOG7744 MPOG7825 MPOG7832 MPOG7839 MPOG8828 MPOG8835 MPOH0291 MPOH0298 MPOH0305 MPOH2045 MPOH2052 MPOH2059 MPOH2832 MPOH2839 MPOH2846 MPOH2853 MPOH4308 MPOH5278 MPOH5530 MPOH5537 MPOH5544 MPOH5551 MPOH7023 MPOH7960 MPOH7971 MPOH8640 MPOH8647 MPOH8654 MPOH8678 MPOJ1797
MPOE3490 MPOG3836 MPOG3843 MPOG3851 MPOG6728 MPOG6736 MPOG6744 MPOG7717 MPOG7724 MPOG7731 MPOG7738 MPOG7819 MPOG7826 MPOG7833 MPOG8822 MPOG8829 MPOG8836 MPOH0292 MPOH0299 MPOH1805 MPOH2046 MPOH2053 MPOH2060 MPOH2833 MPOH2840 MPOH2847 MPOH2854 MPOH4309 MPOH5279 MPOH5531 MPOH5538 MPOH5545 MPOH5552 MPOH7024 MPOH7965 MPOH7972 MPOH8641 MPOH8648 MPOH8655 MPOH8679 MPOJ1798
MPOE3491 MPOG3837 MPOG3844 MPOG5228 MPOG6729 MPOG6738 MPOG6745 MPOG7718 MPOG7725 MPOG7732 MPOG7739 MPOG7820 MPOG7827 MPOG7834 MPOG8823 MPOG8830 MPOG8837 MPOH0293 MPOH0300 MPOH2040 MPOH2047 MPOH2054 MPOH2061 MPOH2834 MPOH2841 MPOH2848 MPOH2855 MPOH4310 MPOH5280 MPOH5532 MPOH5539 MPOH5546 MPOH5553 MPOH7025 MPOH7966 MPOH7973 MPOH8642 MPOH8649 MPOH8656 MPOH8680 MPOJ1799
MPOE3492 MPOG3838 MPOG3845 MPOG5230 MPOG6730 MPOG6739 MPOG6746MPOG7719 MPOG7726 MPOG7733 MPOG7740 MPOG7821 MPOG7828 MPOG7835 MPOG8824 MPOG8831 MPOG9185 MPOH0294 MPOH0301 MPOH2041 MPOH2048 MPOH2055 MPOH2062 MPOH2835 MPOH2842 MPOH2849 MPOH2856 MPOH4311 MPOH5281 MPOH5533 MPOH5540 MPOH5547 MPOH5554 MPOH7026 MPOH7967 MPOH7974 MPOH8643 MPOH8650 MPOH8657 MPOH8682 MPOJ1800
MPOJ1801 MPOJ1933 MPOJ1941 MPOJ1948 MPOJ1956 MPOJ2424 MPOJ2431 MPOJ2438 MPOJ2445 MPOJ4174 MPOJ6041 MPOJ6048 MPOJ6055 MPOJ6062 MPOJ6500 MPOJ6508 MPOJ6515 MPOJ7636 MPOJ7643 MPOJ9308 MPOJ9315 MPOK1239 MPOK1829 MPOK3068 MPOK4662 MPOK5083 MPOK5521 MPOK5960 MPOK6249 MPOK6256 MPOK6826 MPOK7227 MPOK7234 MPOM2134 MPOM2359 MPOM2366 MPOM5525 MPOM5532 MPOM6152 MPOM6159 MPOM7091 MPOM7098 MPOM7105 MPOM8299 MPOM9259 MPOM9723 MPON0058 MPON0065 MPON0075 MPON1082 MPON1090 MPON1097 MPON4254
MPOJ1803 MPOJ1934 MPOJ1942 MPOJ1949 MPOJ1957 MPOJ2425 MPOJ2432 MPOJ2439 MPOJ2446 MPOJ5185 MPOJ6042 MPOJ6049 MPOJ6056 MPOJ6063 MPOJ6501 MPOJ6509 MPOJ6516 MPOJ7637 MPOJ8046 MPOJ9309 MPOK1233 MPOK1240 MPOK1830 MPOK3069 MPOK4663 MPOK5084 MPOK5522 MPOK5961 MPOK6250 MPOK6257 MPOK6827 MPOK7228 MPOM2128 MPOM2135 MPOM2360 MPOM2461 MPOM5526 MPOM5533 MPOM6153 MPOM6160 MPOM7092 MPOM7099 MPOM7106 MPOM8300 MPOM9260 MPON0051 MPON0059 MPON0066 MPON0076 MPON1084 MPON1091 MPON1098 MPON4255
MPOJ1804 MPOJ1935 MPOJ1943 MPOJ1950 MPOJ1958 MPOJ2426 MPOJ2433 MPOJ2440 MPOJ2447 MPOJ5186 MPOJ6043 MPOJ6050 MPOJ6057 MPOJ6064 MPOJ6502 MPOJ6510 MPOJ6517 MPOJ7638 MPOJ8047 MPOJ9310 MPOK1234 MPOK1824 MPOK1831 MPOK3070 MPOK4664 MPOK5085 MPOK5955 MPOK5962 MPOK6251 MPOK6715 MPOK6828 MPOK7229 MPOM2129 MPOM2136 MPOM2361 MPOM2462 MPOM5527 MPOM5534 MPOM6154 MPOM6161 MPOM7093 MPOM7100 MPOM7107 MPOM8301 MPOM9261 MPON0052 MPON0060 MPON0067 MPON1077 MPON1085 MPON1092 MPON1099 MPON4256
MPOJ1806 MPOJ1936 MPOJ1944 MPOJ1951 MPOJ2420 MPOJ2427 MPOJ2434 MPOJ2441 MPOJ2448 MPOJ6035 MPOJ6044 MPOJ6051 MPOJ6058 MPOJ6065 MPOJ6503 MPOJ6511 MPOJ7632 MPOJ7639 MPOJ8048 MPOJ9311 MPOK1235 MPOK1825 MPOK1832 MPOK3071 MPOK4665 MPOK5086 MPOK5956 MPOK5963 MPOK6252 MPOK6716 MPOK6829 MPOK7230 MPOM2130 MPOM2137 MPOM2362 MPOM5521 MPOM5528 MPOM5535 MPOM6155 MPOM6162 MPOM7094 MPOM7101 MPOM7108 MPOM8302 MPOM9262 MPON0053 MPON0061 MPON0068 MPON1078 MPON1086 MPON1093 MPON1100
MPOJ1930 MPOJ1938 MPOJ1945 MPOJ1953 MPOJ2421 MPOJ2428 MPOJ2435 MPOJ2442 MPOJ2449 MPOJ6036 MPOJ6045 MPOJ6052 MPOJ6059 MPOJ6066 MPOJ6505 MPOJ6512 MPOJ7633 MPOJ7640 MPOJ8049 MPOJ9312 MPOK1236 MPOK1826 MPOK2694 MPOK4659 MPOK4666 MPOK5087 MPOK5957 MPOK5964 MPOK6253 MPOK6823 MPOK6830 MPOK7231 MPOM2131 MPOM2138 MPOM2363 MPOM5522 MPOM5529 MPOM5536 MPOM6156 MPOM7087 MPOM7095 MPOM7102 MPOM7109 MPOM9246 MPOM9265 MPON0055 MPON0062 MPON0069 MPON1079 MPON1087 MPON1094 MPON1642
MPOJ1931 MPOJ1939 MPOJ1946 MPOJ1954 MPOJ2422 MPOJ2429 MPOJ2436 MPOJ2443 MPOJ2450 MPOJ6039 MPOJ6046 MPOJ6053 MPOJ6060 MPOJ6067 MPOJ6506 MPOJ6513 MPOJ7634 MPOJ7641 MPOJ8050 MPOJ9313 MPOK1237 MPOK1827 MPOK2695 MPOK4660 MPOK4667 MPOK5088 MPOK5958 MPOK6247 MPOK6254 MPOK6824 MPOK6831 MPOK7232 MPOM2132 MPOM2357MPOM2364 MPOM5523 MPOM5530 MPOM5537 MPOM6157 MPOM7088 MPOM7096 MPOM7103 MPOM8297 MPOM9257 MPOM9721 MPON0056 MPON0063 MPON0073 MPON1080 MPON1088 MPON1095 MPON4250
MPOJ1932 MPOJ1940 MPOJ1947 MPOJ1955 MPOJ2423 MPOJ2430 MPOJ2437 MPOJ2444 MPOJ4173 MPOJ6040 MPOJ6047 MPOJ6054 MPOJ6061 MPOJ6068 MPOJ6507 MPOJ6514 MPOJ7635 MPOJ7642 MPOJ8051 MPOJ9314 MPOK1238 MPOK1828 MPOK3067 MPOK4661 MPOK5082 MPOK5520 MPOK5959 MPOK6248 MPOK6255 MPOK6825 MPOK7226 MPOK7233 MPOM2133 MPOM2358 MPOM2365 MPOM5524 MPOM5531 MPOM6151 MPOM6158 MPOM7089 MPOM7097 MPOM7104 MPOM8298 MPOM9258 MPOM9722 MPON0057 MPON0064 MPON0074 MPON1081 MPON1089 MPON1096 MPON4252
Initial Inspection
(1) If the spool has not already been inspected using one of the alert service bulletins (ASB's) or service bulletins (SB's) listed in Column A of the following Table 3; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore inaccordance with alert service bulletin
(ASB) CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002, and the following compliance times:
TABLE 3
CF6-45 and -50
SB No.
Procedures (70-32-XX) in Standard Practices Manual GEK9250
Column A
Column B
Column C
Column D
Column E
SB 72-888, Revision 3, dated January 31, 1991.
70-32-09, Revision 71, dated October 1, 1995.
70-32-10, 71, Revision dated October 1, 1995.
70-32-13, Temporary Re- vision (TR), 70-25, dated August 26, 1996.
70-32-14, TR 70-26, dated August 26, 1996.
SB 72-888, Revision 4, dated March 28, 1991.
70-32-09, Revision 72, dated November 15, 1996.
70-32-10, Revision 72, dated November 15, 1996.
70-32-13, Revision 72, dated November 15, 1996.
70-32-14, Revision 72, dated November 15, 1996.
SB 72-888, Revision 5, dated November 7, 1994.
70-32-09, Revision 74, dated May 1, 1998.
70-32-10, Revision 74, dated May 1, 1998.
70-32-13, Revision 73, dated November 1, 1997.
70-32-14, Revision 73,dated November 1, 1997.
SB 72-888, Revision 6, dated December 22, 1995.
70-32-10, Revision 75, dated December 15, 1998.
70-32-13, Revision 75, dated December 15, 1998.
70-32-14, Revision 75, dated December 15, 1998.
SB 72-1000, Original dated December 14, 1990.
70-32-13, TR 70-41, dated February 10, 1999.
70-32-14, TR 70-42, dated February 10, 1999.
SB 72-1000, Revision 1, dated March 28, 1991.
70-32-13, Revision 76, dated May 15, 1999.
70-32-14, Revision 76, dated May 15, 1999.
SB 72-1000, Revision 2, dated September 9, 1993.
70-32-17, TR 70-39, dated December 15, 1998.
70-32-18, TR 70-40, dated December 15, 1998.
SB 72-1000, Revision 3, dated December 22, 1995.
70-32-17, Revision 76, dated May 15, 1999.
70-32-18, Revision 76, dated May 15, 1999.
SB 72-1108, Original, dated November 6, 1995.
SB 72-1108, Revision 1, dated July 29, 1996.
ASB 72-A1108, Revision 2, dated October 28, 1999.
ASB 72-A1108, Revision 3, dated November 12, 1999.
ASB 72-A1108, Revision 4, dated June 6, 2001.
ASB CF6-50 S/B 72- A1108, Revision 5, dated October 2, 2002.
70-32-17, TR 70-47, dated October 28, 1999.
70-32-18, TR 70-48, dated October 28, 1999.
(i) For spools with greater than 3,500 cycles-since-new (CSN) on the effective date of this AD, inspect before further flight.
(ii) For spools with 3,500 or fewer CSN, on the effective date of this AD, inspect at the first piece-part exposure (PPE) after 1,000 CSN or before 3,500 CSN, whichever occurs earlier.
(2) For spools that have not been inspected using ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, or an earlier revision of ASB CF6-50 S/B 72-A1131 or SB 72-1131, inspect the web and hub- to-web transition areas in accordance with the requirements of ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, at the first PPE after 1,000 CSN, but before 4,000 additional cycles in-service (CIS) after the effective date of this AD.
(3) For spools that have not been inspected using ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002, or an earlier revision of ASB CF6-50 S/B 72-A1157, inspect the stage 3-5 dovetail slot bottoms in accordance with the requirements of ASB CF6-50 S/B 72- A1157, Revision 4, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1000 CSN, or
(ii) The first HPC rotor exposure after 1000 CSN, or
(iii) The next required inspection to ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002.
Repetitive Inspection
(4) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect the hub and bore in accordance with the requirements of ASB CF6-50 S/B 72- A1108, Revision 5, dated October 2, 2002, and the stage 3-5 dovetail slot bottoms in accordance with ASB CF6-50 S/B 72-A1157,Revision 4, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 cycles-since-last-inspection (CSLI) and 3,500 CSN, or
(ii) From July 29, 2001 through January 27, 2003, before the cycle limits of the following Table 4:
TABLE 4
CSN at last inspection
Repeat inspection by -
(A) 6,000 or fewer CSN
3,500 CSLI.
(B) 6,001 to 7,000 CSN
9,500 CSN.
(C) 7,001 to 8,000 CSN
2,500 CSLI.
(D) 8,001 to 8,500 CSN
10,500 CSN.
(E) 8,501 or more CSN
2,000 CSLI.
(iii) After January 27, 2003, before the cycle limits of the following Table 5:
TABLE 5.
CSN at last inspection
Repeat inspection by -
(A) 5,000 or fewer CSN
3,500 CSLI.
(B) 5,001 to 5,500 CSN
8,500 CSN.
(C) 5,501 to 6,500 CSN
3,000 CSLI.
(D) 6,501 to 7,000 CSN
9,500 CSN.
(E) 7,001 to 8,000 CSN
2,500 CSLI.
(F) 8,001 to 8,500 CSN
10,500 CSN.
(G) 8,501 or more CSN
2,000 CSLI.
Spool Disposition
(5) If inspection findings equal or exceed the reject limits established by ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002; or ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002; or ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002, replace spool before further flight.
CF6-45 and -50 13-inch Billet Spools
(b) For CF6 HPC Rotor Stage 3-9 Spool, P/N's 9136M89G03, 9136M89G07, 9136M89G09, 9136M89G17, 9136M89G18, 9253M85G01, and for P/N's 9136M89G08, 9253M85G01, 9273M14G01, and 9331M29G01 with serial numbers that are not listed in Table 2, do the following:
Initial Inspection
(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002 before further flight.
(2) If the spool has 7,000 or fewer CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first engine shop visit (ESV) after 4,000 CSN, or
(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 4,000 CSN.
(3) For spools that have not been inspected using ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, or an earlier revision of ASB CF6-50 S/B 72-A1131 or SB 72-1131, inspect the web and hub- to-web transition areas in accordance with the requirements of ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.
(4) For spools that have not been inspected using ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002, or an earlier revision of ASB CF6-50 S/B 72-A1157, inspect the stage 3-5 dovetail slot bottoms in accordance with the requirements of ASB CF6-50 S/B 72- A1157, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.
Repetitive Inspection
(5) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect the hub and bore in accordance with the requirements of ASB CF6-50 S/B 72- A1108, Revision 5, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 CSLI and 4,000 CSN, or
(ii) Each ESV with more than 2,000 CSLI and 4,000 CSN, or
(iii) Before 4,000 CSLI.
Spool Disposition
(6) If inspection findings equal or exceed the reject limits established by ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002; or ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002; or ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002, replace spool before further flight.
CF6-45 and -50 9 and 10-Inch Billet Spools
(c) For CF6 HPCR stage 3-9 spool, P/N's 9136M89G19, 9136M89G21, 9136M89G22 and 9136M89G27, do the following:
Initial Inspection
(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect the hub and bore in accordance with ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002 before further flight.
(2) If the spool has 7,000 or fewer CSN on the effective date of this AD, and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect the hub and bore in accordance with ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 3,000 CSN, or
(iii) From July 29, 2001 through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.
(3) For spools that have not been inspected using ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, or an earlier revision of ASB CF6-50 S/B 72-A1131 or SB CF6-50 S/B 72-1131, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.
(4) For spools that have not been inspected using ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002, or an earlier revision of ASB CF6-50 S/B 72-A1157, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB CF6-50 S/B 72- A1157, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.
Repetitive Inspection
(5) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect the hub and bore in accordance with the requirements of ASB CF6-50 S/B 72- A1108, Revision 5, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or
(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of the following Table 6, or:
TABLE 6
CSN at last inspection
Reinspect by
(A) 3,500 or fewer CSN
7,000 CSN.
(B) 3,501 to 6,000 CSN
3,500 CSLI.
(C) 6,001 to 7,000 CSN
9,500 CSN.
(D) 7,001 to 8,000 CSN
2,500 CSLI.
(E) 8,001 to 8,500 CSN
10,500 CSN.
(F) 8,501 or more CSN
2,000 CSLI.
(iii) After January 27, 2003, before the cycle limits of Table 5.
Spool Disposition
(6) If inspection findings equal or exceed the reject limits established by ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002; or ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002; or ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002; replace spool before further flight.
SpoolReinstallation Limit
(7) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 9136M89G19, 9136M89G21, 9136M89G22, and 9136M89G27, installed where the spool has 10,500 or more CSN.
CF6-45 and -50 8-Inch Billet 2-Piece spools
(d) For CF6 HPCR stage 3-9 spool, P/N 9136M89G29, do the following:
(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of Table 3; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with the piece-part level inspection of ASB CF6- 50 S/B 72-A1108, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(2) For spools that have not been inspected using ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, or an earlier revision of ASB CF6-50 S/B 72-A1131 or SB 72-1131, inspect the web and hub- to-web transition areas in accordance with the requirements of ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(3) For spools that have not been inspected using ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002, or an earlier revision of ASB 72-A1157, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
Spool Disposition
(4) If inspection findings equal or exceed the reject limits established by ASB CF6-50 S/B 72-A1108, Revision 5, dated October 2, 2002; or ASB CF6-50 S/B 72-A1131, Revision 4, dated October 2, 2002; or ASB CF6-50 S/B 72-A1157, Revision 4, dated October 2, 2002; replace spool before further flight.
CF6-80A 16-Inch Billet Spools
(e) For CF6 HPCR stage 3-9 spool, P/N's 9136M89G10 with SN's MPOM0054, MPOM7090, MPOM8303, MPOM8304, MPOM9263, MPOM9264, MPON0054, MPON0071, MPON0072, MPON1643, MPON4251, or MPON4253, do the following:
Initial Inspection
(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of the following Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002, and the following compliance times:
CF6-80A SB No.
Procedures (70-32-XX) in standard practices manual GEK9250
Column A
Column B
Column C
Column D
Column E
SB 72-500, Revision 3, dated March 19, 1991.
SB 72-500, Revision 4, dated July 1, 1991.
SB 72-500, Revision 5, dated November 7, 1994.
SB 72-500, Revision 6, dated December 22, 1995.
SB 72-583, Original, dated December 20, 1990.
SB 72-583, Revision 1, dated March 18, 1991. SB 72-583, Revision 2, dated July 15, 1991.
SB 72-583, Revision 3, dated July 24, 1991. SB 72-583, Revision 4, dated September 15, 1993.
SB 72-583, Revision 5, dated December 22, 1995.
SB 72-678, Original, dated November 6, 1995. SB 72-678, Revision 1, dated July 29, 1996. ASB 72-A678, Revision 2, dated October 28, 1999. ASB 72-A678, Revision 3, dated November 12, 1999.
ASB 72-A0678, Revision 4, dated June 6, 2001. ASB CF6-80A
S/B 72-A0678, Revision 5, dated October 2, 2002.
70-32-09, Revision 71, dated October 1, 1995.
70-32-09, Revision 72, dated November 15, 1996.
70-32-09, Revision 74, dated May 1, 1998.
70-32-10, Revision 71, dated October 1, 1995
70-32-10, Revision 72, dated November 15, 1996.
70-32-10, Revision 74, dated May 1, 1998.
70-32-10, Revision 75, dated December 15, 1998.
70-32-13, Temporary Revision (TR), 70-25, datedAugust 26, 1996. 70-32-13, Revision 72, dated November 15, 1996.
70-32-13, Revision 73, dated November 1, 1997
70-32-13, Revision 75, dated December 15, 1998.
70-32-13, TR 70-41, dated February 10, 1999
70-32-13, Revision 76, dated May 15, 1999. 70-32-17, TR 70-39, dated December 15, 1998.
70-32-17, Revision 76, dated May 15, 1999. 70-32-17, TR 70-47, dated October 28, 1999.
70-32-14, TR 70-26, dated August 26, 1996.
70-32-14, Revision 72, dated November 15, 1996.
70-32-14, Revision 73, dated November 1, 1997. 70-32-14, Revision 75, dated December 15, 1998.
70-32-14, TR 70-42, dated February 10, 1999.
70-32-14, Revision 76, dated May 15, 1999.
70-32-18, TR 70--40, dated December 15, 1998.
70-32-18, Revision 76, dated May 15, 1999. 70-32-18, TR 70-48, dated October 28, 1999.
(i) For spools with greater than 3,500 CSN on the effective date of this AD, inspect before further flight.
(ii) For spools with 3,500 or fewer CSN on the effective dateof this AD, inspect at the first PPE after 1,000 CSN or before 3,500 CSN, whichever occurs earlier.
(2) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0691, Revision 5, dated October 2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0691 or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB CF6-80A S/B 72-A0691, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS accumulated after the effective date of this AD.
(3) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0719, Revision 5, dated October 2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0719, inspect the stage 3--5 dovetail slot bottom in accordance with the requirements of ASB CF6- 80A S/B 72-A0719, Revision 5, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first HPCR exposure after 1,000 CSN, or
(iii) The next required inspection to ASB
CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002.
Repetitive Inspections
(4) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D and one from Column E, reinspect the hub and bore in accordance with the requirements of ASB CF6-80A S/B 72- A0678, Revision 5, dated October 2, 2002; and the dovetail slot bottoms in accordance with the requirements of ASB CF6-80A S/B 72- A0719, Revision 5, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or
(ii) From July 29, 2001 through January 27, 2003 before the cycle limits of Table 4, or
(iii) After January 27, 2003, before the cycle limits of Table 5.
Spool Disposition
(5) If inspection findings equal or exceed the reject limits established by ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0691, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0719, Revision 5, dated October 2, 2002; replace spool before further flight.
Spool Reinstallation Limit
(6) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool P/N 9136M89G10 with serial numbers (SN's) MPOM0054, MPOM7090, MPOM8303, MPOM8304, MPOM9263, MPOM9264, MPON0054, MPON0071, MPON0072, MPON1643, MPON4251, or MPON4253, installed where the spool has 10,500 or more CSN.
CF6-80A 13-Inch Billet Spools
(f) For all other CF6 HPCR stage 3-9 spools, P/N 9136M89G10, with SN's that are not listed in paragraph (e) of this AD, and P/N 9136M89G11, do the following:
Initial Inspection
(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with ASB CF6-80A 72-A0678, Revision 5, dated October 2, 2002 before further flight.
(2) If the spool has 7,000 or fewer CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 5,000 CSN or
(iii) From July 29, 2001, through January 27, 2003 before 7,000 CSN, and after January 27, 2003, before 5,000 CSN.
(3) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0691, Revision 5, dated October2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0691 or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB CF6-80A S/B 72-A0691, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.
(4) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0719, Revision 5, dated October 2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0719, inspect the dovetail slot bottom in accordance with the requirements of ASB CF6-80A S/B 72- A0719, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.
Repetitive Inspection
(5) For spools installed in CF6-80A1 and CF6-80A3 engines that were inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, reinspect hub and bore in accordance with alert ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 CSLI and 5,000 CSN, or
(ii) Each ESV with more than 2,000 CSLI and 5,000 CSN, or
(iii) Within 4,000 CSLI and more than 5,000 CSN.
(6) Spools installed in CF6-80A and CF6-80A2 engines previously inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect hub and bore in accordance with ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 CSLI and 5,000 CSN, or
(ii) Each ESV with more than 1,500 CSLI and 5,000 CSN, or
(iii) Within 4,000 CSLI and more than 5,000 CSN.
Spool Disposition
(7) If inspection findings equal or exceed the reject limits established by ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0691, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0719, Revision 5, dated October 2, 2002; replace spool before further flight.
CF6-80A 9 and 10-Inch Billet Spools
(g) For CF6 HPCR stage 3-9 spools, P/N's 9136M89G20, 9136M89G21, 9136M89G22 and 9136M89G27, do the following:
Initial Inspection
(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002 before further flight.
(2) If the spool has 7,000 or fewer CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, inspect hub and bore in accordance with ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 3,000 CSN or
(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 5,000 CSN.
(3) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0691, Revision 5, dated October 2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0691, or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB CF6-80A S/B 72-A0691, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or(ii) Within 4,000 additional CIS after the effective date of this AD.
(4) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0719, Revision 5, dated October 2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0719 inspect the dovetail slot bottom in accordance with the requirements of ASB CF6-80A S/B 72- A0719, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.
Repetitive Inspection
(5) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect hub and bore in accordance with ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 CSLI and 5,000 CSN, or
(ii) From July 29, 2001 through January 27, 2003, before the cycle limits of Table 6.
(iii) After January 27, 2003, before the cycle limits of the following Table 8:
TABLE 8
CSN at last inspection
Repeat inspection by -
(A) 1,500 or fewer CSN
5,000 CSN
(B) 1,501 to 5,000 CSN
3,500 CSLI
(C) 5,001 to 5,500 CSN
8,500 CSN
(D) 5,501 to 6,501 CSN
3,000 CSLI
(E) 6,501 to 7,000 CSN
9,500 CSN
(F) 7,001 to 8,000 CSN
2,500 CSLI
(G) 8,001 to 8,500 CSN
10,500 CSN
(H) 8,501 or more CSN
2,000 CSLI
Spool Disposition
(6) If inspection findings equal or exceed the reject limits established by ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0691, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0719, Revision 5, dated October 2, 2002; replace spool before further flight.
Spool Reinstallation Limit
(7) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 9136M89G20, 9136M89G21, 9136M89G22, and 9136M89G27, installed where the spool has 10,500 or more CSN.
CF6-80A 8-Inch Billet 2-Piece Spools
(h) For CF6 HPCR stage 3-9 spool, P/N 9136M89G28, do the following:
(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of Table 7; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with the piece-part level inspection of ASB CF6- 80A S/B 72-A0678, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(2) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0691, Revision 5, dated October 2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0691, or SB 72-0691, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB CF6-80A S/B 72-A0691, Revision5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(3) For spools that have not been inspected using ASB CF6-80A S/ B 72-A0719, Revision 5, dated October 2, 2002, or an earlier revision of ASB CF6-80A S/B 72-A0719 inspect the stage 3--5 dovetail slot bottom in accordance with the requirements of ASB CF6-80A S/B 72-A0719, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
Spool Disposition
(4) If inspection findings equal or exceed the reject limits established by ASB CF6-80A S/B 72-A0678, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0691, Revision 5, dated October 2, 2002; or ASB CF6-80A S/B 72-A0719, Revision 5, dated October 2, 2002; replace spool before further flight.
CF6-80C2 13-Inch Billet Spools
(i) For CF6 HPCR stage 3-9 spool, P/N's 1781M52P01, 1854M95P02,1781M52P02, 1854M95P05and 9380M28P05, do the following:
Initial Inspection
(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of the following Table 9; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with ASB CF6-80C2 S/B 72-A0812, Revision 4, dated October 2, 2002, and the following compliance times:
Table 9
CF6-80C2 SB No
Procedures (70-32-XX) in standard practices manual GEK9250
Column A
Column B
Column C
Column D
Column E
SB 72-418, Revision 2, May 14, 1991.
SB 72-418, Revision 3, November 7, 1994.
SB 72-418, Revision 4, December 22, 1995.
SB 72-758, Original, dated November 7, 1994.
SB 72-758, Revision 1, dated December 22, 1995.
SB 72-812, Original, dated November 6, 1995.
SB 72-812, Revision 1, dated january 30, 1998.
ASB 72-A0812, Revision 2, dated October 28, 1999.ASB 72-A0812, Revision 3, dated June 6, 2001. ASB CF6-80C2 S/B 72-A0812, Revision 4, dated October 2, 2002..
70-32-09, Revision 71,
dated October 1, 1995.
70-32-09, Revision 72,
dated November 15,
1996.
70-32-09, Revision 74,
dated May 1, 1998.
70-32-10, Revision 71, dated October 1, 1995.
70-32-10, Revision 72, dated November 15, 1996.
70-32-10, Revision 74, dated May 1, 1998.
70-32-10, Revision 75, dated December 15, 1998.
70-32-13, Temporary Revision (TR), 70-25, dated August 26, 1996. 70-32-13, Revision 72, dated November 15, 1996.
70-32-13, Revision 73, dated November 1, 1997
70-32-13, Revision 75, dated December 15, 1998.
70-32-13, TR 70-41, dated February 10, 1999
70-32-13, Revision 76, dated May 15, 1999.
70-32-17, TR70-39, dated December 15, 1998.
70-32-17, Revision 76, dated May 15, 1999.
70-32-17, TR 70-47, dated October 28, 1999.
70-32-14, TR 70-26, dated August 26, 1996.
70-32-14, Revision 72,dated November 15, 1996.
70-32-14, Revision 73, dated November 1, 1997.
70-32-14, Revision 75, dated December 15, 1998.
70-32-14, TR 70-42, dated February 10, 1999.
70-32-14, Revision 76, dated May 15, 1999.
70-322-18, TR 70-40, dated December 15, 1998.
70-32-18, Revision 76, dated May 15, 1999.
70-32-18, TR 70-48, October 28, 1999.
(i) For spools with greater than 3,500 CSN on the effective date of this AD, inspect before further flight.
(ii) For spools with 3,500 or fewer CSN on the effective date of this AD, inspect at the first PPE after 1,000 CSN or before 3,500 CSN, whichever occurs earlier.
(2) For spools that have not been inspected using ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, or an earlier revision of ASB 72-A0848 or SB 72-0848, inspect the web and hub-to- web transition areas in accordance with the requirements of ASB CF6- 80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1000 CSN, or
(ii) The next required inspection to ASB CF6-80C2 S/B 72-A0812, Revision 4, dated October 2, 2002, or
(iii) From July 29, 2001 through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.
(3) For spools that have not been inspected using ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002, or an earlier revision of ASB 72-A0934, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first HPCR exposure after 1,000 CSN, or
(iii) The next required inspection to ASB
CF6-80C2 S/B 72-A0812, Revision 4, dated October 2, 2002.
Repetitive Inspection
(4) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, reinspect the hub and bore in accordance with ASB 72-A812, Revision 4, dated October 2, 2002; the web and hub-to-web transition areas in accordance with ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002; and the stage 3-5 dovetail slot bottoms in accordance with ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002, at the earliest of:
(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or
(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of Table 4.
(iii) After January 27, 2003, before the cycle limits of Table 5.
Spool Disposition
(5) If inspection findings equal or exceed the reject limits established by ASB CF6-80C2 S/B 72-A0812, Revision 4, dated October 2, 2002, or ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, or ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002; replace spool before further flight.
Spool ReinstallationLimit
(6) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 1781M52P01, 1781M52P02, 1854M95P02, 1854M95P05, and 9380M28P05, installed where the spool has 10,500 or more CSN.
CF6-80C2 9 and 10-Inch Billet Spools
(j) For CF6 HPCR stage 3-9 spool, P/Ns 1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09, 1781M53G01,1781M53G02, 1781M53G03, 1781M53G04, 1781M53G06, 1781M53G07, 1781M53G08, 1781M53G09, 1854M95P01, 1854M95P03, 1854M95P04, 1854M95P06, and 1854M95P07, do the following:
Initial Inspection
(1) If the spool has greater than 7,000 CSN on the effective date of this AD and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B AND one from Column C; OR a combination of one procedure from Column D AND one from Column E, or if the spool has not been inspected using ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, or anearlier revision of ASB 72-A0848 or SB 72-0848, inspect the hub and bore in accordance with ASB CF6-80C2 S/ B 72-A0812, Revision 4, dated October 2, 2002; and the web and hub- to-web transition areas in accordance with ASB CF6-80C2 S/B 72- A0848, Revision 8, dated October 2, 2002, before further flight.
(2) If the spool has 7,000 or fewer CSN on the effective date of this AD, and has not already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect the hub and bore in accordance with ASB CF6-80C2 S/B 72-A0812, Revision 4, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 3,000 CSN, or
(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.
(3) If the spool has 7,000 or fewer CSN on the effective date of this AD, and has not already been inspected using ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, or an earlier revision of ASB 72-A0848 or SB CF6-80C2 72-0848, inspect the web and the web and hub-to-web transition areas in accordance with CF6-80C2 S/B 72- A0848, Revision 8, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 3,000 CSN, or
(iii) From July 29, 2001, through July 28, 2003, before 7,000 CSN and after July 28, 2003, before 3,500 CSN.
(4) For spools that have not been inspected using ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002, or an earlier revision of ASB 72-A0934, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) Within 4,000 additional CIS after the effective date of this AD.Repetitive Inspection
(5) For spools that have already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, reinspect the hub and bore in accordance with the requirements of ASB CF6-80C2 S/B 72- A0812, Revision 4, dated October 2, 2002, and the web and hub-to-web transition areas in accordance with ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, at the earlier of:
(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or
(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of Table 6, and after January 27, 2003, before the cycle limits of Table 5.
Spool Disposition
(6) If inspection findings equal or exceed the reject limits established by ASB CF6-80C2 S/B 72-A0812, Revision 4, dated Revision 4, dated October 2, 2002, or ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, or ASB CF6-80C2 S/B 72\A0934, Revision 4, dated October 2, 2002; replace spool before further flight.
Spool Reinstallation Limit
(7) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 1333M66G01, 1333M66G03, 1333M66G07, 1333M66G09, 1781M53G01, 1781M53G02, 1781M53G03, 1781M53G04, 1781M53G06, 1781M53G07, 1781M53G08, 1781M53G09, 1854M95P01, 1854M95P03, 1854M95P04, 1854M95P06 and 1854M95P07, installed where the spool has 10,500 or more CSN.
CF6-80C2 8-Inch Billet 2-Piece Spools
(k) For CF6 HPCR stage 3-9 spool, P/N's 1333M66G10, 1781M53G05, 1781M53G010, and 1854M95P08, do the following:
(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of Table 9; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with the piece-part level inspection of ASB 72- A0812, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(2) For spools that have not been inspected using ASB 72-A0848, Revision 8, dated October 2, 2002, or an earlier revision of ASB 72- A0848, or SB 72-0848, inspect the web and hub-to-web transition areas in accordance with the requirements of ASB CF6-80C2 S/B 72- A0848, Revision 8, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(3) For spools that have not been inspected using ASB CF6-80C2 S/B 72-A0934, Revision 3, dated October 2, 2002, or an earlier revision of ASB 72-A0934, inspect the stage 3-5 dovetail slot bottom in accordance with the requirements of ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
Spool Disposition
(4) If inspection findings equal or exceed the reject limits established by ASB CF6-80C2 S/B 72-A0812, Revision 4, dated October 2, 2002, or ASB CF6-80C2 S/B 72-A0848, Revision 8, dated October 2, 2002, or ASB CF6-80C2 S/B 72-A0934, Revision 4, dated October 2, 2002; replace spool before further flight.
CF6-80E1 9&10-Inch Billet Spools
(l) For CF6 HPCR stage 3-9 spool, P/N's 1669M22G01, 1669M22G03, 1782M22G01 and 1782M22G02, do the following:
Initial Inspection
(1) If the spool has greater than 7,000 CSN and has not already been inspected using one of the ASB's listed in Column A of the following Table 10; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, OR if the spool has not been inspected using ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002, or an earlier revision of ASB 72-A0126, or SB 72-0126, inspect the hub and bore in accordance with ASB CF6-80E1 S/B 72-A0135, Revision 3, dated October 2, 2002; and the web and hub-to-web transition areas in accordance with ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002, before further flight.
Table 10
Procedures (70-32-XX) in standard practices manual GEK9250
CF6-80E1 SB No. Column A
Column B
Column C
Column D
Column E
ASB 72-A0135, dated August 13, 1998.
ASB 72-A0135, Revision 1, dated October 28, 1999.
ASB 72-A0135, Revision 2, dated June 6, 2001.
ASB CF6-80E1 S/B 72-A0135, Revision 3, dated October 2, 2002.
70-32-09, Revision 71, dated October 1, 1995.
70-32-09, Revision 71, dated November 15, 1996.
70-32-09, Revision 74, dated May 1, 1998.
70-32-10, Revision 71, dated October 1, 1995.
70-32-10, Revision 71, dated November 15, 1996.
70-32-10, Revision 74, dated May 1, 1998.
70-32-10, Revision 75, dated December 15, 1998.
70-32-13, Temporary Revision (TR), 70-25, dated August 26, 1996.
70-32-13,Revision 72, dated November 15, 1996.
70-32-13, Revision 73, dated November 1, 1997
70-32-13, Revision 75, dated December 15, 1998.
70-32-13, TR 70-41, dated February 10, 1999 70-31-13, Revision 76, dated May 15, 1999.
70-31-17, TR 70-39, dated December 15, 1998.
70-31-17, Revision 76, dated May 15, 1999.
70-31-17 TR 70-47, dated October 28, 1999.
70-32-14, TR 70-26, dated August 26, 1996.
70-32-14, Revision 71, dated November 15, 1996.
70-32-14, Revision 73, dated November 1, 1997.
70-32-14, Revision 75, dated December 15, 1998.
70-41, TR 70-42, dated February 10, 1999.
70-31-14, Revision 76, dated May 15, 1999.
70-31-18, TR 70-40, dated December 15, 1998.
70-31-18, Revision 76, dated May 15, 1999.
70-31-18 TR 70-48, dated October 28, 1999.
(2) If the spool has 7,000 or fewer CSN and has not already been inspected using one of the ASB's listed in Column A of Table 10; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, OR if the spool has not been inspected using ASB CF6-80E1 S/B 72- A0126, Revision 5, dated October 2, 2002, or an earlier revision of ASB 72-A0126, or SB 72-0126, inspect the hub and bore in accordance with ASB CF6-80E1 S/B 72-A0135, Revision 3, dated October 2, 2002; and the web and hub-to-web transition areas in accordance with ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 3,000 CSN, or
(iii) From July 29, 2001, through January 27, 2003, before 7,000 CSN, and after January 27, 2003, before 3,500 CSN.
(3) Spools not previously inspected using ASB CF6-80E1 S/B 72- A0137, Revision 4, dated October 2, 2002, or an earlier revision of ASB 72-0137, or SB 72-0137, inspect stage 3-5 dovetail slot bottoms in accordance with the requirements of ASB CF6-80E1 S/B 72-A0137, Revision 4, dated October 2, 2002, at the earliest of:
(i) The first PPE after 1,000 CSN, or
(ii) The first HPCR exposure after 1,000 CSN, or
(iii) The next required inspection to ASB
CF6-80E1 S/B 72-A0135, Revision 3, dated October 2, 2002.
Repetitive Inspection
(4) For spools that have already been inspected using one of the ASB's listed in Column A of Table 10; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect the hub and bore in accordance with the requirements of ASB CF6-80E1 S/B 72- A0135, Revision 3, dated October 2, 2002, the web and hub-to-web transition areas in accordance with ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002, and the stage 3-5 dovetail slot bottoms in accordance with ASB CF6-80E1 S/B 72-A0137, Revision 4, dated October 2, 2002, at the earlier of:
(i) Each PPE with more than 1,000 CSLI and 3,500 CSN, or
(ii) From July 29, 2001, through January 27, 2003, before the cycle limits of Table 6, and after January 27, 2003, before the cycle limits of Table 5.
Spool Disposition
(5) If inspection findings equal or exceed the reject limits established by ASB CF6-80E1 S/B 72-A0135, Revision 3, dated October 2, 2002; ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002; and ASB CF6-80E1 S/B 72-A0137, Revision 4, dated October 2, 2002; replace spool before further flight.
Spool Reinstallation Limit
(6) After the effective date of this AD, do not install any engine that has an HPCR stage 3-9 spool, P/N's 1669M22G01, 1669M22G03, 1782M22G01, and 1782M22G02, installed where the spool has 10,500 or more CSN.
CF6-80E1 8-Inch Billet 2-Piece Spools
(m) For CF6 HPCR stage 3-9 spool, P/N 1782M22G04, do the following:
(1) If the spool has not already been inspected using one of the ASB's or SB's listed in Column A of the following Table 9; OR a combination of one procedure from Column B and one from Column C; OR a combination of one procedure from Column D and one from Column E, inspect hub and bore in accordance with the piece-part level inspection of ASB CF6-80E1 S/B 72-A0135, Revision 3, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(2) For spools that have not been inspected using ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002, or an earlier revision of ASB 72-A0126, or SB 72-0126, inspect the web and hub-to- web transition areas in accordance with ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
(3) For spools that have not been inspected using ASB CF6-80E1 S/B 72-A0137, Revision 4, dated October 2, 2002, or an earlier revision of ASB 72-A0137, or SB 72-0137, inspect the stage 3-5 dovetail slot bottoms in accordance with ASB CF6-80E1 S/B 72-A0137, Revision 4, dated October 2, 2002, at the earlier of:
(i) The first PPE after 1,000 CSN, or
(ii) The first ESV after 6,000 CSN.
Spool Disposition
(4) If inspection findings equal or exceed the reject limits established by ASB CF6-80E1 S/B 72-A0135, Revision 3, dated October 2, 2002; ASB CF6-80E1 S/B 72-A0126, Revision 5, dated October 2, 2002; and ASB CF6-80E1 S/B 72-A0137, Revision 4, dated October 2, 2002; replace spool before further flight.
Reporting Requirements
(n) Within five calendar days of inspection, report the results of inspections that equal or exceed the reject criteria to: Engine Certification Office, FAA, Engine and Propeller Directorate, 12 New England Executive park, Burlington, MA 01803-5299; telephone (781) 238-7147; fax (781) 238-7199. Reporting requirements have been approved by the Office of Management and Budget and assigned OMB control number 2120-0056. Be sure to include the following information:
(1) Part Number.
(2) SerialNumber.
(3) Spool CSN.
(4) Spool CSLI.
(5) Date and location where inspection was done.
Definitions
(o) For the purpose of this AD, the following definitions apply:
(1) A module level exposure is a separation of the fan module from the engine.
(2) An HPC rotor exposure is a HPC top or bottom case removal.
(3) A PPE is a disassembly and removal of the stage 3-9 spool from the HPCR structure, regardless of any blades, locking lugs, bolts or balance weights assembled to the spool.
(4) An ESV is the introduction of an engine into the shop where the separation of a major engine flange will occur after the effective date of this AD.
(5) The following maintenance actions, or any combination, are not considered ESV's for requiring repeat inspections:
(i) Introduction of an engine into a shop solely for removal of the compressor top or bottom case for airfoil maintenance or variable stator vane bushing replacement.
(ii) Introduction ofan engine into a shop solely for removal or replacement of the Stage 1 Fan Disk.
(iii) Introduction of an engine into a shop solely for replacement of the Turbine Rear Frame.
(iv) Introduction of an engine into a shop solely for replacement of the Accessory and/or Transfer Gearboxes.
(v) Introduction of an engine into a shop solely for replacement of the Fan Forward Case.
Alternative Methods of Compliance
(p) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Engine Certification Office (ECO). Operators must submit their request through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, ECO.
Note 2: Information concerning the existence of approved alternative methods of compliance with this airworthiness directive, if any, may be obtained from the ECO.
Special Flight Permits
(q) Special flight permits may be issued in accordance with Sec. Sec. 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be done.
Documents That Have Been Incorporated By Reference
(r) The inspections must be done in accordance with the following GE Aircraft Engines alert service bulletins (ASB's):
Document No.
Pages
Revision
Date
ASB CF6-50 S/B 72-A1108.
Total pages: 7
ASB CF6-50 S/B 72-A1131
Total pages: 43.
ASB CF6-50 S/B 72-A1157
Total pages: 38
ASB CF6-80A S/B 72-A0678
Total pages: 7
ASB CF6-80A S/B 72-A0691
Total pages: 43
ASB CF6-80A S/B 72-A0719
Total pages: 38
ASB CF6-80C2 S/B 72-A0812
Total pages: 6
ASB CF6-80C2 S/B 72-A0848
Total pages: 43
ASB CF6-80C2 S/B 72-A0934
Total pages: 38
ASB CF6-80E1 S/B 72-A0126
Total pages: 44
ASB CF6-80E1 S/B 72-A0135
Total pages: 6
ASB CF6-80E1 S/B 72-A0137
Total pages: 38
All
All
All
All
AllAll
All
All
All
All
All
All
5
4
4
5
5
5
4
8
4
5
3
4
October 2, 2002.
Do
Do
Do
Do
Do
Do
Do
Do
Do
Do
Do
This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from General Electric Company via Lockheed Martin Technology Services, 10525 Chester Road, Suite C, Cincinnati, Ohio 45215, telephone (513) 672-8400, fax (513) 672- 8422. Copies may be inspected at the FAA, New England Region, Office of the Regional Counsel, 12 New England Executive Park, Burlington, MA; or at the Office of the
Effective Date
(s) This amendment becomes effective on January 23, 2003.