2007-02-02 McDonnell Douglas: Amendment 39-14889. Docket 2001-NM- 183-AD. \n\nApplicability \n\n\tMcDonnell Douglas Model DC-8-55, DC-8F-54, DC-8F-55, DC-8-61, DC-8-62, DC-8-63, DC-8-61F, DC-8-62F, DC-8-63F, DC-8-71, DC-8-72, DC-8-73, DC-8-71F, DC-8-72F, and DC-8-73F airplanes; certificated in any category; as identified in Boeing Alert Service Bulletin DC8- 53A080, dated June 22, 2004. \n\nCompliance \n\n\tRequired as indicated, unless accomplished previously. \n\n\tTo detect and correct cracks in the aft fuselage skin at the longeron 28 skin splice, which could lead to loss of structural integrity of the aft fuselage, resulting in rapid decompression of the airplane, accomplish the following: \n\nOne-Time Inspection for Previous Repairs \n\n\t(a) For all airplanes: At the applicable time in paragraph (a)(1) or (a)(2) of this AD, do a general visual inspection to determine if there are previous repairs of the aft fuselage skin panel at the longeron 28 skin splice; in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC8- 53A080, dated June 22, 2004. Then do the applicable actions specified in paragraphs (b) and (c) of this AD. \n\n\t(1) For airplanes that have accumulated fewer than 24,000 total flight cycles as of the effective date of this AD: Within 24 months after the effective date of this AD or prior to accumulating 24,000 total flight cycles, whichever occurs later. \n\n\t(2) For airplanes that have accumulated 24,000 total flight cycles or more as of the effective date of this AD: Within 12 months after the effective date of this AD. \n\n\tNote 1: For the purposes of this AD, a general visual inspection is: "A visual examination of an interior or exterior area, installation, or assembly to detect obvious damage, failure, or irregularity. This level of inspection is made from within touching distance unless otherwise specified. A mirror may be necessary to ensure visual access to all surfaces in the inspection area. This level of inspection is made under normally available lighting conditions such as daylight, hangar lighting, flashlight, or droplight and may require removal or opening of access panels or doors. Stands, ladders, or platforms may be required to gain proximity to the area being checked.'' \n\nRepetitive Inspections for Areas That Do Not Have a Previous Repair \n\n\t(b) For areas that do not have a previous repair: Before further flight after the initial inspection in paragraph (a) of this AD, do general visual and high-frequency eddy current (HFEC) inspections for discrepancies of the unrepaired areas at longeron 28 between the bolted connection of the tail section to forward of the flat aft pressure bulkhead, on both the left and right sides, and do all applicable related investigative and corrective actions before further flight. Do all actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC8-53A080, dated June 22, 2004. Repeat the inspections thereafter atintervals not to exceed 2,000 flight cycles until an optional action in paragraph (d) of this AD is accomplished. \n\nRepetitive Inspections and Repair for Areas That Have a Previous Repair \n\n\t(c) For areas that have a previous repair: Within 24 months after accomplishing the initial inspection in paragraph (a) of this AD, remove the previous repair(s), and install a local repair, in accordance with Boeing DC-8 Service Rework Drawing SR08530032, dated January 13, 2004, including Boeing Parts List PL SR08530032, dated January 7, 2004, Boeing Advance Engineering Order, Advanced Drawing Change A, dated April 1, 2004, and Boeing Engineering Order, dated January 13, 2004. Do the inspections in paragraph (d) of this AD thereafter at the applicable interval specified in paragraph (d)(1) or (d)(2) of this AD. \n\nOptional Actions, Extended Repetitive Inspection Intervals \n\n\t(d) Installing a full-length preventive modification, doing a full-length repair, or doing a local repair, in accordance with Boeing DC-8 Service Rework Drawing SR08530032, dated January 13, 2004, including Boeing Parts List PL SR08530032, dated January 7, 2004, Boeing Advance Engineering Order, Advanced Drawing Change A, dated April 1, 2004, and Boeing Engineering Order, dated January 13, 2004, ends the repetitive inspection intervals in paragraph (b) of this AD; repeat the inspection thereafter at the applicable interval in paragraph (d)(1) or (d)(2) of this AD. \n\n\t(1) For airplanes that have internal finger doublers: Within 30,000 flight cycles after doing the optional action, do general visual and HFEC inspections for discrepancies of the unrepaired areas at longeron 28 between the bolted connection of the tail section to forward of the flat aft pressure bulkhead, on both the left and right sides, and do all applicable related investigative and corrective actions before further flight. Do all actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC8-53A080,dated June 22, 2004. Repeat the inspections thereafter at intervals not to exceed 5,000 flight cycles. \n\n\t(2) For airplanes that do not have internal finger doublers: Use the applicable intervals and inspections in paragraph (d)(2)(i) or (d)(2)(ii) of this AD. \n\t(i) For repairs (full-length preventive modification, doing a full-length repair, or doing a local repair) that are 12 inches or less along the longeron: Within 15,000 flight cycles after doing the optional action, use only the external general visual inspection method for discrepancies of the unrepaired areas at longeron 28 between the bolted connection of the tail section to forward of the flat aft pressure bulkhead, on both the left and right sides, and do all applicable related investigative and corrective actions before further flight. Do all actions in accordance with the Accomplishment Instructions of Boeing Alert Service Bulletin DC8-53A080, dated June 22, 2004. Repeat the external general visual inspection thereafter at intervals not to exceed 5,000 flight cycles. \n\n\t(ii) For repairs (full-length preventive modification, doing a full-length repair, or doing a local repair) that are more than 12 inches in length along the longeron: Within 15,000 flight cycles after doing the optional action, use only the low-frequency eddy current (LFEC) inspection method for cracks of the unrepaired areas at longeron 28 between the bolted connection of the tail section to forward of the flat aft pressure bulkhead, on both the left and right sides, and do all applicable related investigative and corrective actions before further flight. Do all actions in accordance with Boeing DC-8 Service Rework Drawing SR08530032, dated January 13, 2004, including Boeing Parts List PL SR08530032, dated January 7, 2004, Boeing Advance Engineering Order, Advanced Drawing Change A, dated April 1, 2004, and Boeing Engineering Order, dated January 13, 2004. Repeat the LFEC inspection thereafter at intervals not to exceed 10,000 flight cycles, using only LFEC inspection outward along all four edges of the doubler. \n\nReporting of Results \n\n\t(e) Submit a report of positive findings of the inspections required by paragraphs (b) and (d) of this AD to Boeing Commercial Airplanes, Manager, Structure/Payloads, Technical and Fleet Support, Service Engineering/Commercial Aviation Services, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, at the applicable time specified in paragraph (e)(1) or (e)(2) of this AD. The report must include the inspection results, a description of any discrepancies found, the airplane fuselage number, and the total number of landings and flight hours on the airplane. Information collection requirements contained in this AD have been approved by the Office of Management and Budget (OMB) under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq.) and have been assigned OMB Control Number 2120-0056. \n\n\t(1) For airplanes on which the inspection isaccomplished after the effective date of this AD: Submit the report within 30 days after performing the inspection. \n\n\t(2) For airplanes on which the inspection was accomplished prior to the effective date of this AD: Submit the report within 30 days after the effective date of this AD. \n\nAlternative Methods of Compliance (AMOCs) \n\n\t(f)(1) In accordance with 14 CFR 39.19, the Manager, Los Angeles Aircraft Certification Office (ACO), FAA, is authorized to approve AMOCs for this AD. \n\n\t(2) Before using any AMOC approved in accordance with Sec. 39.19 on any airplane to which the AMOC applies, notify the appropriate principal inspector in the FAA Flight Standards Certificate Holding District Office. \n\n\t(3) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD, if it is approved by an Authorized Representative for the Boeing Commercial Airplanes Delegation Option Authorization Organization who has been authorized by the Manager, Los Angeles ACO, to make those findings. For a repair method to be approved, the repair must meet the certification basis of the airplane and 14 CFR 25.571, Amendment 45, and the approval must specifically refer to this AD. \n\nIncorporation by Reference \n\n\t(g) Unless otherwise specified in this AD, the actions must be done in accordance with Boeing Alert Service Bulletin DC8-53A080, dated June 22, 2004; and Boeing DC-8 Service Rework Drawing SR08530032, dated January 13, 2004, including Boeing Parts List PL SR08530032, dated January 7, 2004, Boeing Advance Engineering Order, Advanced Drawing Change A, dated April 1, 2004, and Boeing Engineering Order, dated January 13, 2004; as applicable. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. To get copies of this service information, contact Boeing Commercial Airplanes, Long Beach Division, 3855 Lakewood Boulevard, Long Beach, California 90846, Attention:Data and Service Management, Dept. C1-L5A (D800-0024). To inspect copies of this service information, go to the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; to the FAA, Los Angeles Aircraft Certification Office, 3960 Paramount Boulevard, Lakewood, California; or to the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html . \n\nEffective Date \n\n\t(h) This amendment becomes effective on February 28, 2007.