2005-13-05 Boeing: Amendment 39-14141. Docket No. FAA-2004-19678; Directorate Identifier 2004-NM-62-AD. \n\nEffective Date \n\n\t(a) This AD becomes effective July 27, 2005. \n\nAffected ADs \n\n\t(b) None. \n\n\tApplicability: (c) This AD applies to Model 747-400F series airplanes, certificated in any category, as listed in Boeing Alert Service Bulletin 747-53A2443, dated May 9, 2002. \n\nUnsafe Condition \n\n\t(d) This AD was prompted by reports of fatigue cracking found on the upper deck floor beam to frame attachment points. We are issuing this AD to prevent fatigue cracks in the upper chord, upper chord strap, and web of the upper deck floor beams and the resultant failure of the floor beams. Failure of a floor beam could result in damage to critical flight control cables and wire bundles that pass through the floor beam, and consequent loss of controllability of the airplane. Failure of the floor beam also could result in the failure of the adjacent fuselage frames and skin, and consequent rapid decompression of the airplane. \n\n\tCompliance: (e) You are responsible for having the actions required by this AD performed within the compliance times specified, unless the actions have already been done. \n\nService Bulletin Reference \n\n\t(f) For the purposes of this AD, the term "service bulletin" means the Accomplishment Instructions of Boeing Alert Service Bulletin 747-53A2443, dated May 9, 2002. \n\nInspections/Repair/Modification \n\n\t(g) Before the accumulation of 15,000 total flight cycles, or within 1,000 flight cycles after the effective date of this AD, whichever is later: Accomplish detailed and open-hole high frequency eddy current (HFEC) inspections for cracking of the web, upper chord, and upper chord strap of the upper deck floor beams, by doing all the applicable actions in accordance with Part 3.B.1. of the service bulletin. \n\n\tNote 1: For the purposes of this AD, a detailed inspection is: "An intensive examination of a specific item, installation,or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at an intensity deemed appropriate. Inspection aids such as mirror, magnifying lenses, etc., may be necessary. Surface cleaning and elaborate procedures may be required." \n\n\t(h) If any crack is found during any inspection required by paragraph (g) of this AD: Before further flight, accomplish the actions required by paragraph (h)(1) and (h)(2) of this AD. \n\n\t(1) Repair in accordance with the service bulletin; except where the service bulletin specifies to contact Boeing for appropriate action, before further flight, repair in accordance with a method approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA; or according to data meeting the type certification basis of the airplane approved by a Boeing Company Designated Engineering Representative (DER) who has been authorized by the Manager, Seattle ACO, to make such findings. For a repair method to be approved by the Manager, Seattle ACO, as required by this paragraph, the Manager's approval letter must specifically reference this AD. \n\n\t(2) Accomplish the inspections and preventive modification of the floor beams by doing all the actions in accordance with Part 3.B.2. or Part 3.B.3. of the service bulletin, as applicable. If any crack is found during any inspection, before further flight, repair as required by paragraph (h)(1) of this AD. \n\n\t(i) If no crack is found during any inspection required by paragraph (g) of this AD: Accomplish the actions required by either paragraph (i)(1) or (i)(2) of this AD, at the time specified. \n\n\t(1) Before further flight: Accomplish the inspections and preventive modification of the floor beam by doing all the actions in accordance with Part 3.B.2 or Part 3.B.3. of the service bulletin, as applicable. If the preventive modification is performed concurrently with the inspections required by paragraph (g) of this AD, the upper chord straps must be removed when performing the open- hole HFEC inspection. If any crack is found during any inspection, before further flight, repair as required by paragraph (h)(1) of this AD. \n\n\t(2) Before the accumulation of 20,000 total flight cycles, or within 1,000 flight cycles after the effective date of this AD, whichever is later: Accomplish the inspections and preventive modification of the upper deck floor beams, by doing all the actions in accordance with Part 3.B.2. or 3.B.3. of the service bulletin, as applicable. If any crack is found during any inspection, before further flight, repair as required by paragraph (h)(1) of this AD. \n\nPost-Modification Inspections \n\n\t(j) Within 15,000 flight cycles after accomplishing the applicable preventive modification required by paragraph (h)(2), (i)(1), or (i)(2) of this AD: Accomplish the inspections required by either paragraph (j)(1) or (j)(2) of this AD; if any crack is found during any inspection, before furtherflight, repair as required by paragraph (h)(1) of this AD. \n\n\t(1) Accomplish detailed and surface HFEC inspections for cracking of the web, upper chord, and upper chord strap of the upper deck floor beams, by doing all the applicable actions in accordance with Part 3.B.4. of the service bulletin. If no crack is found, repeat the inspections at intervals not to exceed 1,000 flight cycles. \n\n\t(2) Accomplish detailed and open-hole HFEC inspections for cracking of the web, upper chord, and strap of the upper deck floor beams, by doing all the applicable actions in accordance with Part 3.B.5. of the service bulletin. If no crack is found, repeat the inspections at intervals not to exceed 5,000 flight cycles. \n\n\tNote 2: There is no terminating action currently available for the repetitive inspections required by this AD. \n\nAlternative Methods of Compliance (AMOCs) \n\n\t(k)(1) The Manager, Seattle ACO, has the authority to approve AMOCs for this AD, if requested in accordance with the procedures found in 14 CFR 39.19. \n\n\t(2) An AMOC that provides an acceptable level of safety may be used for any repair required by this AD, if it is approved by a Boeing Company DER who has been authorized by the Manager, Seattle ACO, to make those findings. For a repair method to be approved, the approval must specifically refer to this AD. \n\nMaterial Incorporated by Reference \n\n\t(l) You must use Boeing Alert Service Bulletin 747-53A2443, dated May 9, 2002, to perform the actions that are required by this AD, unless the AD specifies otherwise. The Director of the Federal Register approves the incorporation by reference of this document in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. To get copies of the service information, contact Boeing Commercial Airplanes, P.O. Box 3707, Seattle, Washington 98124-2207. To view the AD docket, go to the Docket Management Facility, U.S. Department of Transportation, 400 Seventh Street SW., room PL-401, Nassif Building, Washington, DC.To review copies of the service information, go to the National Archives and Records Administration (NARA). For information on the availability of this material at the NARA, call (202) 741-6030, or go to http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.