2008-06-23 McDonnell Douglas: Amendment 39-15435. Docket No. FAA- 2007-0216; Directorate Identifier 2007-NM-122-AD. \n\nEffective Date \n\n\t(a) This AD becomes effective April 22, 2008. \n\nAffected ADs \n\n\t(b) This AD supersedes AD 2007-02-02. \n\nApplicability \n\n\t(c) This AD applies to McDonnell Douglas Model DC-8-55, DC-8F- 54, DC-8F-55, DC-8-61, DC-8-62, DC-8-63, DC-8-61F, DC-8-62F, DC-8- 63F, DC-8-71, DC-8-72, DC-8-73, DC-8-71F, DC-8-72F, and DC-8-73F airplanes, certificated in any category; as identified in Boeing Alert Service Bulletin DC8-53A080, dated June 22, 2004. \n\nUnsafe Condition \n\n\t(d) This AD results from our determination that the inspections and actions described in the existing AD do not adequately address the unsafe condition. We are issuing this AD to detect and correct cracks in the aft fuselage skin at the longeron 28 skin splice, which could lead to loss of structural integrity of the aft fuselage, resulting in rapid decompression of the airplane. \n\nCompliance \n\n\t(e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. \n\nRequirements of AD 2007-02-02 \n\nOne-Time Inspection for Previous Repairs \n\n\t(f) For all airplanes: At the applicable time in paragraph (f)(1) or (f)(2) of this AD, do a general visual inspection to determine if there are previous repairs of the aft fuselage skin panel at the longeron 28 skin splice; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC8- 53A080, dated June 22, 2004. Then do the applicable actions specified in paragraphs (g) and (h) of this AD. \n\t(1) For airplanes that have accumulated fewer than 24,000 total flight cycles as of February 28, 2007 (the effective date of AD 2007-02-02): Within 24 months after February 28, 2007, or prior to accumulating 24,000 total flight cycles, whichever occurs later. \n\t(2) For airplanes that have accumulated 24,000 total flight cycles or more as of February 28, 2007: Within 12 months after February 28, 2007. \n\n\tNote 1: For the purposes of this AD, a general visual inspection is: "A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.'' \n\nRepetitive Inspections for Areas That Do Not Have a Previous Repair \n\n\t(g) For areas that do not have a previous repair: Before further flight after the initial inspection in paragraph (f) of this AD, do general visual and high-frequency eddy current (HFEC) inspections for discrepancies at longeron 28 between the bolted connection of the tail section to forward of the flat aft pressure bulkhead, on both the left and right sides, and do all applicable related investigative and corrective actions before further flight. Do all actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC8-53A080, dated June 22, 2004. Repeat the general visual and HFEC inspections thereafter at intervals not to exceed 2,000 flight cycles until an optional action in paragraph (i) of this AD is accomplished. \n\nRepetitive Inspections and Repair for Areas That Have a Previous Repair \n\n\t(h) For areas that have a previous repair: Within 24 months after accomplishing the initial inspection in paragraph (f) of this AD, remove the previous repair(s), and install a local repair, in accordance with Boeing DC-8 Service Rework Drawing SR08530032, dated January 13, 2004, including Boeing Parts List PL SR08530032, dated January 7, 2004, Boeing Advance Engineering Order, Advanced Drawing Change A, dated April 1, 2004, and Boeing Engineering Order, dated January 13, 2004. Do the inspections in paragraph (j) of this AD thereafter at the applicable interval specified in paragraph (j)(1) or (j)(2) of this AD. \n\nNew Requirements of This AD \n\nOptional Modification/Repair \n\n\t(i) Installing a full-length preventive modification, doing a full-length repair, or doing a local repair, in accordance with Boeing DC-8 Service Rework Drawing SR08530032, dated January 13, 2004, including Boeing Parts List PL SR08530032, dated January 7, 2004; Boeing Advance Engineering Order, Advanced Drawing Change A, dated April 1, 2004; and Boeing Engineering Order, dated January 13, 2004; ends the repetitive inspection intervals specified in paragraph (g) of this AD. \n\nExtended Repetitive Inspection Intervals \n\n\t(j) After removing the previous repair(s) and doing the actions specified in paragraph (h) of this AD or doing any optional repair or modification described in paragraph (i) of this AD: Do the actions described in paragraph (j)(1) or (j)(2) of this AD as applicable, in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC8-53A080, dated June 22, 2004. If any discrepancy is discovered during any inspection required by this paragraph, before further flight, repair the discrepancy using a method approved in accordance with the procedures specified in paragraph (l) of this AD. \n\t(1) For areas that have been repaired on airplanes that do have internal finger doublers installed: Within 30,000 flight cycles after doing the optional repair or modification, do a general visual inspection for discrepancies along all four external edges of the doublers. Repeat the inspection thereafter at intervals not to exceed 5,000 flight cycles. \n\t(2) For areas that have been repaired on airplanes that do not have internal finger doublers installed: Do the actions specified in paragraph (j)(2)(i) or (j)(2)(ii) of this AD, as applicable. \n\t(i) For any repair that is 12 inches or less along the longeron: Within 15,000 flight cycles after removing the previous repair(s) and doing the actions specified in paragraph (h) of this AD or doing any optional repair or modification specified in paragraph (i) of this AD, do a general visual inspection for discrepancies along all four external edges of the doublers. Repeat the general visual inspection thereafter at intervals not to exceed 5,000 flight cycles. \n\t(ii) For any repair that is greater than 12 inches in length along the longeron: Within 15,000 flight cycles after removing the previous repair(s) and doing the actions specified in paragraph (h) of this AD or doing any optional repair or modification specified in paragraph (i) of this AD, do a low-frequency eddy current (LFEC) inspection for discrepancies along all four external edges of the doublers. Repeat the LFEC inspection thereafter at intervals not to exceed 10,000 flight cycles. \n\nReporting of Results \n\n\t(k) Submit a report of positive findings of the inspections required by paragraphs (g) and (j) of this AD to Boeing Commercial Airplanes, Manager, Structure/Payloads, Technical and Fleet Support, Service Engineering/Commercial Aviation Services, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, at the applicable time specified in paragraph (k)(1) or (k)(2) of this AD. The report must include the inspection results, a description of any discrepancies found, the airplane fuselage number, and the total number of landings and flight hours on the airplane. Information collection requirements contained in this AD have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\t(1) For any inspection accomplished after the effective date of this AD: Submit the report within30 days after performing the inspection. \n\t(2) For any inspection accomplished prior to the effective date of this AD: Submit the report within 30 days after the effective date of this AD. \n\nAlternative Methods of Compliance (AMOCs) \n\n\t(l)(1) The Manager, Los Angeles Aircraft Certification Office (ACO), FAA, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. \n\t(2) To request a different method of compliance or a different compliance time for this AD, follow the procedures in 14 CFR 39.19. Before using any approved AMOC on any airplane to which the AMOC applies, notify your appropriate principal inspector (PI) in the FAA Flight Standards District Office (FSDO), or lacking a PI, your local FSDO. \n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD, if it is approved by an Authorized Representative for the Boeing Commercial Airplanes Delegation Option AuthorizationOrganization who has been authorized by the Manager, Los Angeles ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane and 14 CFR 25.571, Amendment 45, and the approval must specifically refer to this AD. \n\t(4) AMOCs approved previously in accordance with AD 2007-02-02, are approved as AMOCs for the corresponding provisions of this AD. \n\nMaterial Incorporated by Reference \n\n\t(m) You must use Boeing Alert Service Bulletin DC8-53A080, dated June 22, 2004; and Boeing DC-8 Service Rework Drawing SR08530032, dated January 13, 2004, including Boeing Parts List PL SR08530032, dated January 7, 2004, Boeing Advance Engineering Order, Advanced Drawing Change A, dated April 1, 2004, and Boeing Engineering Order, dated January 13, 2004; as applicable, to perform the actions that are required by this AD, unless the AD specifies otherwise. \n\t(1) On February 28, 2007 (72 FR 3044, January 24, 2007), the Director of the Federal Register approved the incorporation by reference of these documents. \n\t(2) Contact Boeing Commercial Airplanes, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention: Data and Service Management, Dept. C1-L5A (D800-0024), for a copy of this service information. You may review copies at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal- register/cfr/ibr-locations.html.