2003-08-11 Boeing: Amendment 39-13124. Docket 2003-NM-15-AD. \n\n\tApplicability: All Model 747-100, -200B, -200F, -200C, -100B, - 300, -100B SUD, -400, -400D, and -400F series airplanes; and all Model 747SR series airplanes; certificated in any category. \n\n\tNote 1: This AD applies to each airplane identified in the preceding applicability provision, regardless of whether it has been modified, altered, or repaired in the area subject to the requirements of this AD. For airplanes that have been modified, altered, or repaired so that the performance of the requirements of this AD is affected, the owner/operator must request approval for an alternative method of compliance in accordance with paragraph (f) of this AD. The request should include an assessment of the effect of the modification, alteration, or repair on the unsafe condition addressed by this AD; and, if the unsafe condition has not been eliminated, the request should include specific proposed actions to address it. \n\n\tCompliance: Required as indicated, unless accomplished previously. \n\n\tTo detect and correct cracking and other damage of the actuator attach fittings of the trailing edge flaps, which could result in abnormal operation or retraction of a trailing edge flap, and possible loss of controllability of the airplane, accomplish the following: \n\nInspection: Inboard Flap Attach Fittings \n\n\t(a) Perform borescopic and detailed inspections to detect discrepancies of the inboard flap attach fittings, in accordance with Part 1 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-57A2316, dated December 19, 2002. Discrepancies include corrosion, pitting, and damaged or missing cadmium plating. Do the inspection at the applicable time specified in paragraph (a)(1) or (a)(2) of this AD. \n\n\tNote 2: For the purposes of this AD, a detailed inspection is defined as: "An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required." \n\n\t(1) If the age of the fittings can be determined: Inspect within 14 years since the fittings were new or last overhauled, or within 90 days after the effective date of this AD, whichever occurs later. \n\n\t(2) If the age of the fittings cannot be determined: Inspect within 90 days after the effective date of this AD. \n\n\tNote 3: The exceptions specified in flag note 4 of Figure 1 of Boeing Alert Service Bulletin 747-57A2316, dated December 19, 2002, apply to the requirements of paragraphs (a) and (b) of this AD. \n\nInspection: Outboard Flap Attach Fittings \n\n\t(b) Perform borescopic, detailed, and ultrasonic inspections to detect discrepancies of the outboard flap attach fittings, in accordance with Part 1 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-57A2316, dated December 19, 2002. Discrepancies include surface corrosion, pitting, damaged or missing cadmium plating, and cracks. Do the inspection at the applicable time specified in paragraph (b)(1) or (b)(2) of this AD. \n\n\t(1) If the age of the fittings can be determined: Inspect within 8 years since the fittings were new or last overhauled, or within 90 days after the effective date of this AD, whichever occurs later. \n\n\t(2) If the age of the fittings cannot be determined: Inspect within 90 days after the effective date of this AD. \n\nFollow-on Actions: No Discrepancies Found \n\n\t(c) If no discrepancy is found during any inspection required by paragraph (a) or (b) of this AD: Do the actions specified by either paragraph (c)(1) or paragraph (c)(2) of this AD. \n\n\t(1) Repeat the applicable inspections specified in paragraphs (a) and (b) of this AD at least every 9 months until the actions specified in paragraph (c)(2) of this AD have been accomplished. \n\n\t(2) Perform a detailed inspection of the fitting to detect cracks, corrosion, damaged cadmium plating, or bushing migration, in accordance with and at the time specified in Part 2 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747- 57A2316, dated December 19, 2002. Do the follow-on actions in accordance with Parts 3, 4, and 5 of the Accomplishment Instructions of the service bulletin at the times specified in Figure 1 of the service bulletin, as applicable. Accomplishment of the actions specified by paragraph (c)(2) of this AD terminates the initial and repetitive inspection requirements of paragraphs (a), (b), and (c)(1) of this AD. \n\n\tNote 4: The exceptions specified in flag note 2 of Figure 1 of Boeing Alert Service Bulletin 747-57A2316, dated December 19, 2002, apply to those requirements of paragraphs (c)(2) and (d) of this AD that are specified in Part 2 of the service bulletin. \n\nCorrective/Follow-on Actions: Discrepancies Found \n\n\t(d) If any discrepancy is found during any inspection required by paragraph (a), (b), or (c) of this AD: Perform applicable corrective and follow-on actions at the time specified and in accordance with Figure 1 of Boeing Alert Service Bulletin 747- 57A2316, dated December 19, 2002. Before further flight: Replace any discrepant fitting in accordance with Part 5 of the Accomplishment Instructions of the service bulletin, and accomplish the follow-on actions for the other fitting common to that flap in accordance with Part 2 of the Accomplishment Instructions of the service bulletin. Replacement of a fitting terminates the initial and repetitive inspections--specified in paragraphs (a), (b), and (c) of this AD-- for that fitting only. \n\nOptional Action To Reset Compliance Schedule \n\n\t(e) Replacement of fittings with new or overhauled fittings, in accordance with Part 5 of the Accomplishment Instructions of Boeing Alert Service Bulletin 747-57A2316, dated December 19, 2002, terminates the initial and repetitive inspection requirements of paragraphs (a), (b), and (c) of this AD. \n\nAlternative Methods of Compliance \n\n\t(f) An alternative method of compliance or adjustment of the compliance time that provides an acceptable level of safety may be used if approved by the Manager, Seattle Aircraft Certification Office (ACO), FAA. Operators shall submit their requests through an appropriate FAA Principal Maintenance Inspector, who may add comments and then send it to the Manager, Seattle ACO. \n\n\tNote 5: Information concerning the existence of approved alternative methods of compliance with this AD, if any, may be obtained from the Seattle ACO. \n\nSpecial Flight Permits \n\n\t(g) Special flight permits may be issued in accordance with sections 21.197 and 21.199 of the Federal Aviation Regulations (14 CFR 21.197 and 21.199) to operate the airplane to a location where the requirements of this AD can be accomplished.Incorporation by Reference \n\n\t(h) The actions shall be done in accordance with Boeing Alert Service Bulletin 747-57A2316, dated December 19, 2002. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained from Boeing Commercial Airplane Group, P.O. Box 3707, Seattle, Washington 98124-2207. Copies may be inspected at the FAA, Transport Airplane Directorate, 1601 Lind Avenue, SW., Renton, Washington; or at the Office of the Federal Register, 800 North Capitol Street, NW., suite 700, Washington, DC. \n\nEffective Date \n\n\t(i) This amendment becomes effective on May 8, 2003.